Item48
Resolved
Resolved Conditionally approved:- T003 Outline Planning Permission T004 Outline Planning Permission(2) T009 Amended Plan A004 Samples of Materials U008 Garage Use Restrictions M009 Removal of Permitted Dev Rights E002 Screen Walls Position H021 Wheel Washing H027 Parking for Site Operatives M010 Construction Hours of Works D002 Drainage – details to be submitted D005 Contaminated Drainage D008 Oil/Fuel/Chemical Storage Z001 No development approved by this planning permission shall be commenced until: a) A desktop study has been carried out which shall include the identification of previous site uses, potential contaminants that might reasonably be expected given those uses and other relevant information. And using this information a diagrammatical representation (Conceptual Model) for the site of all potential contaminant sources, pathways and receptors has been produced. b) A site investigation has been designed for the site using the information obtained from the desktop study and any diagrammatical representations (Conceptual Model). This should be submitted to, and approved in writing by the Local Planning Authority prior to that investigation being carried out on the site. The investigation must be comprehensive enough to enable: - a risk assessment to be undertaken relating to groundwater and surface waters associated on and off the site that may be affected and -refinement of the Conceptual Model, and -the development of a Method Statement detailing the remediation requirements. c) The site investigation has been undertaken in accordance with details approved by the Local Planning Authority and a risk assessment has been undertaken. d) A Method Statement detailing the remediation requirements, including measures to minimise the impact on ground and surface waters, using the information obtained from the Site Investigation has been submitted to the Local Planning Authority prior to that remediation being carried out on the site. Reason - To ensure that the proposed site investigations and remediation will not cause pollution of Controlled Waters. Z002 The development of the site must be carried out in accordance with the approved Method Statement. Reason - To ensure that the development complies with approved details in the interests of protection of Controlled Waters. Z003 If during development, contamination not previously identified, is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted, and obtained written approval from the Local planning Authority for, an addendum to the Method Statement. This addendum to the Method Statement must detail how this unsuspected contamination shall be dealt with. Reason - To ensure that the development complies with approved details in the interests of protection of Controlled Waters. Z004 Upon completion of the remediation detailed in the Method Statement a report shall be submitted to the Local Planning Authority that provides verification that the required works regarding contamination have been carried out in accordance with the approved Method Statement(s). Post remediation sampling and monitoring results shall be included in the report to demonstrate that the required remediation has ... view the full minutes text for item 48.
Word for word from the decision Wychavon published for this meeting.
Source: mgov.wychavon.gov.uk