Resolved
Resolved (1) That, subject to (2) below, Planning permission be granted, and that the Head of Planning be authorised to issue the decision notice, subject to the completion of a Section 106 agreement to cover the provision of contributions towards public open space, education facilities, cycling and re-cycling facilities, and such conditions inter alia including the following. (2) That in the event that [the outstanding issue(s)/section 106 Agreement are still not resolved] [the required contribution(s) is/are not paid] 2 working days prior to the date of determination of the application, the Head of Planning be granted delegated authority to refuse the application for reasons deemed appropriate by her:- T002 Detailed Planning Permission A004 Samples of Materials M002 Archaeological Evaluation M010 Construction Hours of Works H013 Access, Turning and Parking H008 Access Closure H027 Parking for Site Operatives A014 Floorslab Levels of New Dwellings/Detailed Consent E001 Details of Boundary Treatment LS02 L/ scape scheme submitted as part of Application Z001 Prior to commencement of the development, details for the disposal of surface water and foul sewage shall be submitted to and approved in writing by the Local Planning Authority and the works shall only be carried out in accordance with those details so approved. Reason - To ensure that the development is provided with a satisfactory means of drainage as well as to reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution. Z002 The applicant shall provide a report to the Local Planning Authority detailing the previous activities and their locations on the site as well as identifying the potential contamination issues associated with such uses. A risk assessment shall be undertaken to determine whether a site investigation is required and this shall be detailed in the report supplied. The risk assessment shall be approved in writing before any development takes place. Reason - To protect human health from contamination associated with the site's former use Z003 A method statement for a targeted investigation of land with respect to possible contamination shall be submitted. The investigation shall not take place until the Local Planning Authority has approved the method statement. The method statement shall consider the contaminants, which may be potentially found on the site, taking into consideration the site characteristics. It shall also be based on the conceptual model and risk assessment developed as part of the Phase 1 Desk-top Study. A report detailing the findings of the investigation shall be submitted to the Local Planning Authority together with a proposal scheme for remediation of the site where it is deemed to be necessary. No development of the site shall take place until the Local Planning Authority approves the remediation scheme in writing. Following any remediation undertaken, a validation report shall be produced and a copy provided upon completion of the remediation works to ensure all potential contamination risks have been addressed appropriately. Reason - To prevent unacceptable risks to human health, controlled waters and ... view the full minutes text for item 107.