Resolved
Resolved Conditionally approved, subject to the Head of Planning being authorised to issue the decision notice upon receipt of satisfactory surveys of protected species and specifically Great Crested Newts and reptiles and to the involvement of the local members with discharge of conditions. T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. Z001 No work shall be commenced on site until detailed plans of the reed bed, including measures for incorporating protected species, have been submitted to and approved in writing by the Local Planning Authority. These plans shall include the design and layout of the reed beds, cross sections through the site including the viewing platform, details of boundary treatments and designs for water control structures. Reason: To define the permission and ensure that the scheme is designed to maximise ecological benefits without compromising flood protection. Z002 The findings of the surveys of protected species, and in particular great crested newts and reptiles, shall be incorporated into the detailed design for the site. Reason: To maximise conservation benefits for these species and minimise impacts as a result of the scheme. Z003 No construction works shall take place on the access roads and compounds until the detailed design, including the form and finish of the access road and parking area for operatives and visitors, and their treatment/removal on completion of the reed bed construction works, together with their locations have been submitted to and agreed in writing by the Local Planning Authority. Reason: To ensure control over the development. Z004 No construction work shall commence on visitor facilities until full details of the bird hide, boardwalk and interpretation provision and signage for car parking have been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure control over the development. Z005 No development shall take place within the application area until the applicant has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation which has been submitted by the applicant and approved by the Local Planning Authority. Reason: To reduce risks of damage to historic and archaeological features. Z006 There shall be no raising of ground levels or storage of any materials including soil within that part of the site liable to flood (land below 24.114m AOD) Reason: To ensure that there will be no increased risk of flooding to other ... view the full minutes text for item 330.