Resolved
Resolved That planning permission be granted, and that the Head of Planning be authorised to issue the decision notice subject to the completion of a satisfactory Section 106 agreement to cover the required Education and Off Site Public Open Space contributions, to no objection being raised on updated flood risk information, the conditions below and any other conditions deemed appropriate by her:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. T009 The permission shall relate to the originally submitted plan and to the amended plans received on 17 July 2007. Reason: To define the permission. A003 Details of the form, colour and finish of the materials to be used externally on the walls and roofs shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Reason: To ensure that the development is visually satisfactory. Z001 Development shall not commence until drainage details, incorporating sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development, have been submitted to and approved by the Local Planning Authority, and the scheme shall subsequently be implemented in accordance with the approved details before the development is first occupied. Reason: To ensure that the development is provided with a satisfactory means of drainage as well as to reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution. Z002 No buildings shall be erected or trees planted within 5 metres of the 300mm surface water sewer and within 2.5 metres either side of the 225mm foul water sewer which cross this site. Reason: To maintain essential access for maintenance, repair, renewal and to protect the structural integrity of the public sewerage system. M010 Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason: To preserve the amenities of the locality Z003 Equipment shall be installed to suppress and disperse fumes produced by cooking. The equipment shall be effectively operated for so long as the use continues. Details of the equipment shall be submitted to and approved by the Local Planning Authority and the equipment shall be installed and in full working order to the satisfaction of the Local Planning Authority prior to the commencement of use. Reason: To preserve the amenities of the locality Z004 ... view the full minutes text for item 95.