Resolved
Resolved Conditionally approved, subject to (a) receipt of a satisfactory survey to confirm reptile presence/absence on the site, and if reptile presence is found then a condition regarding approval and implementation of reptile mitigation measures being imposed, (b) the completion of a Unilateral Undertaking to secure a financial contribution of £150 towards the Wychavon District Cycling Strategy and (c) adequate details of the proposed means of surface water drainage from the site being supplied by the applicant and the following conditions:- Z001 The dwelling hereby permitted shall not be occupied until the vehicular crossing, entrance, turning area and parking facilities have been properly consolidated, surfaced, drained and otherwise constructed in accordance with details to be submitted to and approved in writing by the Local Planning Authority and these areas shall thereafter be retained and kept available for those uses at all times. Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. Z002 Before any other works hereby approved are commenced a temporary vehicular access and entrance to serve the construction of the dwelling shall be carried out in accordance with a specification to be submitted to and approved in writing by the Local Planning Authority, at a gradient not steeper than 1 in 20. Reason: In the interests of highway safety. Z003 Before the dwelling hereby approved is first occupied the construction of the vehicular crossing to the verge and footway between the nearside edge of the adjoining carriageway and the highway boundary shall be carried out in accordance with a specification to be submitted to and approved in writing by the Local Planning Authority, at a gradient not steeper than 1 in 20. Reason: In the interests of highway safety. Z004 Any new access gates shall be set back 5 metres from the adjoining carriageway edge and shall be made to open inwards only. Reason: In the interests of highway safety. H45 Development shall not begin until parking for site operatives and visitors has been provided within the application site in accordance with details to be submitted to and approved by the Local Planning Authority and such provision shall be retained and kept available during construction of the development. Reason: To prevent indiscriminate parking in the interests of highway safety. T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. A004 Samples of the external facing bricks and roof materials shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Reason: To ensure that the ... view the full minutes text for item 92.