Resolved
Resolved Conditionally approved, subject to the applicant entering into a Unilateral Undertaking for the provision of £300 towards cycling infrastructure:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. A004 Samples of the external facing bricks and roof materials shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Reason: To ensure that the development is visually satisfactory. D003 Development shall not begin until drainage works have been carried out in accordance with details submitted to and approved in writing by the Local Planning Authority. The applicant will need to provide details on how they calculate the correct size of rainwater harvesting system based on roof area and annual rainfall with details of a soakaway system based on the rainwater tank being full, as the surplus surface water would be disposed of via the soakaway. Reason: To ensure a satisfactory means of drainage is available to serve the development. E001 No development shall take place until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected and retained. This boundary treatment shall be completed prior to the occupation of the dwellinghouse. Reason: In order to ensure that there is an acceptable form of screening with adjacent properties. LS05 All existing trees and hedges on site, or branches from trees on adjacent land that overhang the site, unless indicated on the approved plan(s) to be removed, shall be retained and shall not be felled or pruned or otherwise removed within a period of five years from the completion of the development without the previous written consent of the Local Planning Authority. Temporary fencing for the protection of all retained trees/hedges on site during development shall be erected, to a minimum height of 1.2 metres, below the outermost limit of the branch spread, or at a distance equal to half the height of the tree, whichever is the further from the tree. Such fencing shall be erected in accordance with BS 5837:2005, before any materials or machinery are brought onto site and before any demolition or development, including erection of site huts, is commenced. This protective fencing shall be maintained on site until the completion of development, ... view the full minutes text for item 211.