Resolved
Resolved Conditionally approved:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirement of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. H02 Before any other works hereby approved on the application site are commenced, the new entrance shall be set back 5 metres from the nearside of the adjoining carriageway. On each side of the set back entrance, splays shall be formed at an angle of 45 degrees with the highway boundary and the whole of the splayed areas shall be graded and cleared so that no part thereof exceeds a height of 0.6m above the relative level of the adjoining carriageway. Reason: In the interests of highway safety. Z001 The dwelling hereby permitted shall not be occupied until the vehicular crossing, turning area and parking facilities shown on the approved plan have been properly consolidated, surfaced, drained and otherwise constructed in accordance with details to be submitted to and approved in writing by the Local Planning Authority and these areas shall thereafter be retained and kept available for those uses at all times. Reason: In the interests of highway safety. Z002 Before any other works hereby approved are commenced, the construction of the vehicular access shall be carried out in accordance with a specification to be submitted to and approved in writing by the Local Planning Authority, at a gradient not steeper than 1 in 20. Reason: In the interests of highway safety. Z003 Development shall not begin until parking for site operatives and visitors has been provided in accordance with details to be submitted to and approved by the Local Planning Authority and such provision shall be retained and kept available during construction of the development. Reason: To prevent indiscriminate parking in the interest of highway safety. Z004 No building hereby permitted shall be occupied until surface water drainage works have been implemented in accordance with details that have been submitted to and approved in writing by the local planning authority. Before these details are submitted an assessment shall be carried out of the potential for disposing of surface water by means of a sustainable drainage system in accordance with the principles set out in Annex F of PPS25 (or any subsequent version), and the results of the assessment provided to the local planning authority. Where a sustainable drainage scheme is to be provided, the submitted details shall:- 1. provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters: 2. include a timetable for its implementation; and 3. provide a management and maintenance ... view the full minutes text for item 269.