Resolved
Resolved Conditionally approved:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. A004 Samples of the external facing bricks and roof materials shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Reason: To ensure that the development is visually satisfactory. A012 Construction work on the dwelling hereby approved shall not begin until a sample panel of render, showing the colour and finish of the render, has been approved by the Local Planning Authority. The panel shall be retained on site during the construction period, and the building shall be constructed of the approved materials. Reason: In order to ensure that the materials proposed are visually acceptable. M009 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995, as amended, no first floor windows shall be inserted in the side (east) elevation of the dwelling hereby approved other than that illustrated on the approved plans. Reason: In order that the Local Planning Authority can gain control over the development and preserve the amenities of the adjoining property currently known as 'Hilbre.' H25 The development hereby permitted shall not be occupied until the vehicular access and entrance, turning areas and parking facilities shown on the approved plan have been properly consolidated, surfaced, drained and otherwise constructed in accordance with details to be submitted to and approved in writing by the Local Planning Authority and these areas shall thereafter be retained and kept available for those uses at all times. Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. H05 Before any other works hereby approved are commenced a visibility splay shall be provided from a point 0.6m above ground level at the centre of the access to the application site and 2.4 metres back from the nearside edge of the adjoining carriageway, (measured perpendicularly), for a distance of 120 metres in an easterly direction along the nearside edge of the main road carriageway, B4084. Nothing shall be planted, erected and/or allowed to ... view the full minutes text for item 48.