Resolved
Resolved Conditionally approved:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. Z001 This permission shall be granted in lieu of the previous approved replacement dwelling and detached garage and tractor store (W/09/00001/PN). Reason: To avoid the erection of both the outbuildings approved within the earlier application and those included within this present application which if all constructed would cumulatively disrupt the visual qualities of the site. A004 Samples of the external wall finishes and roof materials shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Reason: To ensure that the development is visually satisfactory. M010 Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason: To preserve the amenities of the locality. U008 The garage and tractor store, as well as the first floor accommodation provided above, shall only be used for domestic storage purposes incidental to the domestic use of the dwelling and shall not be used for commercial or business purposes or converted into habitable accommodation. Reason: In order to prevent the overdevelopment of the site and to protect the amenities of the area. LS05 All existing trees and hedges on site, or branches from trees on adjacent land that overhang the site, unless indicated on the approved plans to be removed, shall be retained and shall not be felled or pruned or otherwise removed within a period of five years from the completion of the development without the previous written consent of the Local Planning Authority. Temporary fencing for the protection of all retained trees/hedges on site during development shall be erected, to a minimum height of 1.2 metres, below the outermost limit of the branch spread, or at a distance equal to half the height of the tree, whichever is the further from the tree. Such fencing should be erected in accordance with BS 5837:2005, before any materials or machinery are brought onto site and before any demolition or development, including erection of site huts, is commenced. This protective fencing shall be maintained on site until the completion of development, and nothing should be stored or placed, nor shall any ground levels be altered, within the fenced area without the previous written consent of the Local Planning Authority. There shall be no burning of any material within 10 metres of the extent of the canopy of any retained tree/hedge. If any retained tree/hedge ... view the full minutes text for item 165.