Resolved
Resolved Conditionally approved:- Z001 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. Z002 Samples of the external facing bricks and roof materials shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Reason: To ensure that the development is visually satisfactory. Z003 Prior to the occupation of the dwelling hereby approved, the existing dwelling shall be converted into garaging at ground floor level and storage space at first floor level in accordance with plans 38 Rev A and 39 Rev A. The garage and first floor storage space shown on the approved plans shall be kept available for storage use only and shall not be converted into habitable accommodation. The resulting garage building shall thereafter remain as an ancillary building to the dwellinghouse hereby permitted. Reason: In order to ensure that garage accommodation remains available for the residential use and to ensure that only one residential unit exists on this site in accordance with Local Plan Policy RES9. Z004 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995, as amended, nothing in Article 3 and Schedule 2 to that order shall operate so as to permit any development specified in Class A - C of the said schedule and no such development shall be carried out at any time without an express grant of planning permission under Part III of the Town and Country Planning Act 1990. Reason: In order that the Local Planning Authority can gain control over the development and to avoid the overdevelopment of the site. Z005 All existing trees and hedges on site, or branches from trees on adjacent land that overhang the site, unless indicated on the approved plan(s) to be removed, shall be retained and shall not be felled or pruned or otherwise removed within a period of five years from the completion of the development without the previous written consent of the Local Planning Authority. Temporary fencing for the protection of all retained trees/hedges on site during development shall be erected, to a minimum height of 1.2 metres, below the outermost limit of the branch spread, or at a distance equal to half the height of the tree, whichever is the further from the tree. Such fencing should be erected in accordance with BS 5837:2005, before any materials or machinery are brought onto ... view the full minutes text for item 259.