Resolved
Resolved Conditionally approved:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. A001 The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building. Reason: To ensure that the proposed works are executed in materials, which harmonise satisfactorily with the existing building. D017 Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted amended Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development and to reduce the consumption of water. This is in accordance with the SPD on Water Management M010 Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason: To preserve the amenities of the locality. Z001 The proposed roof light serving the en-suite within the rear facing northern elevation of the first floor extension shall be obscure glazed and non-opening unless it is positioned at a height greater than 1.7 metres above the floor of the room in which it is installed. The rooflight shall be retained as such thereafter. Reason: To ensure that the development does not create amenity issues for the existing property. Notes:- Should ground conditions prove unsuitable for the use of soakaways then the Applicant will need to submit an alternative means of disposal for surface water from the development. Where possible sustainable drainage systems should incorporated into the design and additional flow should not be discharged downstream so that flooding problems are not exacerbated or created. The Applicant should refer to the Council's recent adopted Water Management Supplementary Planning Document. This gives further details regarding the consumption of potable water and the disposal of surface water. Further information and advice on this matter can be obtained from the District Council Drainage Engineer, Wychavon District Council, The Civic Centre, Station Road, Pershore, telephone 01386 565000. In the consideration of this application, the Council has had regard to the following policies:- Wychavon District Local Plan (adopted June 2006) Policy GD2 (General Development Control – includes general criteria used for the assessment of all proposals) Policy ENV1 (Landscape Character – includes criteria relating to impact on the landscape for the assessment of all proposals) Policy ENV18 (Development in Areas of Low ... view the full minutes text for item 231.