Resolved
Resolved Conditionally approved subject to no material objections raised by reason of the daytime bat roost survey. T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. A001 The materials to be used in the construction of the external surfaces of the extensions hereby permitted shall match those used in the existing building. Reason: To ensure that the proposed works are executed in materials, which harmonise satisfactorily with the existing building. This is in accordance with Policy SUR1. D017 Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development and to reduce the consumption of water. This is in accordance with the SPD on Water Management. Z001 Prior to the commencement of the development, 2 hardwood, double-chamber or woodcrete bat boxes, exact type to be agreed, shall be installed in locations to be submitted to and approved in writing with the local planning authority. These boxes shall thereafter be retained unless otherwise agreed in writing with the local planning authority. Reason: to ensure appropriate habitat provision for protected bat species is available during destructive works and in the long term. Z002 All works shall be carried in accordance with the precautionary measures specified in section 5 of the Phase 1 Bat Survey report by [name removed] dated February 2012. This shall include careful timing of the tying of the new extension into the existing roof to avoid summer and hibernation roosting and removal of all roof tiles by hand and under the supervision and direction of a suitably qualified ecologist. Should bats, or any evidence of a hitherto undetected bat roost, be discovered during the course of these works, work in the area must cease immediately and should not resume until authorised by the ecologist. All bat species and their roosts are protected under current legislation and it is possible that a European Protected Species license would be required before works can re-commence. On completion of these works a brief confirmation letter shall be submitted to the local planning authority for approval. Reason: To ensure protected species are not harmed by the development and an offence under the Conservation of Habitats and Species Regulations 2010 is avoided. Z003 Three gaps beneath the ridge tiles shall be left within the roof of the extension to provide access to potential roosting habitat beneath the ridge tiles, but not into the roof void. These shall be in accordance with the details shown in Appendices III (Ridge Tile Access Point) and IV (Locations of Proposed Roost Site ... view the full minutes text for item 200.