Planning Application Ref W/11/02803/PN. Description: Installation of single wind turbine with maximum blade tip height 91m. Apex Motorcross, Pershore Lane, Tibberton. Distributed Generation Ltd
RefusedPlanning1 paper
Planning Committee refused this item on Thursday 21 June 2012. Below is the council's own wording, with the papers it was decided on.
Resolved Refused for the following reasons: 1 The proposed wind turbine, by virtue of its scale, height and design, would be an unduly dominant, alien feature which would appear visually prominent in the landscape. The proposal would therefore have an adverse visual impact upon the character of the surrounding landscape, particularly the open rural character of the land to the east of the application site. The erection of a structure of the scale proposed, in this location, would therefore harm the visual amenities of the locality. The proposed turbine would also add to the clutter of existing structures in the vicinity of the motorway junction, which as a result, would detract from the gateway entrance to Worcester city. The proposal is therefore contrary to advice set out in the NPPF, including paragraphs 58, 96, 98 and 109, policies CTC1, CTC2 and EN2 of the approved Worcestershire County Structure Plan (June 2001), policies ENV1 and GD2 of the adopted Wychavon District Local Plan (June 2006) and advice contained in Planning for Renewable Energy: A Companion Guide to PPS22. 2 As a result of the proximity of the application site to existing trees, hedgerows ... view the full minutes text for item 19.
Word for word from the decision Wychavon published for this meeting.Source: mgov.wychavon.gov.uk
Description: Installation of single wind turbine with maximum blade tip height 91m
Site: Apex Motorcross, Pershore Lane, Tibberton
Applicant: Distributed Generation Ltd
Agent:
Date Valid: 05/01/2012 Case Officer: Emma Worley
Expiry Date: 01/03/2012 Tel: 01386 565320
Grid Ref: E:389499.73 N:257322.21
Member(s): Cllr Mrs Margaret Rowley
1. Site Description and Details of Proposal
The application seeks permission for the construction and operation of a single wind turbine on land to the north east of junction 6 of the M5 and to the west of Tibberton. Access during construction is proposed via the existing access track at the Motorcross site to the south of the application site. There are a number of public footpaths within the vicinity of the application site.
The application has been amended and the overall height of the turbine reduced from 100 to 91 metres. The amended elevations show the wind turbine would have a maximum height of 63m from ground to the nacelle, with 3 blades each measuring up to 26m creating a swept diameter of 52m covering 2,122 square metres. The maximum height of the turbine from ground to the tip of the blade when in an upright position would measure 91m. The tower of the turbine would be constructed of tapering tubular steel with a maximum diameter of 3.8m at the base tapering to approximately 2m diameter at the top. The blades would be glass fibre reinforced epoxy. The turbine would be painted in standard non-reflective light grey paint.
An underground concrete foundation is proposed for the turbine, the precise size of which is yet to be determined, with re-levelling of the top soil as required. The turbine will then be sited on a concrete upstand which will be flush with the ground level. An electricity transformer and switch fuse is proposed to be installed alongside the base of the turbine on concrete plinths within a fenced compound. The turbine will be connected to the grid a short distance from the site via underground cables.
The tower is manufactured and brought onto the site in sections involving up to 8 deliveries and then assembled on site. Delivery, which would be carried out in accordance with relevant regulations regarding abnormal loads, will require some minor alterations to the vehicular entrance to the site of the junction 6 roundabout which would be reinstated upon completion. Existing hardstandings and tracks within the Motorcross site will be used during construction.
It is estimated that, based on a wind speed on 6.6 m/s the proposed wind turbine will have a generating capacity of up to 2,200 MWh per year, which would serve the needs of approximately 600 households and equate to an annual saving CO2 saving of 1,080 metric tonnes.
Planning permission is sought for a period of 25 years which would include the construction, operation and decommissioning of the wind turbine. It is not the role of the local planning authority to determine whether the wind characteristics of an area would support a wind turbine development. Regard must be given to the fact that the applicants would not pursue a planning application and invest a significant amount of time and money if the site was not physically suitable for the proposed development. The NPPF (para 98) emphasises that local planning authorities should not require applicants to demonstrate a need for renewable energy and should recognise that even small-scale projects provide a valuable contribution to cutting greenhouse gasses. It also advises that applications should be approved if impacts are (or can be) made acceptable.
The application includes details of a Community Co-Ownership Initiative, which suggests that the applicant would like the local community to own a shareholding of the Local Generation Company and benefit locally from a financial return of its operation. However, this aspect of the proposal is a separate issue and not a material planning consideration.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Planning Application Ref W/11/02803/PN. Description: Installation of single wind turbine with maximum blade tip height 91m. Apex Motorcross, Pershore Lane, Tibberton. Distributed Generation LtdReport
19Planning Application Ref W/11/02803/PN. Description: Installation of single wind turbine with maximum blade tip height 91m. Apex Motorcross, Pershore Lane, Tibberton. Distributed Generation LtdThis decision
Planning Application Ref W/11/02803/PN. Description: Installation of single wind turbine with maximum blade tip height 91m. Apex Motorcross, Pershore Lane, Tibberton. Distributed Generation LtdThis decision
Planning Application Ref W/26/01261/FUL.Resolved To delegate authority to the Director of Planning and Infrastructure to grant planning permission subject to...
Planning Application Ref W/26/01241/LB.Resolved To delegate authority to the Director of Planning and Infrastructure to grant planning permission subject to...
Planning Application Ref W/26/00695/RM.Resolved To delegate authority to the Director of Planning and Infrastructure to refuse the application in accordance...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.