Item65
Resolved
Resolved Delegated approval subject to: (a) the applicant successfully entering into a legal agreement for the provision of contributions relating to affordable housing; public open space; cycling; recycling; formal leisure; formal sport; art; community buildings; education and highway infrastructure. (b) and the following conditions: 1. The development hereby permitted shall be begun before the expiration of two years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Samples of the external facing bricks (as well as render details) and roof materials shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Development shall be carried out in accordance with the approved details. Reason: To ensure that the development is visually satisfactory. This is in accordance with Adopted Local Plan Policy SUR1 and guidance contained in the Residential Design Guide SPD. 3. The floorslab levels of each new dwelling shall be constructed in accordance with drawing no. 101B. Reason: To ensure that the development is visually satisfactory. This is in accordance with the Adopted Local Plan Policy SUR1 and guidance contained in the Residential Design Guide SPD. 4. Notwithstanding the details provided on drawing no. VW-100-Planning Revision E no development shall take place until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. Development shall be carried out in accordance with the approved details. Reason: In order to ensure that there is an acceptable form of screening with adjacent properties. This is in accordance with adopted Local Plan Policy GD2. 5. All existing trees and hedges on site, or branches from trees on adjacent land that overhang the site, unless indicated on the approved plan(s) to be removed, shall be retained and shall not be felled or pruned or otherwise removed within a period of five years from the completion of the development without the previous written consent of the Local Planning Authority. Temporary fencing for the protection of all retained trees/hedges on site during development shall be erected, to a minimum height of 1.2 metres, below the outermost limit of the branch spread, or at a distance equal to half the height of the tree, whichever is the further from the tree. Such fencing should be erected in accordance with BS 5837:2005, before any materials or machinery are brought onto site and before any demolition or development, including erection of site huts, is commenced. This protective ... view the full minutes text for item 65.
Word for word from the decision Wychavon published for this meeting.
Source: mgov.wychavon.gov.uk