Item144
Resolved
Resolved That this application be approved subject to the following conditions:- 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – 1847.01 Location plan 1847.05A Proposed Elevations 1847.04A Proposed Floor Plans 1847.06A Existing and Proposed Block Plans Reason: To define the permission. 3. The materials to be used in the construction of the external surfaces of the single storey side extension hereby permitted shall match in type, colour, texture, size, coursing, jointing and pointing to those used in the existing building. Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 6, SWDP21 and SWDP24 of the South Worcestershire Development Plan. INFORMATIVE NOTES 1. Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary 2. Access to the site is via a public right of way and the applicant’s attention is drawn to the restrictions imposed by Section 34 of the Road Traffic Act, 1988, regarding the driving of motor vehicles over public footpaths/bridleways 3. The applicant must be aware of their obligations towards the public right of way as follows: No disturbance of, or change to, the surface of the path or part thereof should be carried out without written consent (this includes laying concrete, tarmac or similar) No diminution in the width of the right of way available for use by the public. Building materials must not be stored on the right of way. Vehicle movements and parking to be arranged so as not to unreasonably interfere with the public's use of the right of way. No additional barriers are placed across the right of way. No stile, gate, fence or other structure should be created on, or ... view the full minutes text for item 144.
Word for word from the decision Wychavon published for this meeting.
Source: mgov.wychavon.gov.uk