Resolved
Resolved To delegate authority to the Director of Planning and Infrastructure to grant planning permission subject to the following planning conditions, allowing for any subsequent amendments to the planning conditions as required by the Director of Planning and Infrastructure. 1. Unless where required or allowed by other conditions attached to this permission, the development hereby approved shall be carried out in accordance with the following plans/drawings/documents: Plans approved in relation to planning consent 20/02071/FUL: • Figure 1 0.B Site Location Plan • Figure 3 Solar Panel Elevations 2258.M4. 018.3.G • Figure 4 Transformer 2258.M4.014.1.A • Figure 5 Substation 2258.E0.055.1.D (3 sheets) • Figure 6 Spare Parts Container 2258.M4.021.3.A • Figure 7 Battery Storage Container 2258.M4.023.1.A • Figure 8 Cable Trench Cross Section 2258.E4.017.3A • Figure 9 Fence and Gate 2258.M4.016.3C • Figure 10 Track Cross-Section 2258.M4.31.3.C • Figure 11 Site Entrance and Visibility Splays 2258.M4.38.2.D (2 sheets) • Figure 12 Hedge and Gate 2258.M4.037.3.A Plans approved in relation to planning consent 22/01892/FUL: • Advance Works - Bishampton Solar Farm: plan dated August 2022 (revision D); • Advance Works - Temporary Entrance Arrangements - Bishampton Solar Farm: plan dated August 2022; and • Bishampton 66kV/33kV Solar Farm Connection (Layout Plan): dated 25th May 2022, drawing number EPC-0226-C-DRN-01 (Rev 0) • Bishampton 66kV/33kV Solar Farm Connection (Elevations): dated 2nd March 2022, drawing number EPC-0226-C-E-LA-ELV (Rev 00) Plans approved in relation to planning consent W/25/00944/FUL: • Figure 2 Site Layout Plans - May 2025 - Rev 1 - Submission Version - (5 Sheets) • Figure 13 Cross Section Drawings ... view the full minutes text for item 59.