Resolved
That the advice of the Advisory Panel be accepted and the suggested decision, above, be endorsed. REASON:To give flood protection to the Clementhorpe area of York, within the funding arrangements currently available to the Council .
Neighbourhood Services and Advisory Panel decided this item on Thursday 8 June 2006. Below is the council's own wording, with the papers it was decided on.
Resolved
That the advice of the Advisory Panel be accepted and the suggested decision, above, be endorsed. REASON:To give flood protection to the Clementhorpe area of York, within the funding arrangements currently available to the Council .
Meeting of the Executive Member for Neighbourhood Services and Advisory Panel 8 June 2006
Report of the Director of City Strategy
CLEMENTHORPE FLOOD BARRIER – AQUABARRIER PILOT SCHEME Summary 1. This report is to advise Members of the proposed offer by AquaBarrier- Systems Ltd, to provide a demountable flood defence system at Clementhorpe, at minimal cost to the Council, and seeks Members approval to accept the offer.
Background 2. The 2000 floods cost City of York Council £1.32m. Individual costs to householders ran into many thousands of pounds, with an estimated damage figure of around £30,000 - £40,000 per house (based on Government figures).
3. Records show that forty properties in the River Street / Clementhorpe area suffered internal property flooding during the 2000 flood, and access was cut off to at least another fifty, as shown on Annex 1. Lower-level floods also restrict access to many properties.
4. The highway surface in Clementhorpe begins to flood at 8.50m Above Ordnance Datum (AOD), which is 3.5m above normal River Ouse summer level, and property flooding starts at 10.03m AOD. The 2000 flood reached a level of 10.30m AOD at this location. The effects of the flood were worsened by a back-flow of foul sewage from the drains, due to the failure of Yorkshire Water Services’ (YWS) Fulford Pumping Station.
5. In subsequent flood events, the Council has built a temporary sandbag bund across Clementhorpe near its junction with Terry Avenue, to allow access to residents during floods. However, this bund is not high enough to prevent internal property flooding.
6. To tackle this flooding problem, a “free trial” of a removable flood barrier has been offered to the Council by AquaBarrier-Systems Ltd. This prototype barrier has been tested in a dry dock and in a Hydraulics Research establishment, but AquaBarrier are now keen to test their product in a real situation. The system, as shown on Annex 2, has the following features: - • A raised table across the end of Clementhorpe (similar to a speed table, but with gentler ramps), onto which temporary interlocking barriers will be fixed in times of flood. The barrier has built-in rubber seals to prevent leakage around the structure. • Stand-by temporary pumping to deal with ground water, which builds up behind the barrier.
7. Following the Executive meeting of 9th November 2004, Members resolved to enter into negotiations with AquaBarrier-Systems Ltd, to take up their offer of a pilot for their demountable flood defence system at Clementhorpe.
8. The Environment Agency is interested in testing this product and is therefore offering grant-aid to AquaBarrier to undertake the trial.
Consultation 9. The proposed scheme has been consulted upon, both internally with council officers and Members, and externally with over 250 local residents and businesses. The scheme was also presented to the public during the Micklegate Ward Committee meeting held on the 8 May 2006. The results of the consultation process are produced below: -
Internal Consultation:
The Council’s Engineering Consultancy carried out a Stage 2 Safety Audit. A number of recommendations were made to modify the proposed road signs for the scheme, which have now been accommodated into the works. The proposal to carry out the construction under a temporary road closure was objected to by Network Management. The contractor has subsequently confirmed that the scheme can be constructed with temporary traffic lights to keep the road open. Local ward councilors are supportive of the scheme
External Consultation:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Clementhorpe Flood Barrier: Aquabarrier Pilot SchemeReport | 2.2 MB | DownloadRead as text |
Follow Neighbourhood Services and Advisory Panel at York and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 18 Mar 2009 | Exclusion of Press and PublicThat the press and public be excluded from the meeting during consideration of annexes 2 and 3 to agenda item 11 (200... | Decided | Open |
| 18 Mar 2009 | Neighbourhood and Community Safety Group Legal ActionsAdvice of the Advisory Panel That the Executive Member be advised to note the contents of the report. Decision of the... | Noted | Open |
| 18 Mar 2009 | Petition requesting the City of York Council repair and maintain the streets in Acomb and Holgate in a safe conditionAdvice of the Advisory Panel (i) That the Executive Member be advised to approve option 2 – to note and agree that of... | Approved | Open |
| 18 Mar 2009 | Petition from Strensall and Towthorpe Parish Council requesting the re-surfacing of four roads, drainage and roadmarking workAdvice of the Advisory Panel (i) That the Executive Member be advised to approve option 2 - to note and agree that of... | Approved | Open |
| 18 Mar 2009 | Annual Highway Maintenance ReportAdvice of the Advisory Panel That the Executive Member be advised to: (i) note the performance and success in 2008/09... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.