Resolved
That the application be withdrawn as requested. REASON: To allow the applicants to confirm the ownership of the land prior to the Sub-Committees consideration of the application.
East Area Planning Sub-Committee decided this item on Thursday 12 October 2006. Below is the council's own wording, with the papers it was decided on.
Resolved
That the application be withdrawn as requested. REASON: To allow the applicants to confirm the ownership of the land prior to the Sub-Committees consideration of the application.
COMMITTEE REPORT
Committee: East Area Ward: Clifton Date: 12 October 2006 Parish: Clifton Planning Panel
Reference: 06/01588/FULM Application at: Executive Communication Services Ltd, 8 St Peters Grove, York YO30 6AQ For: Conversion of existing building and erection of 3 storey block to provide a total of 12 x 2 bed apartments with associated on-site parking and secure cycle storage. By: Hearthstead Homes Ltd Application Type: Major Full Application (13 weeks) Target Date: 13 October 2006
1.0PROPOSAL
1.1This is a full planning application for the conversion of 8 and 9 St. Peters Grove to eight flats and the erection of a new block of 4 flats.
1.2The site extends to 0.15 Hectares and the existing building is currently in use as a conference facility. It is proposed that the existing building is extended at the rear with a two storey flat roofed new element filling the space between the existing rear wings and extending to the rear. Dormer window additions to allow provision of accommodation within the roof space are proposed at the front and at the rear.
1.3A new build block of 4 flats arranged over four floors is proposed, sited adjacent the southern boundary with a vehicular access to parking at the rear separating the new and the existing buildings.
1.4Twelve parking spaces, divided between the forecourt and the rear of the site, are proposed and two cycle stores accommodating 12 cycles are also shown on plan.
1.5The site lies within Clifton Conservation Area. The existing building (8 and 9 St. Peters Grove) is not listed.
1.6A separate application for consent to demolish an existing outbuilding has been submitted as application ref. 06/01649/CAC.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
Conservation Area Clifton 0013
Application Reference Number: 06/01588/FULM Item No: 5a Page 1 of 9 2.2 Policies:
H4 - Housing development in existing settlements
GP1 - Design
SP8 - Reducing dependence on the car
HE2 - Development in historic locations
HE3 - Conservation Areas
HE11 - Trees and landscape
H7 - Residential extensions
T4 - Cycle parking standards
GP4 - Environmental sustainability
GP10 – Subdivision of gardens
3.0CONSULTATIONS
INTERNAL
3.1HIGHWAYS NETWORK MANAGEMENT: Access to the site is via two existing dropped accesses. It is not considered by officers that the proposal will lead to a material increase in traffic generated by the site. Car parking for 12 vehicles has been provided, this is in accordance with CYC maximum standards which would allow a theoretical maximum provision of 15. The surrounding streets are protected by traffic regulation orders including residents parking for which the site is currently to apply for a limited number of permits. The proposal has the potential to increase the number of permits that could be applied for by future occupiers. Officers are therefore also seeking members approval to have the property removed from the R34 scheme. The site is located close to the city centre and a wide range of local facilities to reduce the dependence on the private car.
3.2LEARNING CULTURE AND CHILDRENS SERVICES: A contribution of £31,062 is sought in respect of two pupil spaces required at Canon Lee School.
3.3ENVIRONMENTAL PROTECTION UNIT: The results of the Phase 2 survey indicates there may be elevated levels of certain contaminants in the soil although a search of previous uses of the site does not indicate likely contamination of the site. In order to ensure that future occupants of the premises are not exposed to potential contaminants, I would request that the following two conditions are placed on the permission should it be granted:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
8 St Peters Grove, York (06/01588/FULM)Report | 46 KB | DownloadRead as text |
PDF |
Item1Report | 49 KB | Download |
Follow East Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 May 2013 | MinutesThat the minutes of the East Area Planning Sub-Committee held on 11 April 2013 be approved and signed by the Chair as... | Approved | Open |
| 2 May 2013 | 96 Dodsworth Avenue, York. YO31 8UD (13/00001/FUL)That the application be deferred and brought back to Committee once the additional noise levels had been received. RE... | Deferred | Open |
| 2 May 2013 | Biology Department, Wentworth Way, Heslington, York. YO10 5DD (13/00571/FULM)That the application be approved with the following additional conditions; 1. All demolition and construction works a... | Approved | Open |
| 2 May 2013 | 18 Alma Grove, York YO10 4DH (13/00657/FUL)That the application be approved. REASON: In the opinion of the Local Planning Authority the proposal, subject to the... | Approved | Open |
| 11 Apr 2013 | Exclusion of Press and PublicThat the Members of the Press and Public be excluded from the meeting during the consideration of Annexes to agenda i... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.