The Orchard, Tyn Garth, Acaster Malbis, York YO23 2LX (08/01177/FUL)
ApprovedPlanning2 papers
West & City Centre Area Planning Sub-Committee approved this item on Thursday 13 November 2008. Below is the council's own wording, with the papers it was decided on.
That the application be approved subject to the conditions listed in the report and the amended condition listed below. Amended Condition 2 Notwithstanding the application details hereby approved, a hedge utilizing species previously agreed in writing by the Local Planning Authority shall be planted directly parallel to the fence stipulated in Condition 1 to further separate the renovated moorings from adjoining land. The hedge shall be allowed to grow to a minimum height of 1metres and shall be planted within the first planting season following the date of this permission. Any part of the hedge so planted which dies, or is removed ... view the full minutes text for item 40g
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Committee: West/Centre Area Ward: Bishopthorpe Date: 13 November 2008 Parish: Acaster Malbis Parish Council
Reference: 08/01177/FUL Application at: The Orchard Tyn Garth Acaster Malbis York YO23 2LX For: Replacement of 3no. moorings By: [name removed] Type: Full Application Target Date: 15 September 2008
1.0PROPOSAL
1.1The Orchard,Tyn Garth comprises a substantial detached dwelling currently in the process of erection adjacent to the bank of the River Ouse at Acaster Malbis.Associated with the site are the rights to three moorings along the river bank.The moorings have been re-constructed with fresh concrete foundations, new steel and timber decking and a 2 metre bow topped close boarded timber fence at either side of the river side public footpath.It is this development which is the subject of the current retrospective planning application.
1.2The application was deferred from the 15th September West/Centre Development Control Sub-Committee to seek legal clarification of the possibility of withdrawing the applicant's Permitted Development Rights for the erection of fencing notwithstanding the fact that the development has already been undertaken.The legal advice has been given that it would be feasible to withdraw the applicant's Permitted Development Rights in respect of the erection of fencing however to do so would create a liability for the Authority to pay compensation to the applicant for the loss of those rights that have already been exercised. Furthermore DoE Circular 9/95 sets a firm test of exceptional circumstances and the presence of a real and specific threat to amenity for these powers to be exercised in these circumstances.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
City Boundary York City Boundary 0001
DC Area Teams West Area 0004
DC Area Teams East Area (1) 0003
Application Reference Number: 08/01177/FUL Item No: Page 1 of 6 Floodzone 2 Flood Zone 2 CONF
Floodzone 3 Flood Zone 3
2.2Policies:
CYGP1 Design
CYGB2 Development in settlements "Washed Over" by the Green Belt
CYNE2 Rivers and Stream Corridors, Ponds and Wetland Habitats
CYGP15 Protection from flooding
3.0CONSULTATIONS
INTERNAL:--
3.1Highway Network Managemwent raise no objection to the proposal.
3.2Design,Conservation and Sustainable Development were consulted with regard to the proposal and no response has been received.
3.3Public Rights of Way were consulted with regard to the proposal and no response has been received
EXTERNAL:-
3.4Natural England raise no objection to the proposal.
3.5Acaster Malbis Parish Council raise no objection to the replacement of the moorings but object to the associated fencing erected to either side of the river bank footpath.
3.6The Rambler's Association raise no objection to the replacement of the moorings but object to the associated fencing erected to either side of the river bank footpath.
3.7The Environment Agency object to the design of fencing erected directly adjacent to the river bank.They feel that the close boarded design adopted would impede the
Application Reference Number: 08/01177/FUL Item No: Page 2 of 6 free flow of flood water causing an increased risk of flooding elsewhere in the vicinity.A post and rail fence would however be deemed to be acceptable.
3.8British Waterways were consulted in respect of the proposal and no response has been received.
3.9Acaster Internal Drainage Board were consulted in respect of the proposal and no response has been received.
3.10Some 22 letters of objection have been received in respect of the proposal.These raise no objection in respect of the re-instatement of the moorings, but object to the associated fencing on the grounds that it destroys the open character of the riverbank, would set a precedent for other similar developments elsewhere, would increase the risk of flooding elsewhere, creats an undesirable urbanising element within the local townscape and creat a fear of crime for those using the riverbank right of way.
4.0APPRAISAL
KEY ISSUES:-
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.