CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
City of York Council
East Area Planning Sub-Committee, Wednesday 17 December 2008 at 2.00pm

Hall Farm, Church Lane, Huntington, York, YO32 9RE. (08/02493/FUL)

Refused Planning 2 papers

East Area Planning Sub-Committee refused this item on Wednesday 17 December 2008. Below is the council's own wording, with the papers it was decided on.

Item58b

Resolved

That the application be refused. 1 REASON: The site is within an area of Green Belt. It is considered that the location, design and height of the proposed mast, together with the visual impact of the access road and associated equipment, would be harmful to the character, appearance and visual amenity of the area. It is considered that the proposed development would introduce a visually intrusive form of development into a landscape which is attractive, open and undeveloped and is enjoyed by both local residents and visitors to the area. As such the proposed development is considered contrary to Policies GB1 and GP20 of the City of York Draft Local Plan, and Central Government advice contained within Planning Policy Guidance 2: “Green Belts” and Planning Policy Guidance 8: “Telecommunications”.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to East Area Planning Sub-Committee

COMMITTEE REPORT

Committee: East Area Ward: Huntington/New Earswick Date: 17 December 2008 Parish: New Earswick Parish Council

Reference: 08/02493/FUL Application at: Hall Farm Church Lane Huntington York YO32 9RE For: Installation of 21m high lattice type telecommunications mast with associated equipment By: Vodafone Ltd Application Type: Full Application Target Date: 26 December 2008

1.0PROPOSAL

1.1This application seeks planning permission for the erection of a telecommunications mast and associated equipment at Hall Farm, Huntington. The mast would be located approximately 175m south of Church Lane and 270m west of Paddock Court in Huntington. The land is within the Green Belt but is outside Huntington Conservation Area.

1.2The proposed mast is of a lattice design and measures 21m in height. Three antennas would be positioned on top of the mast bringing the total height to 23.4m. Three transmission dishes would sit towards the top of the mast. Associated works include the creation of hardstanding for a maintenance vehicle car parking space, the creation of a 3m wide access track connecting the site to Church Lane, and three equipment cabinets which are no more than 2m in height.

1.3The application is accompanied by a supporting statement, which includes details of the operational context, details of the siting and design, alternative discounted sites, a planning policy analysis, and confirmation that the developer will meet the International Commission on Non-Ionising Radiation Protection (ICNIRP) safety guidelines. The proposed mast is intended to provide 3G coverage to the local area as well as increasing the capacity for 2G coverage. It is contended by the applicant that there are limited locations to locate a mast to serve the local area. Sixteen alternative sites have been considered but discounted as being less acceptable than the proposed location due to factors such as proximity to listed buildings, the impact upon Huntington Conservation Area, or being operationally "sub-optimum" as they are towards the edge of the cell area. It is contended that the application site is the most suitable in terms of operational requirements, its separation from residential dwellings and Huntington Conservation Area, and its proximity to mature vegetation which limits potential views of the proposed structure.

2.0POLICY CONTEXT

2.1Development Plan Allocation:

Application Reference Number: 08/02493/FUL Item No: 3b Page 1 of 6 City Boundary : York City Boundary 0001

DC Area Teams : East Area (2) 0005

2.2Policies:

CYGP20 Telecommunication developments

CYGB1 Development within the Green Belt

3.0CONSULTATIONS

INTERNAL

3.1Highway Network Management - Concerns raised over the potential vehicular damage to the Public Right of Way during its construction and maintenance. The distance from the access to the site is approximately 1km. They recommend the mast is relocated or alternative access routes are considered.

3.2Environmental Protection Unit - No objections.

EXTERNAL

3.3Huntington Parish Council - No comments received at the time of writing the report. Verbal update to be given at committee.

3.4New Earswick Parish Council

Object. The proposed mast would violate a Green Belt area. The height and design of the mast would create a hideous blot on the rural, scenic environment enjoyed by many residents. The well known and enjoyed view of All Saints Church would be completely ruined for New Earswick residents and the many walkers enjoying one of the most attractive riverside public footpaths around the city of York.

3.5Local Residents and General Public

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Hall Farm, Church Lane, Huntington, York, YO32 9RE. (08/02493/FUL)Report 37 KB DownloadRead as text
PDF
Hall farm2Report 226 KB Download

At this meeting

Whole meeting

Who was there

9 of 10 attended
KH
Councillor Keith HymanChair, present
RC
Councillor Richard CreganVice-Chair, apologies
HD
Councillor Helen DouglasCommittee Member, present
PF
Councillor Paul FirthCommittee Member, present
CF
Councillor Christina FunnellCommittee Member, present
KK
Councillor Ken KingCommittee Member, present
RM
Councillor Richard MooreCommittee Member, present
KO
Councillor Keith OrrellCommittee Member, present
DT
Councillor Dave TaylorCommittee Member, present
SW
Councillor Sian WisemanCommittee Member, present

On this subject at York

Search all
  1. Hall Farm, Church Lane, Huntington, York, YO32 9RE. (08/02493/FUL)This decision
  2. Hall Farm, Strensall Road [18/01979/FUL]Approved
  3. Hall Farm, Strensall Road, York, YO32 9SW (16/02886/FUL)Refused
  4. Hall Farm, Strensall Road, York, YO32 9SW (16/02886/FUL)Deferred
  5. Hall Farm, Strensall Road, York, YO32 9SW (16/02886/FUL)Deferred
  6. Public Rights of Way - Application for Definitive Map Modification Order, Alleged Public Footpath, from Main Street to Sparrow Halll Farm, WheldrakeAgreed

More from York East Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
2 May 2013 MinutesThat the minutes of the East Area Planning Sub-Committee held on 11 April 2013 be approved and signed by the Chair as... Approved Open
2 May 2013 96 Dodsworth Avenue, York. YO31 8UD (13/00001/FUL)That the application be deferred and brought back to Committee once the additional noise levels had been received. RE... Deferred Open
2 May 2013 Biology Department, Wentworth Way, Heslington, York. YO10 5DD (13/00571/FULM)That the application be approved with the following additional conditions; 1. All demolition and construction works a... Approved Open
2 May 2013 18 Alma Grove, York YO10 4DH (13/00657/FUL)That the application be approved. REASON: In the opinion of the Local Planning Authority the proposal, subject to the... Approved Open
11 Apr 2013 Exclusion of Press and PublicThat the Members of the Press and Public be excluded from the meeting during the consideration of Annexes to agenda i... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies