Peckitt Street and Friar's Terrace Flood Protection Scheme
AgreedExecutive2 papers
Decision Session - Executive Member for City Strategy agreed this item on Tuesday 7 July 2009. Below is the council's own wording, with the papers it was decided on.
That the Executive Member agrees the principle of implementing the Peckitt Street and Friar’s Terrace flood protection scheme. REASON: To provide the most reliable protection against flooding and significantly reduce the resources required. That the Executive Member agrees the principle of implementing the Peckitt Street and Friar’s Terrace flood protection scheme 1 . REASON: To provide the most reliable protection against flooding and significantly reduce the resources required.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for City Strategy
Decision Session - Executive Member for City 7 July 2009 Strategy
Report of the Director of City Strategy
Peckitt Street and Friar’s Terrace Flood Protection Scheme
Summary 1. This report provides details of a proposed flood protection scheme to reduce flood risk from the River Ouse to four properties in York and maintain access during floods to thirteen more, and to the rear access to the fire station.
Recommendation 2. The Executive Member is recommended to agree the principle of implementing the Peckitt Street and Friar’s Terrace flood protection scheme.
Background 3. During a River Ouse flood event the Council installs temporary sandbagging and pumping to protect 8 Peckitt Street and 1 – 3 Friars Terrace (plan in Annex 1). Sandbags are also used at Tower Place to provide some protection to 1 – 9 Tower Place. It is not possible for the residents to protect their properties individually.
4. This procedure, developed since the 2000 flood, has proved to be effective on three occasions against events up to 4.42m (14’6”) above summer level (ASL). It has also been partially installed on some ten other occasions when forecasts predicted a higher peak than was actually reached.
5. The Council and residents acknowledge that the procedure will not be effective above that level, but because of its success residents expect that it will be carried out whenever there is a risk of the properties flooding.
6. There are resourcing and health and safety implications for the Council. It is expensive and the cost of the response to the flood in September 2008 was £31,844 of which approximately £25,000 could be attributed to the works at Peckitt Street and Tower Place. 7. Although the temporary installation uses sandbags, it is also dependent on the stability and integrity of the existing walls. These are in varying states of repair and the quality of the sandbagging can vary depending on the time available for erection. These factors decrease the certainty of being able to provide protection to the properties.
Proposal 8. A scheme has been designed which is more effective and reliable and less resource dependant. The height of the parapet wall in front of the four affected properties will be raised and a new wall constructed across the end of Peckitt Street. The existing railings will be remounted at the higher level.
9. Two pedestrian openings in the raised wall at the top of the steps from the riverside walk up to Peckitt Street will be closed at times of flooding with removable handstops. A third opening, with steps up to No. 3 Friar’s Terrace from the riverside will be walled up and backfilled. Minor works will be carried out on the frontage of Tower Place.
10. Discussions with Yorkshire Water Services will establish whether it will be possible to install valves to control backflow through the local sewerage system. This is not essential to the scheme but will enhance its reliability. It will still be necessary to provide temporary pumping during flood events.
11. This scheme has the same limitations as the temporary procedure and will only protect the properties against events up to a maximum level of 4.70m (15’5”) ASL. This occurred twice in 2008 and the 2000 flood peaked at 5.4m (17’7”) ASL.
Operation
12. Currently sandbagging operations commence on receipt of a warning of forecast river level in excess of 2.5m ASL.
13. In future, on receipt of a warning of forecast river level in excess of 3.9m ASL, resources will be mobilised to:
• Install the two handstops at the top of the Peckitt Street steps. • Provide pumps to handle seepage and supervise during operation. • Provide pumps and sandbags to Tower Place.
This will significantly reduce revenue costs.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for City Strategy at York and we tell you when its next papers are published, before the meeting rather than after it.
Low Poppleton Lane Road Closure PetitionThat the Executive Member for City Strategy confirms the current provision for the No. 10 bus service on Low Poppleto...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.