Harewood Whin Tinker Lane Rufforth York YO23 3RR (09/01589/FUL)
ApprovedPlanning3 papers
West & City Centre Area Planning Sub-Committee approved this item on Thursday 19 November 2009. Below is the council's own wording, with the papers it was decided on.
That the application be approved subject to the imposition of the conditions listed in the report and to the Assistant Director (Planning and Sustainable Development), in consultation with the Chair and Vice Chair, being delegated authority to agree and incorporate the commissioning date of the development in the decision notice. 1. REASON: In the opinion of the Local Planning Authority the proposal, subject to the conditions ... view the full minutes text for item 34c
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Committee: West/Centre Area Ward: Rural West York Date: 19 November 2009 Parish: Parish Of Rufforth With Knapton
Reference: 09/01589/FUL Application at: Harewood Whin Tinker Lane Rufforth York YO23 3RR For: Variation of conditions 9 and 10 of planning application 08/002426/FULM to allow the delivery of fuel to the Bioflame plant and to extend period of operation By: Yorwaste Ltd ([name removed]) Application Type: Full Application Target Date: 5 November 2009
1.0PROPOSAL
1.1Harewood Whin comprises a substantial waste disposal by landfill operation working via a series of planning permissions dating back to the early 1980s It lies within the designated York Green Belt to the west of the City Centre.
1.2Planning permission was granted for erection of a small scale biomass power plant housed within a steel clad warehouse on 25th February 2009.Permission was given subject to conditions(9 and10) restricting the plant to being solely ancillary to the waste disposal activities currently taking place at the site with no dedicated deliveries of fuel and requiring the cessation of activity at the plant and its removal within six months of the cessation of operations. The current application seeks planning permission for the overall scheme, subject to conditions 9 and 10 being modified to allow for operation of the plant to continue for a minimum of ten years from commissioning notwithstanding the status of waste disposal activities at the site at the time, together with the delivery of fuel to the site from outside sources in the event of waste disposal activities otherwise ceasing at the site. There has been no change in planning circumstances appertaining to the site since the initial determination. This report considers the material considerations specifically relating to Conditions 9 and 10 and a copy of the original report in relation to the scheme is appended herewith as an appendix.
1.3The power plant would be constructed within a steel clad warehouse 30 metres wide, 84 metres long, and 12.3 metres high. Associated with it would be a stack 16.2 metres high together with cooling plant at ground level 8.4 metres long by 3.1 metres high. The proposed power plant would use low-grade waste wood currently sent to landfill as a fuel, with the electricity generated transmitted to the National Grid by underground cable. It is anticipated that approximately 30,000 tonnes of low-grade waste wood would be used to generate 2.5 MW/he of electricity for export to the National Grid per annum.
1.4The application site lies directly to the north of the materials recycling building within the "restored area" towards the western edge of the overall site. The proposal has previously been subject to a formal Screening Request made under the 1999 Town and Country Planning (Environmental Impact Assessment) Regulations. A decision was previously reached that a formal Environmental Impact Assessment was
Application Reference Number: 09/01589/FUL Item No: 4c Page 1 of 8 not required. In the absence of any material change in circumstances it is felt that a formal Environmental Impact Assessment in relation to the proposal should not now be required. The proposal is subject to regulation in terms of its Environmental Impacts via the Environmental Permit system deriving from the EU Directive on Integrated Pollution, Prevention and Control issued by the Environment Agency.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
Air safeguarding Air Field safeguarding 0175
City Boundary York City Boundary 0001
DC Area Teams West Area 0004
2.2Policies:
CYMW5 Landfill/land raising - considered on merits
CYGB1 Development within the Green Belt
CYGB11 Employment devt outside settlement limits
CYGP4A Sustainability
CYGP4B Air Quality
CYGP5 Renewable energy
3.0CONSULTATIONS
INTERNAL:-
3.1Highway Network Management raise no objection to the proposal;
3.2Design, Conservation and Sustainable Development raise no objection to the proposal;
3.3City Development raise no objection to the proposal;
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.