Knavesmire Primary School, Trafalgar Street, York, YO23 1HY (12/00399/GRG3)
ApprovedPlanning2 papers
West & City Centre Area Planning Sub-Committee approved this item on Thursday 19 April 2012. Below is the council's own wording, with the papers it was decided on.
That the application be approved subject to the conditions listed in the report. RESAON: T he proposal, subject to the conditions listed in the report, would not cause undue harm to interests of acknowledged importance, with particular reference to visual impact, residential amenity, highway safety, biodiversity and heritage assets. As such the proposal complies with Policies ED1, GP1, HE10, NE1, NE6, NE7 of the City of York Development Control Local Plan.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Date: 19 April 2012 Ward: Micklegate Team: Major and Parish: Micklegate Planning Commercial Team Panel
Reference: 12/00399/GRG3 Application at: Knavesmire Primary School Trafalgar Street York YO23 1HY For: Erection of school hall, first floor and two storey extension to south wing to create extra classrooms, and single storey reception, cloakroom and toilet extensions. By: [name removed] Type: General Regulations (Reg3) Target Date: 2 April 2012 Recommendation: Approve
1.0PROPOSAL
1.1The application relates to the Knavesmire Primary School in South Bank which is situated within a residential area. The school buildings are arranged in a T-shape apart from a single storey wing in the northwest corner of the site which contains the dining facilities. The primary school also has a nursery, which along with its associated playground is on the east side of the site and a Children's Centre, which occupies extensions recently added to the north of the main school building and to the northwest wing.
1.2The school intends to increase the number of pupils from 260-420 over the next 3 years. To accommodate the extra capacity it is proposed to reconfigure the internal layout and planning permission is sought for the following extensions :-
• Single storey flat roof extension to provide w/c and cloakrooms at the end of the west wing (by Lorne Street entrance). • New main hall to the east side of the south wing (between the school and the cottage which faces Campleshon Road). • An extension at the end of the south wing, to provide 2 further classrooms at ground floor level and 2 within the roof void. • Single storey extension to main entrance and new heads office. • The temporary classrooms currently on site would be relocated to the main school playground and removed when the works are completed.
1.3The application is brought to committee due to the scale of the proposed works and as the application is made by Council's Property Services section.
2.1Policies: • CYED1 Primary and Secondary Education • CYGP1 Design • CYHE10 Archaeology • CYNE1 Trees, woodlands, hedgerows • CYNE6 Species protected by law • CYNE7 Habitat protection and creation
3.0CONSULTATIONS
Design, Conservation and Sustainable Development
Countryside Officers
3.1No objection to the scheme. Recommend conditions to mitigate for the loss of trees and to secure bat roosting opportunities within the buildings on site.
3.2A bat survey was carried out in September (2011), it involved a scoping survey and an evening emergence survey. No evidence of roosting bats were found, and no bats were seen to emerge from any part of the school during the evening activity survey. There was however a fairly large amount of commuting and foraging activity within the site, particularly along the tree lined southern boundary along Campleshon Road, and to the east of the building (where the new hall is to be located). All recordings were of Common Pipistrelles, and the first bat was observed fairly early on in the evening which would suggest that there is a roost close by.
3.3Particular care will need to be taken during building works (protective measures and sensitive working practices, such as the careful removal of any slates or ridge tiles by hand), to ensure that bats have been fully taken into consideration during all stages of the work, and that any potential impacts are minimised should any bats take up residence in the future (i.e. before construction works begin).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.