Resolved
That the application be approved subject to the imposition of conditions detailed in the committee report and the following amended conditions: Condition 7 - Prior to commencement of each building hereby approved an archaeological evaluation in accordance with a detailed methodology (to include geophysical survey, metal detecting, trial trenches, community involvement, analysis, publication and archive deposition) of the site shall be submitted to and approved in writing by the Local Planning Authority. A report of the results of the evaluation following the aforementioned agreed methodology shall be submitted to and agreed in writing by the Local Planning Authority. The report shall be submitted to the Local Planning Authority within six weeks of the completion of the field investigation. Condition 8 - Following the carrying out of the archaeological evaluation on each part of the site required by Condition 7, if the Local Planning Authority so requires, an archaeological excavation of that part of the site shall be carried out before any development is commenced. The excavation shall be carried out in accordance with a detailed methodology (to include trenches, community involvement, post-excavation analysis, publication and archive deposition), which shall first be submitted to and approved in writing by the said Authority. Reasonable access shall be afforded to any Local Planning Authority nominated person who shall be allowed to observe the excavations. A report on the excavation results shall be submitted to the Local Planning Authority within twelve months of the completion of the field investigation. Condition 14 - Prior to the occupation of each building details of any external lighting shall be submitted to and approved in writing by the Local Planning Authority. This scheme shall detail the locations, heights, design and lux of all external lighting associated with that building. The development shall be carried out in accordance with the approved lighting scheme. Condition 30 - Alterations to one part of the condition: (a) Proposed buildings within Brownfield areas must be attenuated to 70% of the existing rate (based on 140 l/s/ha of proven connected impermeable areas). Storage volume calculations, using computer modelling, must accommodate a 1:30 year storm with no surface flooding, along with no internal flooding of buildings or surface run-off from the site in a 1:100 year storm. Proposed areas within the model must also include an additional 20% allowance for climate change. The modelling must ... view the full minutes text for item 41.