CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
City of York Council
Planning Main, Thursday 25 June 2015 at 3.30pm

R S Cockerill York Limited, Stamford Bridge Road, Dunnington, York (15/00871/FUL)

Approved Planning 2 papers

Planning Main approved this item on Thursday 25 June 2015. Below is the council's own wording, with the papers it was decided on.

Item15

Resolved

That the application be approved subject to the conditions outlined in the committee report and the additional conditions relating to drainage and the position of the building as reported by the officer in her update. Reason: It is considered that the other considerations put forward by the applicant, particularly in relation to the operational need and efficiency for the store at this particular location and the sustainability benefits of siting the building within the existing complex, together with the mitigation of other harm through the design and layout of the proposal and planning conditions, clearly outweigh the harm to the Green Belt by reason of inappropriateness and any other harm, and thereby amount to very special circumstances to allow the inappropriate development in the York Green Belt, even when substantial weight is given to any harm to the Green Belt.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Planning Main, 10 pages

COMMITTEE REPORT

Date: 25 June 2015 Ward: Osbaldwick And Derwent Team: Major and Parish: Holtby Parish Council Commercial Team

Reference: 15/00871/FUL Application at: R S Cockerill York Limited Stamford Bridge Road Dunnington York YO19 5AE For: Erection of potato store By: Providence Holdings Ltd Application Type: Full Application Target Date: 16 June 2015 Recommendation: Approve

1.0PROPOSAL

1.1The application relates to Cockerill's potato processing site located off Stamford Bridge Road in Holtby. The proposal is to construct a potato store within the existing enterprise.

1.2Cockerill's Potato processing site consists of potato storage and processing buildings, offices, agricultural buildings and a dwelling set in an open area of countryside before the turn off to Holtby village on the Stamford Bridge Road.

1.3The 465 sq.m proposed building is to be located on the north western corner of the site. Access is through the main complex of buildings which are served via a substantial access point from the Stamford Bridge Road. The Building is a typical agricultural design measuring 24 metres by 19 metres with a maximum height of just over 9.4 metres and constructed of composite sheeting with pitched composite sheet roof. The building is to be used for boxed potato storage. The temperature and ventilation within the building is controlled to minimise wastage.

PLANNING HISTORY

1.4Permission was refused in 2004 for a two storey staff welfare and potato quality assessment. In refusing the application it was concluded that there were no very special circumstances to outweigh harm to the Green Belt. (04/03048/FUL)

1.5Permission was refused in September 2008 for an extension to the farmhouse to provide employee's self contained accommodation. The development was considered to be harmful to the Green Belt. (08/01844/FUL)

Application Reference Number: 15/00871/FUL Item No: 4a 1.6 Permission was granted in August 2008 for the erection of extension to pack house to provide additional potato washing facilities, grading, packing, storage, staff facilities and covered loading bay as well as additional manoeuvring space and the installation of waste water treatment plant. (08/00856/FULM)

1.7Permission was granted in October 2011 for a 15 metre high wind turbine (11/02307/FUL). A non-material amendment relating to the siting of the turbine was granted in November 2011. (11/03060/NONMAT)

1.8No objections were raised to the erection of an agricultural building being erected under permitted development in May 2012 (12/01528/AGNOT).

1.9Objections were raised to a further agricultural building being erected under permitted development in March 2015 as the building was not considered to be reasonably necessary for the purposes of agriculture within the unit. (15/00299/AGNOT)

CYGB1 - Development within the Green Belt

CYGB11 - Employment devt outside settlement limits

2.0POLICY CONTEXT

2.1Development Plan Allocation: City Boundary GMS Constraints: York City Boundary 0001 Green Belt 2.2 Policies: CYSP3 Safeguarding the Historic Character and Setting of York CYGP1 Design CYGP4A Sustainability CYGP9 Landscaping CGP15ADevelopment and Flood Risk CYGB1 Development within the Green Belt CYGB11 Employment development outside settlement limits

3.0CONSULTATIONS

EXTERNAL

3.1HOLTBY PARISH COUNCIL - have concerns about the business continuing to grow and becoming more of an industrial operation rather than what would be considered to be agricultural. Concerns in particular relate to noise and light pollution, screening and of large numbers of potato boxes on site.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
15 00871 FUL Site PlanPlan 1 pages Download
PDF
R S Cockerill York Limited, Stamford Bridge Road, Dunnington, York (15/00871/FUL)Report 10 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

15 of 16 attended
AR
Councillor Ann ReidChair, present
FD
Councillor Fiona DerbyshireVice-Chair, present
JG
Councillor John GalvinCommittee Member, present
NA
Councillor Nigel AyreCommittee Member, present
SB
Councillor Stuart BarnesCommittee Member, present
BB
Councillor Barbara BoyceCommittee Member, present
CC
Councillor Chris CullwickCommittee Member, present
IC
Councillor Ian CuthbertsonCommittee Member, present
AD
Councillor Andy D'AgorneCommittee Member, apologies
PD
Councillor Peter DewCommittee Member, present
PD
Councillor Paul DoughtyCommittee Member, present
CF
Councillor Christina FunnellCommittee Member, present

All 16 on the meeting page

On this subject at York

Search all
  1. R S Cockerill York Limited, Stamford Bridge Road, Dunnington, York (15/00871/FUL)This decision
  2. R S Cockerill York Ltd, Stamford Bridge Road, Dunnington, York [18/02937/FUL]Approved
  3. R S Cockerill York Limited, Stamford Bridge Road, Dunnington, York, YO19 5AE (08/00856/FULM)Approved

More from York Planning Main

All decisions
MeetingDecisionOutcome
5 May 2022 MinutesThat subject to the addition of Cllrs Melly and Ayre to the list of apologies, the minutes of the last meeting held o... Approved Open
7 Apr 2022 Minutesi. That the minutes of the meeting held on 3 February 2022 be approved and then signed by the chair as a correct reco... Approved Open
3 Mar 2022 MinutesThat the minutes of the last meeting held on 3 February 2022 be approved at the next meeting. Approved Open
3 Mar 2022 Lindum Group Limited, York Road, Elvington, York YO41 4EP [21/01709/REMM]That the application be approved subject to the conditions listed in the report and the addition of an informative in... Approved Open
3 Feb 2022 MinutesThat, subject to the amendment stated above, the minutes of the last meeting held on 6 January 2022 be approved and s... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies