That the application be approved subject to the conditions outlined in the committee report and the additional conditions relating to drainage and the position of the building as reported by the officer in her update. Reason: It is considered that the other considerations put forward by the applicant, particularly in relation to the operational need and efficiency for the store at this particular location and the sustainability benefits of siting the building within the existing complex, together with the mitigation of other harm through the design and layout of the proposal and planning conditions, clearly outweigh the harm to the Green Belt by reason of inappropriateness and any other harm, and thereby amount to very special circumstances to allow the inappropriate development in the York Green Belt, even when substantial weight is given to any harm to the Green Belt.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 25 June 2015 Ward: Osbaldwick And Derwent Team: Major and Parish: Holtby Parish Council Commercial Team
Reference: 15/00871/FUL Application at: R S Cockerill York Limited Stamford Bridge Road Dunnington York YO19 5AE For: Erection of potato store By: Providence Holdings Ltd Application Type: Full Application Target Date: 16 June 2015 Recommendation: Approve
1.0PROPOSAL
1.1The application relates to Cockerill's potato processing site located off Stamford Bridge Road in Holtby. The proposal is to construct a potato store within the existing enterprise.
1.2Cockerill's Potato processing site consists of potato storage and processing buildings, offices, agricultural buildings and a dwelling set in an open area of countryside before the turn off to Holtby village on the Stamford Bridge Road.
1.3The 465 sq.m proposed building is to be located on the north western corner of the site. Access is through the main complex of buildings which are served via a substantial access point from the Stamford Bridge Road. The Building is a typical agricultural design measuring 24 metres by 19 metres with a maximum height of just over 9.4 metres and constructed of composite sheeting with pitched composite sheet roof. The building is to be used for boxed potato storage. The temperature and ventilation within the building is controlled to minimise wastage.
PLANNING HISTORY
1.4Permission was refused in 2004 for a two storey staff welfare and potato quality assessment. In refusing the application it was concluded that there were no very special circumstances to outweigh harm to the Green Belt. (04/03048/FUL)
1.5Permission was refused in September 2008 for an extension to the farmhouse to provide employee's self contained accommodation. The development was considered to be harmful to the Green Belt. (08/01844/FUL)
Application Reference Number: 15/00871/FUL Item No: 4a 1.6 Permission was granted in August 2008 for the erection of extension to pack house to provide additional potato washing facilities, grading, packing, storage, staff facilities and covered loading bay as well as additional manoeuvring space and the installation of waste water treatment plant. (08/00856/FULM)
1.7Permission was granted in October 2011 for a 15 metre high wind turbine (11/02307/FUL). A non-material amendment relating to the siting of the turbine was granted in November 2011. (11/03060/NONMAT)
1.8No objections were raised to the erection of an agricultural building being erected under permitted development in May 2012 (12/01528/AGNOT).
1.9Objections were raised to a further agricultural building being erected under permitted development in March 2015 as the building was not considered to be reasonably necessary for the purposes of agriculture within the unit. (15/00299/AGNOT)
2.1Development Plan Allocation: City Boundary GMS Constraints: York City Boundary 0001 Green Belt 2.2 Policies: CYSP3 Safeguarding the Historic Character and Setting of York CYGP1 Design CYGP4A Sustainability CYGP9 Landscaping CGP15ADevelopment and Flood Risk CYGB1 Development within the Green Belt CYGB11 Employment development outside settlement limits
3.0CONSULTATIONS
EXTERNAL
3.1HOLTBY PARISH COUNCIL - have concerns about the business continuing to grow and becoming more of an industrial operation rather than what would be considered to be agricultural. Concerns in particular relate to noise and light pollution, screening and of large numbers of potato boxes on site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.