That the application be approved subject to the conditions outlined in the committee report and amended condition 4. Reason: The development is required to accommodate military personnel returning to the UK. Due to its location within the confines of the larger barracks complex, and the mitigation measures proposed as described above, the development would have little external impact. The development accords with national planning policy set out in the NPPF and relevant policies of the 2005 City of York Draft Local Plan.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 20 August 2015 Ward: Fishergate Team: Major and Parish: Fishergate Planning Commercial Team Panel
Reference: 15/01055/FULM Application at: Imphal Barracks Fulford Road York YO10 4HD For: Erection of accommodation block with associated landscaping By: [name removed] Type: Major Full Application (13 weeks) Target Date: 12 August 2015 Recommendation: Approve
1.0PROPOSAL
1.1The proposal is for the erection of a 3-storey building comprising 126 units of living accommodation. The footprint of the building (including internal courtyards) would be approximately 2700sqm. The units would be occupied by military personnel returning to the UK after being based in Germany. Most of the units would provide short-term accommodation for personnel in transit to other bases. The remainder would be larger units for personnel based permanently at the site.
1.2The structure would be rectangular on plan with the living accommodation arranged around two landscaped courtyards. Materials would mainly comprise beige/cream brickwork, green glazed brickwork and grey metal window frames.
1.3The building would replace a recently-demolished, 3-storey CBRN (Chemical, Biological, Radiological, and Nuclear) bunker of approximately 1000sqm plus an area of car parking. An application for a determination as to whether prior approval was required for demolition of the bunker was submitted in 2014 (14/02324/DMNOT). The council concluded that the demolition would not constitute EIA development and raised no objection to the proposal.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
Contaminated Land GMS Constraints:
City Boundary GMS Constraints: York City Boundary 0001
Development Control Local Plan (4th Set of Changes 2005) Policies :-
CYGP1 - Design
CYGP4A - Sustainability
CGP15A - Development and Flood Risk
CYGP9 - Landscaping
CYNE6 - Species protected by law
Draft York Local Plan (2014) Publication Draft – relevant policies include:
DP2 – Sustainable Development
DP3 – Sustainable Communities
SS1 – Delivering Sustainable Growth for York
G14 – Trees and Hedges
CC2 – Sustainable Design and Construction
T1 – Sustainable Access
3.0CONSULTATIONS
INTERNAL
3.1Highway Network Management – Initially requested deferral pending clarification of transport needs of the anticipated personnel, anticipated level of car and cycle parking needed, on-site parking provision and traffic generation. (NB further information has now been supplied – see 4.15 below).
3.2Flood Risk Management – States the development is in low risk Flood Zone 1 and should not suffer from river flooding. No objections in principle. Although the Flood Risk Assessment is insufficient to determine the impact on the existing drainage system and downstream watercourse it shows that a proper drainage solution can be provided. Drainage details should be made a condition of approval.
3.3Environmental Management Landscape) - The loss of mature trees and a brick wall is regrettable as they are characteristic, attractive landscape features of the barracks that can be appreciated within public views of the site. The loss of Application Reference Number: 15/01055/FULM Item No: 4b trees should be compensated for with new, large-species, trees planted within the grounds of Imphal barracks in locations where they will be visible such that they can be sustained into full maturity and contribute to the public amenity and setting of the barracks.
3.4Environmental Management (Ecology) - No objections. Add an informative to protect nesting birds during construction.
3.5Environmental Management (Archaeology) - Excavations may reveal or disturb archaeological features relating to the original barracks or earlier periods. Two conditions have been agreed with the applicant regarding the carrying out of a post-determination evaluation of the site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.