Area Planning Sub-Committee, Thursday 4 August 2016 at 4.30pm

York District Hospital Wigginton Road York YO31 8HE (16/01195/FULM)

Approved Planning 4 papers

Area Planning Sub-Committee approved this item on Thursday 4 August 2016. Below is the council's own wording, with the papers it was decided on.

Item12c

Resolved

That the application be approved subject to the conditions listed in the Officer’s report and the following additional condition; 6. Details of all machinery, plant and equipment to be installed, which is audible above background noise levels at the hospital site boundaries, and proposed noise mitigation measures shall be submitted to the Local Planning Authority. These details shall include maximum ( LAmax (f)) and average ( LAeq ) sound levels (A weighted), and octave band noise levels they produce. All such approved machinery, plant and equipment shall not be used on the site except in accordance with ... view the full minutes text for item 12c
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Area Planning Sub-Committee, 2 pages

CIRCULATED AT MEETING DGENDA 1TOU 4 YORE DISTRICT HOPI TA

York District Hospital 16/01195/FULM UPDATE

BREEAM Statement

BREAAM Excellent will not be achieved as except where derogated the mechanical and electrical services design reflect the need to be to health care standards and comply with the Heath and Technical Memorandums (HTM’s). The impact of being HTM compliant is that generally the plant is of an enhanced specification which means more features (e.g. internal AHU lighting, inspection window, access doors, etc) which leads the equipment to be physically larger. As such, in order the meet the operational requirements of the trust and the HTM’s the current mechanical and electrical design includes duty and standby provision for some plant items such as chillers and domestic hot water generators. This provides the necessary operational robustness and resilience for the clinical environment but in doing increases the amount of plant and associated equipment.

However, the current mechanical and electrical services derive primary heat for heating and hot water generation and the incoming electrical supply from the existing site wide infrastructure. The existing infrastructure benefits from a Combined Heat & Power (CHP) unit rated 1.2MVA. This inherently provides the new building with a proportion of sustainable energy. In addition, the current mechanical and electrical services design also incorporates energy efficient products such as:

o Air Handling Units (AHU) that incorporate heat recovery and the ability to maximise the recovery during various conditions. The fan motors are all driven by inverter driven motors that run at the speed required and hence only use a minimum amount of energy to run.

© The cooling plant is modular and each module has inverter driven compressor motors which only run when required and at the relative speed required saving energy during operation and throughout the life time of the unit.

© The internal lighting is predominantly LED based meaning lower energy consumption and longer lamp life’s. The external feature lighting is also LED. We have combined the light fittings with lighting controls that incorporate dimming, absence and presence detection where appropriate and the overail solution is not only effective but very energy efficient.

o There is aiso a modern ‘Building Management System’ (BMS) that monitors, assesses and controls the various systems to reflect the specific operational requirements. Along with fault monitoring this save energy by switching system on and off when required and providing an ‘failure alert’ minimising any wasted energy due to a faulty component.

Point of Clarification

The representation detailed in the report raises concern specifically about out of hours noise associated with the installation of a new heat exchanger in the boiler house and asks for noise restrictions for out of hours working. This is considered to be covered by the planning condition restricting construction and loading/ unloading to 0800-1800 Monday to Friday and 0900-1300 Saturday with no works on Sundays or bank holidays.

PTO Additional condition

Details of all machinery, plant and equipment to be installed, which is audible above background noise levels at the hospital site boundaries, and proposed noise mitigation measures shall be submitted to the local planning authority. These details shall include maximum {LAmax(f}) and average (LAeq) sound levels (A weighted}, and octave band noise leveis they produce. All such approved machinery, plant and equipment shall not be used on the site except in accordance with the prior written approval of the local planning authority. The machinery, plant or equipment and any approved noise mitigation measures shall be appropriately maintained thereafter.

Reason: to protect the amenity of nearby occupiers of premises.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
BREEAM Statement circulated at mtgReport 2 pages DownloadRead as text
PDF
BREEAM additional info provided to Members at mtgReport 8 pages Download
PDF
York District Hospital Wigginton Road York YO31 8HE (16/01195/FULM)Report 6 pages Download
PDF
York District Hospital.pdfReport 1 pages Download

At this meeting

Whole meeting

On this subject at York

Search all
  1. York District Hospital Wigginton Road York YO31 8HE (16/01195/FULM)This decision
  2. The York Business Improvement District - Ballot for 2026-2031Agreed
  3. City of York Council response to consultation on Selby District Council ‘Pre-submission Publication Local Plan ConsultationAgreed
  4. The York Business Improvement District Renewal BallotAgreed
  5. York District Hospital Wigginton Road York YO31 8HE [19/01880/FULM]Approved
  6. Renewal ballot for the York Business Improvement District (BID)Noted

More from York Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
28 Apr 2022 MinutesThat the minutes of the Area Planning Sub-Committee meeting held on 14 April 2022be approved and signed by the Chair ... Approved Open
28 Apr 2022 Former B and M Stores Site, Stirling Road [21_02220_FULM]That the application be approved subject to the conditions in the report and the amendment to condition 21 which spec... Approved Open
28 Apr 2022 Land Comprising Field At 463582 452080 Murton Way [21/00415/FULM]That the application be approved subject to the conditions, including a ‘Grampian’ condition regarding groundwater te... Approved Open
28 Apr 2022 Church House, 10 - 14 Ogleforth, York YO1 7JG [21/00601/FULM]To APPROVE the application subject to the completion of a Section 106 agreement and the conditions as set out in the ... Approved Open
14 Apr 2022 MinutesThat the minutes of the Area Planning Sub-Committee meeting held on 16 February and 10 March 2022be approved and then... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies