Item 23For approval
A19 Pinch Point Scheme Phase 2 - Crockey Hill
This report presents a design proposal for the second phase of the Pinch Point Scheme concerning the A19 south transport corridor and asks for approval from the Executive Member to implement the proposed engineering works situated at the junction of the A19 and Wheldrake Lane, at Crockey Hill.
What is in the pack5 papers, about 4 MB
ReportA19 Pinch Point Scheme Phase 2: Crockey HillThe report to the committee
217 KB
Appendix ASummary of public consultation responsesSupporting paper
98 KB
Appendix BProposed Crockey Hill schemeSupporting paper
1.6 MB
Appendix CStage 1 Road Safety AuditSupporting paper
271 KB
Appendix DAdditional path in western vergeSupporting paper
1.8 MB
Read and search every page of this itemPro opens all 5 papers, and keeps them if the council removes them.