That on completion of a S106 agreement to secure a financial contribution of £3,195 towards off-site sports provision in the city, DELEGATED authority be given to the Assistant Director (Planning and Public Protection) to APPROVE the application subject to the conditions listed in the report and the amended and additional conditions below and an additional condition in relation to the design of the bay windows. Amended Condition 10 ( Archeology ) The development shall be carried out in accordance with the written scheme of investigation by York Archaeological Trust received by the local planning authority on 31 October 2017. Reason: The site lies within an Area of Archaeological Importance and the development will affect important archaeological deposits which must be recorded during the construction programme. Additional Condition 14 - Cycle Storage The residential building shall not be occupied until the proposed ... view the full minutes text for item 20f
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 9 November 2017 Ward: Guildhall Team: Major and Parish: Guildhall Planning Panel Commercial Team
Reference: 17/01546/FULM Application at: Colin Hicks Motors Garage And Yard Rear Of 33 Bootham York YO30 7BP For: Erection of 14no. flats (use class C3) following demolition of car repair garage By: [name removed] Type: Major Full Application (13 weeks) Target Date: 11 October 2017 Recommendation: Approve subject to Section 106 Agreement
1.0PROPOSAL
1.1Demolition of a single-storey car repair workshop (use class B2) and erection of a 4-storey residential building comprising 14 flats and apartments (1 x 2-bedroom duplex apartment; 7 x 1-bedroom flats; and 6 x 1-bedroom studio flats). Cycle storage, refuse/recycling facilities and visitor parking for two cars would be provided on the ground floor. Access would be from Bootham Row, as existing.
1.2The application is a revised resubmission of 15/02762/FUL, which was for nine, larger, flats (4 x 3 bed and 5 x 2 bed). The application was approved in July 2016. The main change to the external appearance of the approved scheme is that the top-floor accommodation, which occupies part of the footprint of the building, would be extended by 1.7m towards the north-east, i.e. towards Bootham Place. The top floor accommodation would be the upper floor of the proposed 2-bedroom duplex apartment.
1.3The approved scheme remains valid and is the fallback position if the current application is refused.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
Areas of Archaeological Interest GMS Constraints: City Centre Area 0006 Conservation Area GMS Constraints: Central Historic Core CONF
2.2Draft 2005 Development Control Local Plan Policies:
CYGP1 - Design Application Reference Number: 17/01546/FULM Item No: Page 1 of 12 CYGP4A Sustainability H3 Conservation Areas H4 Listed Buildings CGP15A Development and Flood Risk CYH4A Housing Windfalls
2.3Pre-Publication Draft Local Plan (September 2017) Policies:
D4 Conservation Areas ENV5 Sustainable Drainage D1 Placemaking
3.0CONSULTATIONS
INTERNAL
Design, Conservation and Sustainable Development (Archaeology)
3.1Due to the location within the Area of Archaeological Importance, a watching brief should be maintained on the site as a precautionary measure during groundworks ahead of construction of the building.
Education
3.2No financial contribution required.
Public Health Programme Manager (Sports and Physical Activity)
3.3A financial contribution of £3,195 will be required towards off-site sports provision in the city. The money would be used for improvements to sports facility at Door 84 community centre in the Groves, York.
Public Realm (Amenity and Leisure)
3.4No amenity or play contributions are required due to regulations restricting the pooling of contributions.
Public Protection
3.5No objections subject to conditions to cover: submission of a Construction Environmental Management Plan (CEMP), hours of demolition/construction; sound insulation; recharging of electric vehicles; and contaminated land.
Flood Risk Management
Application Reference Number: 17/01546/FULM Item No: Page 2 of 12 3.6 The revised drainage proposals, including discharge rates and on-site storage rates are satisfactory.
Waste Services
3.7Recommended containers for refuse are 2 x 1100 litre bins and 1 x 360 litre bin.
EXTERNAL
Guildhall Planning Panel
3.8No response.
Yorkshire Water
3.9No comments to make.
Historic England
3.10Does not wish to comment.
Neighbour Notification and Publicity
3.11Four objections have been received raising the following planning issues:
Overlooking/loss of privacy Overdevelopment Overbearing Overshadowing Inadequate space for refuse/recycling bins Poor living standards for residents of flats Would not significantly increase supply of housing for local residents Noise nuisance and disturbance Would exacerbate traffic and parking problems Should include provision for recharging of electric vehicles Any tree planting should be limited to 3m high
4.0APPRAISAL
4.1KEY ISSUES
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.