Germany Beck Site, East Of Fordlands Road [17/00904/FUL]

Approved Planning 2 papers

Planning Main approved this item on Thursday 18 January 2018. Below is the council's own wording, with the papers it was decided on.

Item24

Resolved

That the application be approved. Reason: The application seeks retrospective consent for engineering operations involved in the creation of a water vole habitat within a Site of Importance to Nature Conservation south of Germany Beck to meet the requirements of a conservation licence from Natural England. It is considered not to be EIA Development. The works are not inappropriate development in the Green Belt under paragraph 90 of the NPPF. The works compensate for the impact on existing water vole habitat from development works in the adjacent beck and provide an enhanced habitat. There have been no objections raised from statutory consultees, subject to the imposition of conditions relating to the reporting of the already undertaken archaeological investigations and a SINC specific management plan. The proposal is, therefore, considered to accord with national and local planning policy and is recommended for approval.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Planning Main

COMMITTEE REPORT

Date: 18 January 2018 Ward: Fulford And Heslington Team: Major and Parish: Fulford Parish Council Commercial Team

Reference: 17/00904/FUL Application at: Germany Beck Site East Of Fordlands Road York For: Creation of wetland habitat suitable for water voles (retrospective) By: Persimmon Homes (York) Ltd Application Type: Full Application Target Date: 13 June 2017 Recommendation: Approve

1.0PROPOSAL

1.1The application seeks full retrospective separate planning permission for the engineering operations involved in the creation of a wetland habitat suitable for water voles. It is not a section 73 variation to the outline planning permission. The creation of the habitat was required following the discovery of water voles in Germany Beck in 2015 and confirmed following a survey in 2016, which would be potentially displaced by the proposed works to the beck as a result of the Germany Beck housing scheme. The form and design of the wetland habitat and the timing of its creation was agreed under a conservation licence by Natural England.

1.2The wetland habitat is located within an area of land to the south of Germany Beck, to the east of the cemetery on Fordlands Road. The area is designated a Site of Importance to Nature Conservation (SINC). The habitat consists of an elliptical shaped earth bund measuring 30m x 20m approximately set at 45 degrees and extending to a height of 9.5m AOD (existing ground level is approximately 7.6m AOD), encircled by a 4.5m wide moat of water dropping to 6.0m AOD. The habitat has been designed to increase the habitat available for water vole and provide them with a refuge from flooding by means of a raised island. The habitat is divided into four planting zones, including marginal planting along the water’s edge and along the shallow bank, submerged planting in the shallow water and planting on the mound.

ENVIRONMENTAL IMPACT ASSESSMENT REQUIREMENTS

1.3The Germany Beck housing scheme fell within the thresholds and criteria of Schedule 2 Development listed in the then Town and Country Planning (Environmental Impact Assessment) Regulations 1999 and was therefore considered to be EIA Development that was accompanied by an Environment Statement (“ES”).

Application Reference Number: 17/00904/FUL Item No: 4a 1.4 An addendum (dated January 2017) to the ES has been submitted with this full application. However, this application is a separate full application for engineering excavations required by Natural England to comply with their licence requirements under separate legislation. It is not a subsequent application as it does not seek reserved matters consent nor is it required under an approval of detail under a condition on the outline consent. Further, it does not conflict with the management plan approved as part of a previous condition of approval on the outline. The site of the full application is not within a 'sensitive area' as defined in the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 ("EIA Regs 2017"). When considered in isolation, the application for a water vole habitat is not an application for planning permission for EIA Development under Schedule 1 or 2 of the EIA Regs 2017. The application would only fall within Schedule 2 by virtue of para.13(b) if the change to the approved development (i.e. the residential scheme) is likely to give rise to significant adverse effects on the environment. Given the scale of the proposed development, the reason for it and the environmental information already available about ecology, archaeology and flood risk in particular, it is considered that there would likely be no such significant adverse environmental effects.

1.5Therefore, despite the submission of the ES Addendum, the application would not be EIA Development by virtue of Schedule 1 or 2 of the EIA Regs 2017 and, as such, is not an EIA Application that needs to be publicised as such.

2.0POLICY CONTEXT

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
17_00904_FUL Site Location PlanPlan 189 KB Download
PDF
Germany Beck Site, East Of Fordlands Road [17/00904/FUL]Report 113 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 15 attended
NA
Councillor Nigel AyreChair, present
FD
Councillor Fiona DerbyshireVice-Chair, present
AR
Councillor Ann ReidCommittee Member, present
CC
Councillor Chris CullwickCommittee Member, present
IC
Councillor Ian CuthbertsonCommittee Member, present
AD
Councillor Andy D'AgorneCommittee Member, present
PD
Councillor Peter DewCommittee Member, present
PD
Councillor Paul DoughtyCommittee Member, apologies, sent representative
CF
Councillor Christina FunnellCommittee Member, present
JG
Councillor John GalvinCommittee Member, present
JL
Councillor Janet LookerCommittee Member, present
MP
Councillor Michael PavlovicCommittee Member, present

All 15 on the meeting page

On this subject at York

Search all
  1. Germany Beck Site, East Of Fordlands Road [17/00904/FUL]This decision
  2. Germany Beck Flood Alleviation Scheme UpdateNoted
  3. Germany Beck Flood Scheme UpdateNoted
  4. 16:35 - Presentation by Persimmon Homes regarding Reserved Matters for the Germany Beck Development.Noted

More from York Planning Main

All decisions
MeetingDecisionOutcome
5 May 2022 MinutesThat subject to the addition of Cllrs Melly and Ayre to the list of apologies, the minutes of the last meeting held o... Approved Open
7 Apr 2022 Minutesi. That the minutes of the meeting held on 3 February 2022 be approved and then signed by the chair as a correct reco... Approved Open
3 Mar 2022 MinutesThat the minutes of the last meeting held on 3 February 2022 be approved at the next meeting. Approved Open
3 Mar 2022 Lindum Group Limited, York Road, Elvington, York YO41 4EP [21/01709/REMM]That the application be approved subject to the conditions listed in the report and the addition of an informative in... Approved Open
3 Feb 2022 MinutesThat, subject to the amendment stated above, the minutes of the last meeting held on 6 January 2022 be approved and s... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies