CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
City of York Council
Area Planning Sub-Committee, Thursday 5 July 2018 at 4.30pm

Burton Stone Community Centre, Evelyn Crescent, York, YO30 6DR [18/00082/GRG3]

Approved Planning 2 papers

Area Planning Sub-Committee approved this item on Thursday 5 July 2018. Below is the council's own wording, with the papers it was decided on.

Item20

Resolved

That the application be approved subject to the conditions listed in the report, the additional condition detailed below in relation to highway works and a condition to ensure that a historic record of the gymnasium building was kept: Additional Condition The development hereby permitted shall not come into use until the following highway works (which definition shall include works associated with any Traffic Regulation Order required as a result of the development, signing, lighting, drainage and other related works) have been carried out in accordance with details which shall have been previously submitted to and approved in writing by the Local Planning Authority, or arrangements entered into which ensure the same Heavy duty dropped crossovers to car park areas, removal and reinstatement for redundant crossings installation of 2 new pairs of tactile crossing shown indicatively on site plan. Resurfacing of footway to full frontage of development to avoid patched appearance. Reason: In the interests of the safe and free passage of highway users. Reason: Concerns have previously been expressed in terms of the design and ... view the full minutes text for item 20.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Area Planning Sub-Committee, 13 pages

COMMITTEE REPORT

Date: 5 July 2018 Ward: Clifton Team: Major and Parish: Clifton Planning Panel Commercial Team

Reference: 18/00082/GRG3 Application at: Burton Stone Community Centre Evelyn Crescent York YO30 6DR For: Extension of existing extra care facility to provide 29no. apartments and 4no. bungalows with associated communal facilities and provision of new multi-use community facility following demolition of existing community centre By: City Of York Council Application Type: General Regulations (Reg3) Target Date: 9 July 2018 Recommendation: Approve

1.0PROPOSAL

1.1Burton Stone Community Centre comprises part of the site of the former Burton Stone Secondary Modern School which was closed in the mid 1980s. The site was redeveloped as Marjorie Waite Court, a three storey brick complex providing extra care housing for the elderly with the retained buildings of the School remaining as the Community Centre. These comprise a large brick built gymnasium building dating to the 1930s centrally placed within the site together with a brick and curtain wall clad former teaching block at the north eastern edge with a section of former hard play area directly to the east. Surrounding the site is a development of Local Authority Housing dating to the immediate Post War period.

1.2Planning permission is sought for the construction of a substantial extension to Marjorie Waite Court providing further extra care housing incorporating 29 one bed room apartments and four bungalows, for the elderly of the most up to date design, two single storey brick built bungalows providing further care accommodation. The proposal has been amended since submission to address design concerns in relation to the original scheme specifically in relation to the landscaping of the site frontage.

2.0POLICY CONTEXT

2.1Publication Draft City of York Local Plan (2018) Policies:-

D1 Placemaking

D7 Non Designated Heritage Assets

Application Reference Number: 18/00082/GRG3 Item No: 4e ENV5 Sustainable Drainage

2.2York Development Control Local Plan (2005) Policies:

CYC1 Criteria for community facilities

CYGP1 Design

3.0CONSULTATIONS

INTERNAL:-

Public Protection:-

3.1Raise no objection to the proposal but wish to see any permission conditioned to require appropriate levels of noise insulation, appropriate measures to control noisy plant and cooking odours together with restrictions on the operating hours of the proposed community facility.

Highway Network Management:-

3.2Express concerns in respect of the detailed layout of the site. The design has subsequently been amended to address the concerns raised in terms, of pedestrian access, vehicle and cycle parking

Strategic Flood Risk Management:-

3.3Raise no objection to the scheme as revised.

Design, Conservation and Sustainable Development (Design):-

3.4Express concerns in terms of the justification for the loss of the 1930's gymnasium building together with the design and layout of the scheme. Further comments will be reported orally at the meeting.

Design, Conservation and Sustainable Development (Landscape):-

3.5Raise no objection to the proposal subject to the satisfactory resolution of a detailed planting regime.

Design, Conservation and Sustainable Development (Ecology):-

Application Reference Number: 18/00082/GRG3 Item No: 4e 3.6 Raise concerns in respect of the potential for the gymnasium building to house a bat roost. Further comments will reported orally at the meeting. Public Health (Sport and Active Leisure):-

3.7Express some concerns in respect of the design and layout of the proposal and the availability of an appropriate area and quality of amenity space.

EXTERNAL:-

Clifton Planning Panel:-

3.8Raise no objection in principle to the proposal but express some concern in respect of the loss of the existing community facility.

Yorkshire Water Services Limited:-

3.9Raise no objection to the scheme as revised.

The Foss (2008) Internal Drainage Board:-

3.10Raise no objection to the proposal.

Sport England:-

3.11Raise no objection to the proposal.

North Yorkshire Police Designing Out Crime Officer:-

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Burton Stone Community Centre, Evelyn Crescent, York, YO30 6DR [18/00082/GRG3]Report 13 pages DownloadRead as text
PDF
MapReport 1 pages Download

At this meeting

Whole meeting

On this subject at York

Search all
  1. Burton Stone Community Centre, Evelyn Crescent, York, YO30 6DR [18/00082/GRG3]This decision
  2. Morrell House, 388 Burton Stone Lane, York, YO30 6EZ [22/01504/FULM] (4.37 pm)Approved
  3. Burton Stone Lane – Ward Committee Scheme – Traffic Calming ImprovementsApproved
  4. 1 Duncombe Barracks, Burton Stone Lane, York, YO30 6BU [20/01902/FULM]Approved
  5. 1 Duncombe Barracks, Burton Stone Lane, York, YO30 6BU [20/01902/FULM]Deferred
  6. Duncombe Barracks, Burton Stone LaneApproved

More from York Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
28 Apr 2022 MinutesThat the minutes of the Area Planning Sub-Committee meeting held on 14 April 2022be approved and signed by the Chair ... Approved Open
28 Apr 2022 Former B and M Stores Site, Stirling Road [21_02220_FULM]That the application be approved subject to the conditions in the report and the amendment to condition 21 which spec... Approved Open
28 Apr 2022 Land Comprising Field At 463582 452080 Murton Way [21/00415/FULM]That the application be approved subject to the conditions, including a ‘Grampian’ condition regarding groundwater te... Approved Open
28 Apr 2022 Church House, 10 - 14 Ogleforth, York YO1 7JG [21/00601/FULM]To APPROVE the application subject to the completion of a Section 106 agreement and the conditions as set out in the ... Approved Open
14 Apr 2022 MinutesThat the minutes of the Area Planning Sub-Committee meeting held on 16 February and 10 March 2022be approved and then... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies