That the application be approved subject to referral to the Secretary of State, the conditions listed on the report and the following amended wording to conditions 12 and 15 and additional conditions 17, 18, 19, 20 and 21. Amended Condition 12 Before the occupation of the development a scheme for Electric Vehicle Recharging Point(s) shall be provided in a position and to a specification to be first agreed in writing by the Council. Within 3 months of the first occupation of the development, the owner will submit to the Council for approval in writing (such approval not be unreasonably withheld or delayed) an Electric Vehicle Recharging Point Maintenance Plan that will detail the maintenance, servicing and networking arrangements for each Electric Vehicle Recharging Point for a period of 10 years. Reason: To promote and facilitate the uptake of electric vehicles on the site in line with the Council’s Low Emission Strategy (LES) and the National Planning Policy Framework (NPPF). Amended Condition 15 The approved detailed landscape proposals, in accordance with drawing no. 50084-DR-LAN-102 rev D shall be implemented within a period of six months of the completion of the development and shall be for the lifetime of the development. Any trees or plants which within a period of five years from the substantial completion of the planting and development, die, are ... view the full minutes text for item 7.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 13 June 2019 Ward: Wheldrake Team: Major and Parish: Elvington Parish Council Commercial Team
Reference: 18/02839/FULM Application at: Land Lying To The South Of Elvington Airfield Network Elvington York For: Erection of two storey industrial building (mixed use class B1, B2, B8) with access and associated parking By: c/o Agent Application Type: Major Full Application (13 weeks) Target Date: 1 July 2019 Recommendation: Approve after referral to Sec. of State
1.0PROPOSAL
1.1The application site lies to the south of Elvington Airfield Industrial Estate approximately 6 miles south east of York. Vehicular access is to the north of the site, from Brinkworth Rush which connects through the industrial estate to Elvington Lane (B1228).The site lies in flood zone 1 and within the general extent of the Green Belt. The site forms part of the 2018 Publication Draft Local Plan site allocation ST26 (Land South of Elvington Airfield).
1.2The site occupies approximately one third of an existing arable field that is bound to the east with a single row of mature trees - predominantly Oak. The soil is sandy and appears to be naturally drained. A young, trimmed, native hedge runs along the northern boundary of the site. A semi-mature, mixed, narrow shelter belt forms the western boundary of the main field, alongside an old airfield lane. The access to Cannon House Farm borders the southern boundary of the main field.
1.3The applicant is Sheppee International Ltd. The company focuses on developing new machinery to handle hot glass within the manufacturing process of bottles. 90% of the produced handles and lehr loaders are exported out of the UK, primarily to Europe for machinery supplying the wine and beer industries. Over 85 percent of the parts used in the manufacture of the machinery are sourced from within the UK, where nearly 40 percent of parts are supplied to Sheppee from other Yorkshire based companies. The company is local to York, having been established in 1902 in James Street and operating from the existing Elvington Business Park since 1993. Sheppee currently operates from five different units in the business park. The purpose of the application arises from the need to consolidate operations to improve efficiency, and also gain additional floorspace to allow expansion, meaning they need to find alternative premises.
Application Reference Number: 18/02839/FULM Item No: 4c 1.4 Full planning permission is sought for the erection of a two storey industrial building (mixed use class B1, B2, B8) with access and associated parking.
1.5The proposed building would have a shallow dual pitched roof, reaching a maximum of 11.4 metres in height, 30.8 metres wide and 103.2 metres in length. The building is rectangular in shape and will have a footprint of 3,065 square metres. The building will contain 696 square metres of office space over two floors at the northern end of the building.
1.6The walls of the building will predominantly be alternate vertical cladding sections of light (albatross) grey and dark (anthracite) grey. The cladding at the office end of the site
1.7Vehicular access will be off Brinkworth Rush with 61 car parking spaces proposed, 6 of which would be disabled. Cycle parking will also be proposed as is ancillary development including waste storage, a sub station, hard and soft landscaping and an area of hard standing adjacent to the proposed building to allow for access and a turning circle for HGVs.
2.0POLICY CONTEXT
2.1(Revoked) Yorkshire and Humber Regional Spatial Strategy (saved policies)
YH9(C) Y1 (C1 and C2)
2.22018 Publication Draft Local Plan (Draft Plan)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.