That the application be approved subject to the conditions listed in the report and amended Condition 14 below: Amended Condition 14 Large scale details (at 1:10 or 1:20) of the items listed below shall be submitted to and approved in writing by the Local Planning Authority prior to the construction of the dwelling and the works shall be carried out in accordance with the approved details. a) All windows and doors, in context and including section drawings, on the front elevation of the building. b) Eaves/verge of roof Reason: In interests of the character and appearance of the area. Reason: The proposed replacement dwelling, although materially larger than the existing bungalow will not be out of place in this location due to the existing.esidential character of large suburban dwellings and is considered to be in compliance with paragraph 127 of the NPPF and Policy D1 of the 2018 Draft Plan. The design is in keeping with the arts and craft character of the Horseshoe. The revised proposal excluding the balcony is considered to be acceptable on the grounds of residential amenity due to its design and location. Conditions are also considered necessary for highways, drainage and land contamination reasons.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 3 October 2019 Ward: Dringhouses And Woodthorpe
Team: West Area Parish: Dringhouses/Woodthorpe Planning Panel
Reference: 19/01140/FUL Application at: 26 The Horseshoe York YO24 1LX For: Erection of 1no. dwelling with associated crossover following demolition of existing bungalow and outbuildings By: [name removed] Type: Full Application Target Date: 21 August 2019 Recommendation: Approve
1.0PROPOSAL
1.1The application site is 26 The Horseshoe, located off Tadcaster Road in Dringhouses. The site is on the western side of the street. The site contains a single storey detached bungalow of brick construction with a front and rear garden. There is an existing garage and driveway with crossover on the southern boundary of the site. There are dwellings either side of the site and opposite the front. To the rear of the site is the east coast railway line.
1.2The Horseshoe is a residential street, laid out in the 1920s with the dwellings constructed in an arts and crafts style. Many of the dwellings are detached and have large rear gardens, particularly those bordering the railway line. There have been two replacement dwellings constructed on the street in recent years at no 18 and 20.
1.3The application site lies in partly in flood zones 2 and 3. The existing dwelling is sited wholly in flood zone 1. The culverted Holgate Beck is at the rear of the site in the rear garden.
1.4Planning permission is sought for the erection of 1no. dwelling with associated crossover following the demolition of the existing buildings on site.
1.5The proposed replacement dwelling is two storey in height with additional living space in the attic. The design is based on the arts and crafts style already evident in buildings on the street and includes design features such as external chimney stacks and splayed eaves to the roof. Proposed materials will be plain clay Application Reference Number: 19/01140/FUL Item No:
Page 1 of 15 tiles, with clay ridges. The dormer to the rear is to be lead clad and the rooflights proposed to the front elevation will be flush with the roof slope. Brickwork is to be from 65mm handmade bricks in old English bond using a lime mortar with detailing at the eaves.
1.6The dwelling will be a maximum of 15.5 metres wide (excluding the semi detached chimney stack to the south elevation) and a maximum of 24.1 metres deep. This includes a 5.5 metre two storey rear projection in the north western corner. The building will be 9 metres high to the roof of the ridge, excluding the chimney stacks which measure 1.3 metres above the ridge.
1.7Planning History
18/02523/FUL - Formation of 2m high bund to rear garden. – Pending decision
19/01334/CPD - Certificate of lawfulness for proposed development for erection of detached garage to rear as detailed on drawing no's 01 and 09 – Pending decision
1.8The planning application was called in for determination by Committee by Councillor Fenton following an objection from the occupiers of a neighbouring dwelling raising concerns over a loss of amenity.
2.0POLICY CONTEXT
National Planning Policy Framework
2.1The revised National Planning Policy Framework (NPPF) 2019 was published on 19 February 2019 and sets out the government's planning policies for England and how these are expected to be applied. 2.2 The planning system should contribute to the achievement of sustainable development (Paragraph 7). To achieve sustainable development, the planning system has three overarching objectives; economic, social and environmental objectives. Paragraph 14 advises that at the heart of the Framework there is a presumption in favour of sustainable development. Publication Draft Local Plan 2018
2.3The Publication Draft City of York Local Plan 2018 ('2018 Draft Plan') was submitted for examination on 25 May 2018. In accordance with paragraph 48 of the NPPF the Draft Plan policies can be afforded weight according to: -The stage of preparation of the emerging plan (the more advanced the preparation, the greater the weight that may be given);
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.