That the application be Approved subject to the conditions listed in the report with the addition that delegated authority be given to the Head of Development Services as regards a satisfactory drainage solution, which may result in additional conditions. Reason: The provision of the tennis centre would allow for improved sports provision at the Haxby Road site which has the benefit of being able to be used year round. An existing community use agreement is in place at the site. The site is relatively well screened from the highway and the visual intrusion would be limited. It is considered that the application accords with the NPPF, particularly paragraphs 96 and 97, policies ED5, GI1, GI5 and HW3 of the Publication Draft Local Plan (2018) and Policy GP7 of City Of York Draft Local Plan (2005).
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 5 December 2019 Ward: Huntington/New Earswick
Team: East Area Parish: New Earswick Parish Council
Reference: 19/01667/FULM Application at: York St John University Sports Centre Haxby Road York YO31 8TA For: Erection of indoor tennis facility. By: York St John University Application Type: Major Full Application (13 weeks) Target Date: 1 November 2019 Recommendation: Approve
1.0PROPOSAL
1.1The application seeks permission to replace the existing two outdoor tennis/netball courts with thee indoor tennis courts at the Mille Crux York St John University Sports Park at Haxby Road.
1.2The site comprises land either side of Haxby Road, for which planning permission was granted in February 2013 for outdoor sports facilities. The site, which covers 24ha, comprises the Northfields site (to the West of Haxby Road) which has 2 football/rugby pitches, 3 football pitches and up to 3 junior pitches. The Mille Crux site (to the east) comprises of a full size 3G all-weather football/rugby pitch, a sand based hockey/multi-sport pitch, 3 outdoor tennis courts and 2 outdoor tennis/netball courts together with grass pitched and a running track along with the Sports Hub building containing teaching facilities, changing facilities, social space and indoor sports hall.
1.3The application site comprises of an area occupied by two macadam surfaced outdoor courts to the east of the existing Hub building and sports hall. The courts are used for netball and tennis and are enclosed by 3m fencing and illuminated by 6 floodlights on 10m high masts. The site also includes a strip of playing field to the south of the courts and a section of the footpath to the north of the courts.
1.4The building itself would be a permanent structure comprising of a white tensile membrane roof supported by a wooden framework with metal bracing and steel sheet cladding to the lower level (4m). It would measure approximately 50m by 39m and would have a curved roof extending between 7m and 11m at its highest. It would accommodate three hard surfaced tennis courts with run back and side runs, meeting standards set by the Lawn Tennis Association. The white roof cover would allow optimal brightness during the day and internal lighting to allow for evening use. Access would be from the north west corner of the building, adjacent to the sports hall, and a short section of covered walkway would be provided along the existing path between the sports hall and existing artificial pitches.
RELEVANT HISTORY
12/03606/FULM - Outdoor sports facilities with floodlighting and associated access, parking and landscaping - Approved 22.02.2013
13/02399/NONMAT - Non-material amendment to approved application 12/03606/FULM to alter car and cycle parking, add vehicle track, extend all-weather pitch and reduce amount of proposed netball courts - Approved 16.08.2013
14/02836/FULM Construction of sports hall with associated changing, teaching and social facilities following demolition of pavilion - Approved 06.03.2015
15/02140/FUL Erection of equipment store and grounds keeping building -Approved 16.11.2015
18/01133/FULM Construction of a 3G sports pitch with associated lighting, fencing and viewing embankments – Approved 17.10.18
2.0POLICY CONTEXT
City of York Local Plan – Publication Draft February 2018
ED5 York St John University Further Expansion GI1 Green Infrastructure G15 Protection of Open Space and Playing Pitches HW3 Built Sports Facilities
City of York Draft Local Plan Incorporating the 4th set of changes – Development Control Local Plan. Approved April 2005
CYGP7 - Open Space
3.0CONSULTATIONS INTERNAL
Public Protection
3.1It is unlikely that the proposal will create additional noise to the existing use. Condition are proposed in connection with details of any machinery to be installed on the building.
Highway Network Management
3.2No objections but recommend a CEMP condition is attached
EXTERNAL
Yorkshire Water
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.