Named17 Sep 2026Executive Cabinet
Social Value Position Statement 25/26
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the report of the Director of Change and Delivery which provided a summary of the work undertaken by Chorley Council on Social Value during 2025- 26 and outlined progress, impact, and future direction for activity relating to social value.
Moved14 Jul 2026Council
Executive Cabinet
The Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the report, and it was resolved (unanimously) that the report be noted.
Seconded14 Jul 2026Council
Chorley Council Annual Performance Report 2025/26
The Deputy Leader, Councillor Peter Wilson proposed, and the Executive Leader, Councillor Alistair Bradley seconded, and it was resolved (unanimously) that the report be noted.
Named14 Jul 2026Council
Establish a budget following award of Local Authority Housing Funding to deliver Temporary Accommodation and resettlement properties and improvements to Cotswold House
The Leader, Councillor Alistair Bradley, noted that the funding related to providing housing for people and explained that the vote could not be split. Additionally, there was not an option for the council to ‘opt out’ of the Afghan Resettlement Programme. This approach allowed the council to satisfy the housing needs of residents once the Scheme ended.
Named14 Jul 2026Council
Establish a budget following award of Local Authority Housing Funding to deliver Temporary Accommodation and resettlement properties and improvements to Cotswold House
Councillor Alistair Bradley clarified that there were a number of schemes relating to Ukrainian refugees, including the Homes for Ukraine Scheme, which Councillor Mark Perks highlighted his own involvement in.
Named14 Jul 2026Council
To consider the Notices of Motion given in accordance with Council Procedure Rule 12
The Executive Leader, Councillor Alistair Bradley, proposed and Councillor Kim Snape proposed an amendment. The amendment was circulated via modern.gov just prior to the meeting.
Moved14 Jul 2026Council
To consider the Notices of Motion given in accordance with Council Procedure Rule 12
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded an amendment, and it was resolved (unanimously) 1. To request that the Chief Executive writes a formal letter to the Chief Executive of United Utilities on behalf of the council.
Moved14 Jul 2026Council
Council appointments
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was resolved (unanimously) 1.
Named9 Jul 2026Executive Cabinet
Gritting Procurement Strategy and Contract Award Delegation
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Property and Planning which sought approval for the procurement strategy and evaluation criteria for the winter gritting service.
Named11 Jun 2026Executive Cabinet
Washroom/Sanitary Bins Contract
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the report of the Director of Property and Planning which sought approval for the procurement strategy and subsequent delegation of the contract award for the washroom and sanitary bin contract.
Named11 Jun 2026Executive Cabinet
Janitorial and Sundry Products Contract
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the report of the Director of Property and Planning which sought pre-tender approval for the procurement strategy and subsequent delegation of the contract award for the janitorial and sundry products contract.
Named11 Jun 2026Executive Cabinet
Strategic Asset Disposal
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Property and Planning which outlined the outcome of the informal tender for the Council owned land at former Woodlands College, Southport Road, Chorley and sought approval to dispose of the site for residential development to the recommended preferred bidder.
Named19 May 2026Council
Executive Cabinet appointments for 2026/27
Councillor Alistair Bradley, Executive Leader informed the Council of his appointments to the Executive Cabinet for 2026/27.
Said19 May 2026Council
Executive Cabinet appointments for 2026/27
Councillor Bradley welcomed Councillor Whiffen as the new Executive Member for Homes and Housing. He noted a typographical error within the Planning and Development portfolio that the final bullet point should read Biodiversity Net Gain (BNG).
Moved19 May 2026Council
Appointments to committees, panels and working groups for 2026/27
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To approve the allocation of committee places in accordance with the Political Balance Rules as set out in the report.
Moved19 May 2026Council
Appointments to outside bodies for 2026/27
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that appointments to outside bodies be approved as set out in the report.
Named19 May 2026Council
Developing closer working between Chorley, South Ribble, and West Lancashire borough councils
The Executive Leader, Councillor Alistair Bradley, presented the report of the Head of People, Policy and Partnerships.
Moved19 May 2026Council
Developing closer working between Chorley, South Ribble, and West Lancashire borough councils
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To agree that the council work to develop closer relationships with the neighbouring borough councils of South Ribble and West Lancashire.
Moved14 Apr 2026Council
Executive Cabinet
The Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the report, and it was resolved (unanimously) that the report be noted.
Named14 Apr 2026Council
Central Lancashire Local Plan Examination Update and Next Steps
The Leader, Councillor Alistair Bradley, presented the report of the Director of Property and Planning.
Said14 Apr 2026Council
Central Lancashire Local Plan Examination Update and Next Steps
Cllr Bradley expressed the importance of maintaining momentum to avoid delays prior to final adoption of the local plan.
Moved14 Apr 2026Council
Central Lancashire Local Plan Examination Update and Next Steps
The Leader, Councillor Alistair Bradley proposed, and the Executive Member (Planning and Development), Councillor Alex Hilton seconded, and it was resolved (39:0:1):
Named19 Mar 2026Executive Cabinet
Utility Procurement - Gas Contract
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the report of the Director of Property and Planning which sought approval for the award of contract for the provision of gas following advice from Inspired Energy PLC, the councils appointed agent, and a compliant procurement process for the periods April 2026 - March 2027 for Chorley Borough Council.
Named19 Mar 2026Executive Cabinet
Brinscall Baths, Astley Community Centre & Eaves Green Community Centre - Public Sector Decarbonisation Scheme - Contract Award
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Property and Planning which sought approval for appointing a contractor to deliver Brinscall Baths, Astley Community Centre & Eaves Green Community Centre improvement and decarbonisation work.
Said18 Mar 2026Chorley Liaison
Update from Chorley Council: town of culture bid
Councillor Bradley noted there had a meeting of cultural operators across the borough for their input into the expression of interest.
Said18 Mar 2026Chorley Liaison
Item from Chorley Council: Digital skills update
Digital skills - Lancashire County Council and Calendar — UDevelop Councillor Bradley suggested the council could offer this type of initiative in ‘warm spaces’ if there was demand and sessions were held in council owned facilities, such as Tatton Gradens.
Said18 Mar 2026Chorley Liaison
Item from Chorley Council: Digital skills update
Demand for this had reduced and it was important not to duplicate provision Councillor Bradley explained that the County Combined Authority had funding to support training on coding skills. He had made been representations to the CCA about how this would be delivered, but had not had an update on the program. The update was noted.
Said18 Mar 2026Chorley Liaison
Item requested by Heath Charnock Parish Council - Local Government re-organisation update
Councillor Bradley noted there was no further update at this time. The consultation had started and had been focussed on key stakeholders. It was hoped there would be an update from the government around June.
Said18 Mar 2026Chorley Liaison
Item requested by Heath Charnock Parish Council - Local Government re-organisation update
Councillor Bradley advised he wasn’t aware of other organisations, such as health or the Police, had said they would change their footprints – these organisations already worked across different footprints. An item on LGR would be placed on the agenda for the next meeting.
Said18 Mar 2026Chorley Liaison
Questions from Members of the Liaison and the public
Councillor Bradley explained this was an issue in a number of areas across the borough, but that there was no time to do a boundary review as part of the LGR process. The importance of Town and Parish Councils was acknowledged moving forwards and that not not all areas of Chorley Borough were parished . The question and response were noted.
Seconded2 Mar 2026Council
Revenues Policy Review: Council Tax Discretionary Reductions Policy
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded, and it was Resolved (unanimously) To approve updating the Council Tax Discretionary Hardship Policy to award 100% reduction for Care Leaver’s council tax liability, with effect from 1 April 2026.
Named2 Mar 2026Council
Revenue Budget 2026/27 Medium Term Financial Strategy and Capital Programme 2026-2029
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley, seconded the recommendation.
Moved2 Mar 2026Council
Committee appointments
The Executive Leader, Councillor Alistair Bradley proposed, and the Deputy Leader, Councillor Peter Wilson seconded, and it was resolved (unanimously) To appoint Councillor Jean Sherwood to replace Councillor Ryan Towers on Overview and Scrutiny Committee.
Seconded2 Mar 2026Council
Polling Station Change for the Coppull Ward
The Deputy Leader, Councillor Peter Wilson proposed, and the Executive Leader, Councillor Alistair Bradley seconded, and it was resolved (unanimously) 1. To note the requirement for this short notice amendment and to endorse the reinstatement of Coppull Parish Church School as the polling station for the 7 May 2026 election.
Named27 Jan 2026Council
Public Questions
One public question was received from Jacob Ó Gallachóir and was asked of the Leader, Councillor Alistair Bradley.
Said27 Jan 2026Council
Public Questions
Can you explain how the Council's vote to request the Government postpone the May 2026 council elections is acceptable with regards to the Constitution of the Council, specifically where it states that "Three in every four years a Council election will take place" and "The Council will exercise all its powers and duties in accordance with the law and this Constitution"?" The Leader, Councillor Alistair Bradley responded to the question.
Said27 Jan 2026Council
Public Questions
A supplementary question was asked, “Given the council chose to request the government postpone the elections when it was asked if it wanted to, would you agree that that it is agreeing with the council exercising its power and duties in accordance with the constitution with elections every four years?” Councillor Bradley responded “The item was not relating to constitution; it was about the best way forward as part of a reorganisation process, based on precedence of previous areas which had gone through reorganisation, which have had their elections delayed. This included Buckinghamshire and North Yorkshire.
Moved27 Jan 2026Council
Executive Cabinet
The Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the report, and it was resolved (unanimously) that the report be noted.
Seconded27 Jan 2026Council
Polling Station Review
The Deputy Leader, Councillor Peter Wilson proposed, and the Executive Leader, Councillor Alistair Bradley seconded, and it was resolved (unanimously) 1. To approve no change to the polling station from St Barnabas Church, Chapel Lane, Heapey for the residents of Ryecroft and Ryefields in the Chorley North East ward.
Named22 Jan 2026Executive Cabinet
Water Supply Contract - Contract Award
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform presented the report of the Director of Property and Planning which sought approval to award a five-year contract for water and wastewater services for all Chorley Council operational properties to Water Plus, following competitive tender process.
Named22 Jan 2026Executive Cabinet
Town Hall Improvement Works - Contract Award
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform presented the confidential report of the Director of Property and Planning which sought approval to appoint a contractor and consultants to deliver the Chorley Town Hall improvement and decarbonisation works.
Named11 Dec 2025Executive Cabinet
Astley Hall West Wing Renovations - Contractor Appointment
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform presented the report of the Director of Property and Planning which detailed the procurement process undertaken to select a contractor for the Astley Hall West Wing renovations and sought approval for the award of contract.
Named4 Dec 2025Overview and Scrutiny Performance Panel
Chorley Quarter Two Performance Monitoring Report 2025-26
Councillor Bradley, Executive Member for Economic Development and Public Service Reform, was asked about the strategy for increasing the median workplace earnings for jobs in Chorley given performance is below the North West average. He explained that it is difficult because the borough has a lot of small to medium sized businesses which don’t offer higher salary roles, and those larger employers tend to be manufacturing or service/hospitality sector jobs. The Council is doing a lot of work around upskilling and where possible creating more technical jobs, for example the Strawberry Fields site was designed to attract tech businesses that require higher level skills and offer higher wages .
Named27 Nov 2025Executive Cabinet
Local Government Reorganisation - Proposal Submission Decision
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform presented the report of the Chief Executive which enabled Executive Cabinet to make a formal decision on the submission of the proposals for a four unitary Lancashire.
Named18 Nov 2025Council
Local Government Reorganisation Proposal
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive. The report set out the options developed for local government structures in Lancashire, ranging from two to five unitary councils. The council had worked with five other Lancashire councils to develop a proposal for a four unitary Lancashire.
Moved18 Nov 2025Council
Local Government Reorganisation Proposal
The Leader, Councillor Alistair Bradley proposed, and the Deputy Leader, Councillor Peter Wilson seconded the recommendation within the report.
Moved18 Nov 2025Council
To consider the Notices of Motion given in accordance with Council Procedure Rule 12
Grey belt land Councillor Craige Southern proposed, and Councillor Alan Platt seconded the Notice of Motion The Leader, Councillor Alistair Bradley proposed, and the Executive Member (Planning and Development), Councillor Alex Hilton seconded an amendment.
Named18 Nov 2025Council
Request to authorise and extend Councillor Topp’s absence from meetings of the Council
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive.
Moved18 Nov 2025Council
Request to authorise and extend Councillor Topp’s absence from meetings of the Council
The Executive Leader, Councillor Alistair Bradley proposed and the Leader of the Opposition, Councillor Alan Platt seconded and it was Resolved (unanimously) To approve an extension of three months (until 18 February 2026) for Councillor Topp to allow them to continue to serve as an elected member on Chorley Council whilst recovering from a period of ill health.
Moved23 Sep 2025Council
Executive Cabinet
The Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the report, and it was resolved (unanimously) that the report be noted.
Named23 Sep 2025Council
Houses in Multiple Occupation (HMOs) Article 4 Direction
A request was made by Councillor Alistair Bradley under the Council Procedure Rule 18.4 for a recorded vote.
Moved23 Sep 2025Council
To consider the Notices of Motion given in accordance with Council Procedure Rule 10
The Executive Leader, Councillor Alistair Bradley proposed a Notice of Motion. Councillors Peter Wilson, Aidy Riggott, Chris Snow, Mark Clifford, Ryan Towers, Alan Platt, Jenny Whiffen and Jean Sherwood all spoke in support. Concerns were raised about the impact on the environment, the need for residents to be reassured and a future debate on this issue at Lancashire County Council.
Moved23 Sep 2025Council
To consider the Notices of Motion given in accordance with Council Procedure Rule 10
The Executive Leader, Councillor Alistair Bradley proposed, and the Deputy Leader, Councillor Peter Wilson seconded the Notice of Motion.
Moved23 Sep 2025Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act 1972.
Named23 Sep 2025Council
Yarrow Bridge Depot - Budget Approval
The Executive Leader, Councillor Alistair Bradley, presented the confidential report of the Director (Property and Planning). The report updated members on the progress update on the Yarrow Bridge Depot (Refuse Collection Vehicle (RCV)) project and delivery programme and sought approval for the budget to deliver the capital scheme.
Moved23 Sep 2025Council
Yarrow Bridge Depot - Budget Approval
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) 1. To note the rationale for project delivery and the roll out of the new food waste collection programme as mandated by central government.
Seconded23 Sep 2025Council
Proposed Debt Write Off
The Deputy Leader, Councillor Peter Wilson proposed, and the Executive Leader, Councillor Alistair Bradley seconded, and it was resolved (unanimously) 1. To approve the write off of debt in relation to Unit 7 as detailed in the report.
Named18 Sep 2025Executive Cabinet
Corporate Peer Challenge Action Plan
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the report of the Director of Change and Delivery which presented the Corporate Peer Challenge Action Plan.
Moved15 Jul 2025Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Executive Leader, Councillor Peter Wilson seconded the report, and it was resolved (unanimously) that the report be noted.
Moved15 Jul 2025Council
Committee appointments
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1.
Seconded15 Jul 2025Council
Chorley Council Annual Performance Report 2024/25
The Deputy Leader, Councillor Peter Wilson proposed, and the Executive Leader, Councillor Alistair Bradley seconded, and it was resolved (unanimously) that the report be noted.
Moved15 Jul 2025Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act 1972.
Named10 Jul 2025Executive Cabinet
Corporate Peer Challenge Feedback Report
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the report of the Director of Change and Delivery which presented the feedback report and recommendations from the Local Government Association (LGA) Corporate Peer Challenge.
Named10 Jul 2025Executive Cabinet
Disposal Strategy for Council Land at Southport Road (Former Woodlands Conference Centre)
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform presented the confidential report of the Director of Planning and Property which sought approval of the disposal strategy for a portion of land at Southport Road for housing development via an informal tender process.
Named12 Jun 2025Executive Cabinet
Shady Lane - Disposal
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Property and Planning which outlined the outcome of the informal tender for the Council owned land at Shady Lane, Clayton-le-Woods and sought approval to dispose of the site for residential development to the recommended preferred bidder.
Named12 Jun 2025Executive Cabinet
Security and Concierge contract
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Property and Planning which sought approval for the procurement strategy and subsequent delegation
Named12 Jun 2025Executive Cabinet
Proposed procurement arrangements for the supply, installation, servicing and maintenance of stairlifts funded by Disabled Facilities Grant (DFG)
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Communities and Leisure on behalf of the Executive Member for Homes and Housing.
Named9 Jun 2025Central Lancashire Strategic Planning Joint Advisory Committee
Appointment of Chair for the Meeting
Resolved - That Councillor Alistair Bradley be appointed as Chair for the meeting.
Named20 May 2025Planning Committee
21/00270/FULMAJ - Babylon Lane, Heath Charnock
Public speakers: Sue Slamon (Objector), Councillor Graham Ashworth (Parish Councillor), Councillor Alistair Bradley (Ward Councillor) and Louise Leyland (Agent).
Seconded13 May 2025Council
Election of the Deputy Mayor for the council year 2025/26
It was proposed by Councillor Alan Platt, and seconded by Councillor Alistair Bradley, that Councillor Debra Platt be elected as Deputy Mayor of the Borough of Chorley for the forthcoming Council Year.
Named13 May 2025Council
Executive Cabinet appointments for 2025/26
Councillor Alistair Bradley, Executive Leader informed the Council of his appointments to the Executive Cabinet for 2025/26.
Moved13 May 2025Council
Executive Cabinet appointments for 2025/26
Armed Forces and Member Services Neville Whittam Older People Dedrah Moss Rural Communities & Parishes Alan Whittaker Young People Sarah Ainsworth Strategic Development and Planning Chris Snow Mental Health Awareness Michelle Beach The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To note the Executive Cabinet appointments.
Moved13 May 2025Council
Appointments to committees, panels and working groups for 2025/26
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To approve the allocation of committee places in accordance with the Political Balance Rules as set out in the report.
Moved13 May 2025Council
Appointments to outside bodies for 2025/26
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that appointments to outside bodies be approved as follows:
Named13 May 2025Council
Appointments to outside bodies for 2025/26
Name of Body No of Reps Representatives Expiry Date 1 District Councils’ Network 1 Executive Leader (Councillor Alistair Bradley) May 2026 2 Local Government Association (Lancashire Branch) 1 Executive Leader (Councillor Alistair Bradley) May 2026 3 Lancashire District Leaders Forum 1 Executive Leader (Councillor Alistair Bradley) May 2026 4 Rural Services Network 1 Executive Member / Rural champion (Councillor Alan Whittaker) May 2026 General appointments No.
Named13 May 2025Council
Constitution Review
The Executive Leader, Councillor Alistair Bradley, presented the report of the Interim Monitoring Officer which presented an updated Council Constitution for approval. There had been significant changes within the council through the extension of shared services and staffing as well as changes to national legislation and responsibilities on Councils. These had been incorporated, but had been done as they arise which meant the constitution became fragmented and harder to follow.
Moved13 May 2025Council
Constitution Review
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To approve the updated Constitution at Appendix 1.
Named15 Apr 2025Council
Mayoral Announcements
Councillor Chris Snow and the Leader of the Council, Councillor Alistair Bradley also paid tribute.
Moved15 Apr 2025Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Executive Leader, Councillor Peter Wilson seconded the report, and it was resolved (unanimously) that the report be noted.
Said15 Apr 2025Council
Members Allowances - Appointment of Independent Remuneration Panel
The Executive Leader, Councillor Alistair Bradley presented the report of the Director of Governance which sought approval to appoint Simon Clark to the Independent Remuneration Panel for a period of three years.
Moved15 Apr 2025Council
Members Allowances - Appointment of Independent Remuneration Panel
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Executive Leader, Councillor Peter Wilson seconded the report’s recommendation, and it was resolved (unanimously):
Named27 Feb 2025Council
Mayoral Announcements
Members, including the Leader of the Council, Councillor Alistair Bradley, Deputy Leader, Councillor Peter Wilson, Leader of the Opposition, Councillor Alan Platt, Councillors Debra Platt and Pauline McGovern joined the Mayor in thanking Chris for his service.
Named27 Feb 2025Council
Revenue Budget 2025/26, Medium Term Financial Strategy and Capital Programme 2025-2028
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley, seconded the recommendation.
Named27 Feb 2025Council
Local Government Reorganisation and Devolution
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive which provided full council with an update on the emerging process for local government reorganisation.
Moved27 Feb 2025Council
Local Government Reorganisation and Devolution
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. Note the likely process for the development of proposals for local government reorganisation.
Named27 Feb 2025Council
Request to authorise and extend Councillor Martin’s absence from meetings of the Council
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive.
Moved27 Feb 2025Council
Request to authorise and extend Councillor Martin’s absence from meetings of the Council
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) To approve an extension of three months for Councillor Martin to allow them to continue to serve as an elected member on Chorley Council whilst recovering from a period of ill health.
Moved27 Feb 2025Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act 1972.
Moved28 Jan 2025Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that the report be noted.
Named28 Jan 2025Council
Central Lancashire Local Plan 2023-2041 Publication Version (Regulation 19) Consultation
The Executive Leader, Councillor Alistair Bradley, presented the report of the Director of Planning and Property and thanked the officers involved in its production.
Said28 Jan 2025Council
Central Lancashire Local Plan 2023-2041 Publication Version (Regulation 19) Consultation
In response to a query regarding the calculation for school places Councillor Bradley explained this sat with Lancashire County Council as the Education Authority.
Moved28 Jan 2025Council
Central Lancashire Local Plan 2023-2041 Publication Version (Regulation 19) Consultation
The Executive Leader, Councillor Alistair Bradley proposed, Executive Member Planning and Development, Councillor Alistair Morwood, seconded, and it was Resolved (unanimously) 1. To approve the Central Lancashire Local Plan 2023-2041 Publication Version (Regulation 19), as set out at Appendix One to the report, be published for a minimum of six-week period of public consultation, along with the Publication Policies Map Publication Version (appendices ten to thirty-three), the Integrated Assessment (Appendix two, which includes the required Sustainability Appraisal) and the supporting documents as listed in Appendix nine.
Seconded28 Jan 2025Council
Adoption of Model Procedures
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded, and it was Resolved (unanimously) 1. To adopt the model procedures for dealing with grievance procedures and disciplinary action as set out in the Joint Negotiating Committee for Local Authority Chief Executives Conditions of Service and the Joint Negotiating Committee Chief Officer Conditions of Service.
Named28 Jan 2025Council
Review of Members' Allowances Scheme
The Executive Leader, Councillor Alistair Bradley, presented the report which set out the recommendations of the Independent Remuneration Panel to the Council in relation to Members’ Allowances.
Moved28 Jan 2025Council
Review of Members' Allowances Scheme
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To note the review of the Members’ Allowances Scheme be.
Named23 Jan 2025Executive Cabinet
Chorley Town Hall Improvement Works – Procurement Strategy
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform presented the confidential report of the Director of Property and Planning. The report sought approval of the procurement strategy to procure a contractor to undertake Chorley Town Hall improvement works.
Named12 Dec 2024Executive Cabinet
Christmas Lights Procurement Strategy and Contract Award Delegation
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Planning and Property which sought approval of the procurement strategy and contract award for the Town Centre Christmas lights.
Said12 Dec 2024Executive Cabinet
Any urgent business previously agreed with the Chair
Councillor Alistair Bradley advised that Louise Mattinson, Director of Finance was retiring at the end of the year, and this was therefore her last meeting of the Executive Cabinet. Members thanked her for all her hard work during her time at the council and wished her a happy retirement.
Seconded19 Nov 2024Council
Corporate Strategy 2024/25
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (unanimously) That the Corporate Strategy 2024/2025 be approved.
Seconded19 Nov 2024Council
Polling Place Review - Results of Consultation
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (unanimously) To approve that most polling stations across the borough remain unchanged, except for St James’ CE Primary school (Chorley East Ward) being moved to Tatton Community Centre, and Coppull Parish CE Primary School (Coppull Ward) being moved to Coppull Village Hall. This would allow both schools to operate without disruption on polling day.
Named14 Nov 2024Executive Cabinet
Disposal Strategy for Council Land at Shady Lane, Clayton-le-Woods
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Planning and Property which sought approval of the disposal strategy for land at Shady Lane for housing development via an informal tender process.
Named14 Nov 2024Executive Cabinet
Chorley Bus Station - Contract Award
Councillor Alistair Bradley, Executive Leader and Executive Member for Economic Development and Public Service Reform, presented the confidential report of the Director of Planning and Property which, following the approval of the procurement strategy to undertake the Chorley Bus Station improvements, sought approval to award the contracts for the living wall and external cladding at the bus station.
Named15 Oct 2024Planning Committee
24/00557/FUL - 2 Heath Paddock, Hut Lane, Heath Charnock
Public Speaker: Jason Smalley (Supporter), Councillor Alistair Bradley (Ward Councillor) and Patty Linfoot (Applicant).
Named10 Oct 2024Executive Cabinet
2024/25 Corporate Budget Monitoring Report and Reserves for the 4 months to 31st July 2024
The Executive Leader and Executive Member (Economic Development and Public Service Reform), Councillor Alistair Bradley, presented the report of the Director of Finance which set out the provisional outturn for revenue and reserves forecast for 2024/25 for the Council, based on the position as at 31 July 2024.
Named10 Oct 2024Executive Cabinet
2024/25 Corporate Capital Programme and Balance Sheet Monitoring Report Outturn Position for the four months to the 31st July 2024
The Executive Leader and Executive Member (Economic Development and Public Service Reform), Councillor Alistair Bradley, presented the report of the Director of Finance. The purpose of the report was to set out the outturn financial position of the Council in respect of the capital programme at 31 July 2024, highlighting key issues and explaining key variances, and to provide an overview of various elements of the Council’s Balance Sheet at 31 July 2024. The total cost of the Council’s capital investment programme for 2024/25 had increased since the 2023/24 outturn report approved by Executive Cabinet, from £15,253m to £16.152m as at 31 July 2024.
Named10 Oct 2024Executive Cabinet
Chorley Quarter One Performance Monitoring Report 2024-25
The Executive Leader and Executive Member (Economic Development and Public Service Reform), Councillor Alistair Bradley, presented the report of the Director of Change and Delivery which set out the performance against the delivery of the Corporate Strategy during the first quarter of 2024/25, covering 1 April 2024 to 30 June 2024.
Named10 Oct 2024Executive Cabinet
Procurement of Statutory Compliance, Maintenance and Minor Works Framework
The Executive Leader and Executive Member (Economic Development and Public Service Reform), Councillor Alistair Bradley, presented the confidential report of the Director of Planning and Property. The report requested procurement strategy approval for a statutory compliance, maintenance and minor works framework shared with Chorley Leisure, South Ribble Borough Council and South Ribble Leisure covering the servicing, maintenance and minor works across Chorley and South Ribble’s estates.
Named9 Oct 2024Shared Services Appointments Panel
Appointment of Chairperson
It was proposed and seconded that Councillor Alistair Bradley be appointed as Chairperson.
Moved17 Sep 2024Council
To consider the Notices of Motion given in accordance with Council procedure Rule 10
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded an amendment, and it was Resolved (unanimously) This council notes the Labour government’s recent decision to restrict the Winter Fuel Allowance only to pensioners in receipt of means-tested benefits such as Pension Credit, as announced recently by Chancellor Rachel Reeves. Chorley Council recognises that this decision was taken as part of measures to tackle the £22bn ‘black hole’ in the public finances left by the previous Conservative government.
Named16 Jul 2024Council
Mayoral Announcements
The Mayor congratulated the Executive Leader, Councillor Alistair Bradley on being awarded an MBE for Political and Public Services in the King’s Birthday Honours List last month.
Moved16 Jul 2024Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that the report be noted.
Seconded16 Jul 2024Council
Chorley Council Annual Performance Report 2023/24
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (unanimously) That the report be noted.
Said16 Jul 2024Council
Food Waste Collections
The Executive Leader, Councillor Alistair Bradley noted the wish to work in partnership with other local authorities on the procurement of these, where possible.
Seconded16 Jul 2024Council
Food Waste Collections
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (unanimously) Approval for a capital budget of £1,556,116 to purchase food waste collection vehicles and food waste containers, subject to additional Government funding being received.
Moved16 Jul 2024Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act 1972.
Named16 Jul 2024Council
Levelling Up Fund - Budget Approval
The Executive Leader, Councillor Alistair Bradley, presented the confidential report of the Director of Planning and Property.
Said16 Jul 2024Council
Levelling Up Fund - Budget Approval
The Leader of the Opposition, Councillor Alan Platt, queried the need for additional housing in this area, but Councillor Bradley explained the desire to build within the town centre rather than on greenbelt. The rate of private sector building in the town centre also supported the demand for homes in this area. The operation of the properties would be considered by the Development and Assets Working Group.
Moved16 Jul 2024Council
Levelling Up Fund - Budget Approval
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. The progress of the Levelling Up, Town Centre Improvements and Civic Square Project be noted.
Said13 Jun 2024Executive Cabinet
Revenue Budget Outturn 2023/24
Councillor Bradley noted that many Lancashire Districts were also experiencing financial challenges, with some debts being one off in nature, and being required to be dealt with in the accounts.
Named12 Jun 2024Shared Services Joint Committee
Election of Chair and Vice-Chair
Councillor Alistair Bradley was appointed as Chair.
Seconded14 May 2024Council
Election of the Deputy Mayor for the council year 2024/25
It was proposed by Councillor Jean Sherwood, and seconded by Councillor Alistair Bradley, that Councillor Alistair Morwood be elected as Deputy Mayor of the Borough of Chorley for the forthcoming Council Year.
Named14 May 2024Council
Appointment of the Executive Leader of the Council
It was proposed by Councillor Peter Wilson, and seconded by Councillor Bev Murray and Resolved (unanimously) to approve that Councillor Alistair Bradley be appointed as Executive Leader to the Council for a four year term.
Named14 May 2024Council
Executive Cabinet appointments for 2024/25
Councillor Alistair Bradley, Executive Leader informed the Council of his appointments to the Executive Cabinet for 2024/25. Appointments to the Executive Cabinet and portfolio support roles were reported as follows:
Moved14 May 2024Council
Appointments to committees, panels and working groups for 2024/25
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. The allocation of committee places in accordance with the Political Balance Rules as set out in the report be approved.
Moved14 May 2024Council
Appointments to outside bodies for 2024/25
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that appointments to outside bodies be approved as follows:
Named14 May 2024Council
Appointments to outside bodies for 2024/25
Name of Body No of Reps Representatives Expiry Date 1 District Councils’ Network 1 Executive Leader (Councillor Alistair Bradley) May 2025 2 Lancashire Police and Crime Panel 1 Executive Leader / Executive Member (Councillor Alistair Bradley) May 2025 3 Local Government Association (Lancashire Branch) 1 Executive Leader (Councillor Alistair Bradley) May 2025 4 Rural Services Network 1 Executive Member / Rural champion (Councillor Alan Whittaker) May 2025 General appointments No.
Moved14 May 2024Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act 1972.
Seconded14 May 2024Council
Gillet Field Playing Pitch Enhancement
The Executive Member (Planning and Development), Councillor Alistair Morwood proposed and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (37:0:1) 1. Approve the allocation of a further budget for the delivery of the new pavilion, ancillary facilities and improved playing pitches at Gillett Playing Fields.
Named16 Apr 2024Council
Silence
The Leader of the Council, Councillor Alistair Bradley and the Deputy Leader of the Opposition, Councillor Alan Platt, paid tribute and sent their condolences to the family.
Named16 Apr 2024Council
Mayoral Announcements
The Mayor advised he had visited London in March with Councillor Bradley to attend the Your UK Parliament Week Awards at the House of Commons, where Chorley was announced the winner of the Constituency of the Year Award.
Moved16 Apr 2024Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that the report be noted.
Moved16 Apr 2024Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act 1972.
Seconded16 Apr 2024Council
Birkacre Reservoir Embankment Repairs - Budget Approval
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (unanimously) 1. To approve procurement exercise to undertake a competitive tender for essential reservoir embankment work through the open Chest portal in accordance with procurement procedures and to appoint the successful contractor.
Named21 Mar 2024Executive Cabinet
Deputy Monitoring Officer
The Executive Leader, Councillor Alistair Bradley, reminded members that this would be the last Executive Cabinet meeting for Dave Whelan, as he was due to retire the following month and thanked him for his service to the council.
Named21 Mar 2024Executive Cabinet
Procurement Strategy - Levelling Up Fund
The Executive Leader, and Executive Member for Economic Development and Public Service Reform Councillor Alistair Bradley, presented the report of the Director of Planning and Property. Following a bid submission in June 2022, the Council was successful in securing £20m from the Government’s Levelling Up fund (third round) for the regeneration of Chorley Town Centre. Full details were awaited from the government, however, the report set out the detailed procurement strategy which would support the delivery of the Levelling Up Fund projects.
Said21 Mar 2024Executive Cabinet
Water Safety Policy update
Councillor Bradley noted the Overview and Scrutiny Committee had received a presentation regarding water safety the previous week and noted the importance of this issue.
Named7 Mar 2024Overview and Scrutiny Performance Panel
Performance Focus: Planning and Property
The Executive Member for Planning, Councillor Alistair Morwood, and the Executive Member for Economic Development and Public Sector Reform, Councillor Alistair Bradley, presented a report providing a performance update for the Planning and Property Update which included:
Said7 Mar 2024Overview and Scrutiny Performance Panel
Performance Focus: Planning and Property
Councillor Bradley addressed the performance indicators in respect of property services. It was noted that there was an 80% overspend. He indicated that the council was still catching up on repairs and maintenance on properties dating back to COVID.
Said7 Mar 2024Overview and Scrutiny Performance Panel
Performance Focus: Planning and Property
Councillor Bradley informed the Committee that he did not expect the significant overspend to be recurrent in future years as it was largely due to factors such as outstanding property repairs and utility costs (which are expected to be lower in subsequent years). As regards bad debt provision, he explained that some businesses had built up bed debts during COVID and were still trying to get back on track. The Council’s approach was to take long term view to encourage businesses to stay in the town centre.
Named7 Mar 2024Overview and Scrutiny Performance Panel
Chorley Quarter Three Performance Monitoring Report 2023/24
The Executive Member for Resources, Councillor Peter Wilson, and Councillor Alistair Bradley, Executive Member for Economic Development and Public Sector Reform, presented a report setting out the performance against the delivery of the Corporate Strategy and key performance indicators during the third quarter of 2023/24, covering 1 October 2023 – 31 December 2023.
Named27 Feb 2024Council
Silence
The Leader of the Opposition, Councillor Alan Cullens, the Leader of the Council, Councillor Alistair Bradley and Councillor Alan Whittaker paid tribute and sent their condolences to the family.
Named22 Feb 2024Executive Cabinet
Deliver Improvements to Local Service Centres
Councillor Alistair Bradley, Executive Leader, and Executive Member for Economic Development and Public Service Reform presented the report of the Director of Planning and Property which set out to determine the most appropriate way to spend the allocated UK Shared Prosperity Funding (UKSPF) in order to achieve a commitment made by members regarding improvements to local service centres.
Moved30 Jan 2024Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that the report be noted.
Named25 Jan 2024Overview and Scrutiny Committee
Town Centre Action Plan Update
Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented a report providing an overview of the matters related to anti-social behaviour (ASB) in connection with Chorley Town Centre.
Named25 Jan 2024Overview and Scrutiny Committee
Town Centre Action Plan Update - Appendix
Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented the appendix to the report.
Named17 Jan 2024Council
Lancashire Devolution Deal
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive which presented a summary of the proposals to create a combined county authority (CCA) and a devolution deal for Lancashire, and to agree the principles of a response to the consultation.
Said17 Jan 2024Council
Lancashire Devolution Deal
Councillor Bradley expressed his disappointment by the need for this extraordinary meeting of the Council. He personally had done a great deal of work to progress devolution in Lancashire, and so was disappointed not to be able to support the current proposals.
Named17 Jan 2024Council
Lancashire Devolution Deal
The proposals were now the subject of a consultation, and Councillor Bradley encouraged all members and residents to participate in the consultation process.
Named17 Jan 2024Council
Lancashire Devolution Deal
Councillor Bradley detailed the proposals which were set out within the report. The proposed consultation response from the Council was also detailed within the report.
Named9 Jan 2024Shared Services Joint Committee
Welcome and apologies for absence
Councillor Bradley (Vice-Chair) took the chair.
Said9 Jan 2024Shared Services Joint Committee
Welcome and apologies for absence
Councillor Alistair Bradley welcomed everyone to the meeting and introduced Caroline Wolfenden, recently appointed Director of Change and Delivery and Christine Wood, Temporary Democratic and Member Services Officer who would be covering for Nina Neisser-Burke who would shortly be going on maternity leave.
Named9 Jan 2024Shared Services Joint Committee
Welcome and apologies for absence
Councillor Bradley and the Committee expressed best wishes to Nina. Apologies for absence were received from Councillors Matthew Tomlinson (Chair) and Michelle Brown.
Named23 Nov 2023Overview and Scrutiny Performance Panel
Business Plan Update 2023/24
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform and Councillor Peter Wilson, Executive Member for Resources presented a report providing an update on the delivery of service level projects outlined in the business plans.
Said23 Nov 2023Overview and Scrutiny Performance Panel
Business Plan Update 2023/24
Councillor Bradley highlighted that of the total 81 projects:
Said23 Nov 2023Overview and Scrutiny Performance Panel
Business Plan Update 2023/24
· 54 were rated as Green (67%) · 10 were considered Completed (12%) · 16 were rated as Amber (20%) · 1 was rated as Red (1%) Councillor Bradley explained that the project rated red was in relation to the finance system project, which had been delayed for the reasons explained in paragraph 14, i.e. to ensure a stable environment before proceeding with the purchase of a new system.
Named23 Nov 2023Overview and Scrutiny Performance Panel
Performance Focus - Policy and Governance
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform and Councillor Peter Wilson, Executive Member for Resources presented a report providing a performance update for the Policy and Governance Directorate.
Said23 Nov 2023Overview and Scrutiny Performance Panel
Performance Focus - Policy and Governance
Councillor Bradley agreed that the figure needed to be investigated further, and if accurate to identify the reasons.
Said23 Nov 2023Overview and Scrutiny Performance Panel
Performance Focus - Policy and Governance
- Corporate projects – Improve our Council buildings – Councillor Bradley explained the delays were related to the decarbonisation scheme and the need to meet government criteria which was very strict.
Named23 Nov 2023Overview and Scrutiny Performance Panel
Performance Focus - Policy and Governance
- Digital connectivity in rural areas - Rural England Prosperity Fund grants – Cllr Bradley indicated that the take up had been very good.
Named23 Nov 2023Overview and Scrutiny Performance Panel
Performance Focus - Policy and Governance
- Council business networking / events – Councillor Bradley indicated we are now taking a different approach – it is working well but there is more we can do.
Said21 Nov 2023Council
Review of Members' Allowances Scheme 2023
The Executive Leader, Councillor Alistair Bradley presented the report of the Director of Governance.
Moved21 Nov 2023Council
Review of Members' Allowances Scheme 2023
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (40:0:1) 1. To add a new role within the Members Allowances Scheme ‘Deputy Portfolio Holder’ with a payment of £1,619.96.
Moved21 Nov 2023Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act.
Said21 Nov 2023Council
Woodlands Site
The Executive Leader, Councillor Alistair Bradley presented the confidential report of the Deputy Chief Executive. The reasons for the decision and aspirations were presented. Members noted the proposed timescales and risks relating to the decision.
Moved21 Nov 2023Council
Woodlands Site
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (35:4:1) To approve the recommendations set out in the tabled resolution.
Named14 Nov 2023Planning Committee
23/00510/OUTMAJ - Babylon Lane, Heath Charnock
Public speakers: Sue Slamon (Objector), Andre Baron (Supporter), Graham Ashworth (Parish Councillor), Councillor Alistair Bradley (Ward Councillor), Councillor Kim Snape (Ward Councillor), and Louise Leyland (Agent).
Moved19 Sep 2023Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that the report be noted.
Seconded19 Sep 2023Council
Polling station relocation
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded, and it was Resolved (unanimously) That polling station 31 which related to polling district CHN&A04 currently hosted at St Peter’s CE Primary School, Eaves Lane, Chorley be relocated to St Joseph’s Parish Centre, Harpers Lane, Chorley.
Said19 Sep 2023Council
Members Allowances - Appointment of Independent Remuneration Panel
The Executive Leader, Councillor Alistair Bradley presented the report of the Director of Governance.
Moved19 Sep 2023Council
Members Allowances - Appointment of Independent Remuneration Panel
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To appoint • Lorraine Norris, former Chief Executive of Preston City Council • Phil Davies, former Elections Manager at Chorley Council • Diane Gradwell, Chief Executive Officer, Citizens Advice Lancashire West as members of the Independent Remuneration Panel for a period of three years.
Said19 Sep 2023Council
Change of Working Group Name and Updated Terms of Reference
The Executive Leader, Councillor Alistair Bradley presented the report of the Chief Executive.
Moved19 Sep 2023Council
Change of Working Group Name and Updated Terms of Reference
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To approve the change of name of the Wholly Owned Company and Projects Working Group, to the Development and Assets Working Group.
Moved19 Sep 2023Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act.
Said19 Sep 2023Council
Plan Making
The Executive Leader, Councillor Alistair Bradley presented the confidential report of the Chief Executive.
Moved19 Sep 2023Council
Plan Making
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. The Council reaffirms the commitment to the Central Lancashire Local Plan and to having a new Local Plan.
Named18 Jul 2023Council
Minute's silence
The Leader of the Opposition, Councillor Alan Cullens, the Leader of the Council, Councillor Alistair Bradley and Councillors Alistair Morwood and Craige Southern paid tribute and sent their condolences to the family.
Moved18 Jul 2023Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that the report be noted.
Named18 Jul 2023Council
Chorley Council Annual Performance Report 2022/23
On behalf of the Council, the Executive Leader, Councillor Alistair Bradley, thanked Vicky Willett, Director of Change and Delivery, for her hard work and commitment to the Council, and wished her all the best in her new role.
Said18 Jul 2023Council
Chorley Council Annual Performance Report 2022/23
The Executive Leader, Councillor Alistair Bradley presented the Council’s Annual Report which summarised the council’s achievements during 2022/23.
Said18 Jul 2023Council
Chorley UKSPF Programme
The Executive Leader, Councillor Alistair Bradley presented the report of the Director (Change and Delivery). The report provided members with an overview of the UK Shared Prosperity Fund (UKSPF) framework for Chorley Council.
Moved18 Jul 2023Council
Chorley UKSPF Programme
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To approve the UK Shared Prosperity Fund Delivery Framework for Chorley, in order to progress delivery of the fund, and to begin commissioning of the programmes within it.
Moved18 Jul 2023Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act.
Said18 Jul 2023Council
Grant of a Lease - Offices 33a 34 35 36 37 Strawberry Fields Digital Office Park
The Executive Leader, Councillor Alistair Bradley presented the confidential report of the Chief Executive.
Moved18 Jul 2023Council
Grant of a Lease - Offices 33a 34 35 36 37 Strawberry Fields Digital Office Park
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To accept the terms and approve the issue of a 12-year lease to Panache Cruises.
Seconded18 Jul 2023Council
Grant of a lease - Unit 4b/5 Market Walk Extension, Market Walk
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded, and it was Resolved (unanimously) 1. To approve the terms and grant authority to issue instructions to the Director of Governance to complete the Lease to the CFH (North West) Limited, subject to:
Moved18 Jul 2023Council
Queens Road Car Park - Enhancement Works
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To vire a budget of £321,000 from the existing, approved, Public Realm Town Centre capital budget to the Queens Road car park enhancement scheme.
Said18 Jul 2023Council
Asset Acquisition in Chorley Town Centre
In response to a query from the Leader of the Opposition, Councillor Alan Cullens, queried Councillor Bradley confirmed a condition survey had been undertaken and not that the building was not complex in design. Risks associated with the proposals had been considered.
Moved18 Jul 2023Council
Asset Acquisition in Chorley Town Centre
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (by majority 35:3:1) 1. To approve the transfer of Chorley Bus Station and its associated staffing and operation from Lancashire County Council to Chorley Council.
Moved18 Jul 2023Council
Relocation of the Bengal Street depot - budget and progress update
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To approve an overall capital budget of £3,750,000 to re-locate the Bengal Street depot to the Common Bank Industrial Estate site.
Moved18 Jul 2023Council
Tatton Gardens - Project Completion Report
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1. To approve the increase of the capital budget by £980,000 to £17,130,000 covering the contractor’s claim and additional fees incurred throughout the negotiation process.
Named16 May 2023Council
Executive Cabinet appointments for 2023/24
Councillor Alistair Bradley, Executive Leader informed the Council of his appointments to the Executive Cabinet for 2023/24.
Moved16 May 2023Council
Appointments to committees, panels and working groups for 2023/24
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) 1.The allocation of committee places in accordance with the Political Balance Rules set out in the report be approved.
Moved16 May 2023Council
Appointments to outside bodies for 2023/24
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that appointments to outside bodies be approved as follows:
Named16 May 2023Council
Appointments to outside bodies for 2023/24
Name of Body No of Reps Representatives Expiry Date 1 District Councils’ Network 1 Executive Leader (Councillor Alistair Bradley) May 2024 2 Lancashire Police and Crime Panel 1 Executive Leader / Executive Member (Councillor Alistair Bradley) May 2024 3 Local Government Association (Lancashire Branch) 1 Executive Leader (Councillor Alistair Bradley) May 2024 4 Rural Services Network 1 Executive Member / Rural champion (Councillor Alan Whittaker) May 2024 General appointments No.
Seconded16 May 2023Council
Household Support Fund Phase 4 Delivery
The Executive Member (Early Intervention), Councillor Bev Murray proposed and the Executive Leader, Councillor Alistair Bradley seconded, and it was Resolved (unanimously):
Said16 May 2023Council
Changes to director structure
The Executive Leader, Councillor Alistair Bradley presented the report of the Chief Executive which set out proposals for changes to the director structure to ensure it remains fit for purpose.
Moved16 May 2023Council
Changes to director structure
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Executive Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously):
Moved18 Apr 2023Council
Executive Cabinet
The Leader of the Council and Executive Member for Economic Development and Public Service Reform, Councillor Alistair Bradley proposed the report and The Executive Member for Resources, Councillor Peter Wilson seconded, and it was;
Named18 Apr 2023Council
Policy Review: Council Tax Discretionary Reductions Policy
It was moved by the Executive Member for Customer, Streetscene and Environment, Councillor Lowe, seconded by the Executive Leader, Councillor Alistair Bradley, and it was Resolved (unanimously):
Named30 Mar 2023Executive Cabinet
Business Energy & Road Net Zero Support Scheme
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform presented the confidential report of the Director of Change and Delivery which sought approval for a Business Energy and Road to Net Zero Support scheme for Chorley Businesses.
Named30 Mar 2023Executive Cabinet
Bus Shelters
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform presented the confidential report of the Director of Customer and Digital on behalf of Councillor Peter Wilson, Executive Member for Resources which outlined the proposals for a five-year replacement program for the Council bus shelter stock, design and procurement route for approval.
Named30 Mar 2023Executive Cabinet
Unit 28 and 29 Market Walk - Renewal of Lease to Ryman Group Limited
Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform presented the confidential report of the Director of Commercial Services on behalf of Councillor Peter Wilson, Executive Member for Resources which sought Member authorisation for the grant of a new lease of Units 28-29, Market Walk to Ryman Group Ltd. subject to terms provisionally agreed by the Council’s Consultant Surveyor as detailed in this report.
Said27 Mar 2023Central Lancashire Strategic Planning Joint Advisory Committee
Welcome by Chair and Introductions
The Chair, Councillor Alistair Bradley welcomed everyone to the meeting.
Named28 Feb 2023Council
Conservative Group proposed amendment to Budget
Substantive motion The substantive motion, as indicated in Agenda Item 5 was proposed by the Deputy Executive Leader, Councillor Peter Wilson, and seconded by the Executive Leader, Councillor Alistair Bradley, was then put to the vote.
Moved28 Feb 2023Council
Any urgent business previously agreed with the Mayor - Committee Appointments
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Executive Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously):
Moved24 Jan 2023Council
Executive Cabinet
The Leader of the Council and Executive Member for Economic Development and Public Service Reform, Councillor Alistair Bradley proposed the report and The Executive Member for Resources, Councillor Peter Wilson seconded, and it was;
Said24 Jan 2023Council
Lancashire 2050 Framework
The Executive Leader, Councillor Alistair Bradley presented the report of the Chief Executive that sought to present the work undertaken towards the development of strengthened joint working across Lancashire, a strategic framework and seek agreement on the adoption of collective priority areas.
Said24 Jan 2023Council
Lancashire 2050 Framework
Councillor Bradley explained that the framework was the result of collaboration of all Local Authorities within Lancashire and it outlined the aspirations and ambitions held for Lancashire.
Moved24 Jan 2023Council
Lancashire 2050 Framework
The Executive Leader, Councillor Alistair Bradley proposed and the Executive Member for Resources, Councillor Peter Wilson seconded, and it was Resolved (Unanimously) 1. Council endorse the outline Lancashire 2050 strategic framework as the strategic framework that will guide further development of shared detailed priorities and actions.
Seconded24 Jan 2023Council
Mawdesley Neighbourhood Plan Area Designation
The Executive Member for Planning and Development, Councillor Morwood proposed and the Executive Leader, Councillor Alistair Bradley seconded, and it was Resolved (Unanimously) 1. Council approves the designation of the Neighbourhood Plan area for Mawdesley as shown at Appendix 1.
Seconded24 Jan 2023Council
Policy Review: Discretionary Housing Payment Policy
The Executive Member for Resources, Councillor Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded, and it was Resolved (Unanimously) 1. Council approves the revised Discretionary Housing Payment Policy.
Said24 Jan 2023Council
Internal Audit reviews
The Executive Leader, Councillor Alistair Bradley presented a report of the Chief Executive that presented the Audit and Risk Interim Report that was considered by the Governance Committee on 18 January to highlight the findings of two internal audit reports that received limited assurance ratings.
Said24 Jan 2023Council
Internal Audit reviews
Councillor Bradley explained that he had been made aware of issues within the directorate in 2022 by the former Chief Executive who indicated he wanted to investigate further. The Executive Leader did not request further information as it was a Chief Executive function. Proposed management actions were now in place and action had already been taken to rectify issues.
Moved24 Jan 2023Council
Internal Audit reviews
Councillor Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (Unanimously) 1. Council notes the Audit and Risk Interim Report set out at Appendix A and note the proposed response set out in this report.
Named19 Jan 2023Executive Cabinet
Shared Services Review - Property and Assets
Councillor Alistair Bradley, Executive Leader and Executive Member (Economic Development and Public Service Reform) presented the confidential report of the Director of Change and Delivery which outlines the shared services review for Property and Assets.
Named15 Dec 2022Overview and Scrutiny Performance Panel
Performance Focus - Policy and Governance
Councillor Peter Wilson, Executive Member for Resources, and Councillor Alistair Bradley, Executive Member for Economic Development and Public Service Reform presented the Policy and Governance Performance Focus.
Named13 Dec 2022Council
Mayoral Announcements
Members, including the Leader of the Council, Councillor Alistair Bradley, the Leader of the Opposition, Councillor Alan Cullens, Deputy Leader of the Council, Councillor Peter Wilson, and Councillor Aidy Riggott joined the Mayor in thanking Gary for his service.
Named13 Dec 2022Council
Central Lancashire Local Plan Preferred Options
The Executive Leader, Councillor Alistair Bradley, presented the report of the Director of Planning and Development which sought approval to consult on Part One of a two stage Preferred Options version of the Central Lancashire Local Plan together with its associated documents and evidence base. Chorley, South Ribble and Preston Councils would consider the same recommendations for approval throughout this week. National Government policy require all local planning authorities to have an up to date local planning policy in place.
Moved13 Dec 2022Council
Central Lancashire Local Plan Preferred Options
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (by majority 24:11:2) 1. To approve the Part One Central Lancashire Local Plan Consultation document (Appendix One) for consultation purposes, 2. To note the supporting document The Site Selection Process;
Moved13 Dec 2022Council
Committee appointment
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) That Councillor Mark Clifford fill the vacant seat on the Equality Forum.
Named8 Dec 2022Executive Cabinet
Tatton Gardens Update
Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform) presented the report of the Deputy Chief Executive which provides a development progress and commercial update for the Tatton Gardens scheme.
Named8 Dec 2022Executive Cabinet
Shared Services Pest Control
Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform) presented the report of the Director of Communities updates Members on the feedback following the staff consultation on the proposed shared pest control service and highlights the changes to the service budget following the outcomes of the consultation.
Named15 Nov 2022Council
Update on Christmas proposals
The Executive Leader, Councillor Alistair Bradley, presented the report of the Deputy Chief Executive which updated members on the plans for the Christmas celebrations this year and outlined the measures being taken to make the events more energy efficient.
Moved15 Nov 2022Council
Update on Christmas proposals
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) 1. To note the activities planned for the Christmas 2022 celebrations.
Moved15 Nov 2022Council
Committee appointments
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) That the following appointments be agreed:
Moved15 Nov 2022Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) That the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act.
Named20 Oct 2022Executive Cabinet
Meals on Wheels
Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform) presented the report of the Director of Change and Delivery on behalf of Councillor Peter Wilson, Executive Member (Resources). The report provides details on the arrangements for the provision of the ‘’ service in Chorley.
Named18 Oct 2022Central Lancashire Strategic Planning Joint Advisory Committee
Welcome by Chair and Introductions
The Chair, Councillor Alistair Bradley, welcomed everyone to the meeting.
Named18 Oct 2022Central Lancashire Strategic Planning Joint Advisory Committee
Land Supply Position for the Three Councils
The Chair, Councillor Alistair Bradley read the following statement to the committee.
Named27 Sep 2022Council
Chorley Economic Strategy
The Executive Leader, Councillor Alistair Bradley, presented the report of the Director of Change and Delivery. The pandemic had a dramatic impact on the economic environment and demonstrated that economic circumstances are intrinsically connected to overall wellbeing and potential.
Said27 Sep 2022Council
Chorley Economic Strategy
In response to a query Councillor Bradley noted that there was a lack of investment in the east of Lancashire and that there was a ‘travel to work’ area, which included neighbouring authorities. The new ‘investment zones’ had been announced the previous week so more information was needed about them before any decisions relating to them. Members discussed the potential to invite businesses from the local service centres to future discussions.
Moved27 Sep 2022Council
Chorley Economic Strategy
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (by majority 37:0:1) To consider and approve the for implementation.
Seconded27 Sep 2022Council
Polling Station Review 2022
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (unanimously) To note that there will be no change to polling station locations, except for St Chad’s parish hall which will be used instead of a portacabin, which returns to the original approved recommendation at the council meeting held on 16 November 2021.
Moved27 Sep 2022Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 1 of Part 1 of schedule 12A to the Local Government Act.
Named27 Sep 2022Council
Review of Management Capacity
The Executive Leader, Councillor Alistair Bradley, introduced the confidential of the Chief Executive.
Moved27 Sep 2022Council
Review of Management Capacity
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (by majority 31:1:6) To approve the changes proposed to the council’s management structure within the review of management capacity.
Named22 Sep 2022Overview and Scrutiny Performance Panel
Performance Focus: Commercial and Property
Executive Leader and Executive Member for Economic Development and Public service Reform Councillor Alistair Bradley, Executive Member for Homes and Housing Councillor Terry Howarth and Director of Commercial Services Mark Lester presented the report.
Named7 Sep 2022General Purposes Committee
Housing Statement of Common Ground
The Executive Leader and Executive Member (Economic Development and Public Service Reform), Councillor Alistair Bradley, presented the report of the Director of Planning and Development. The report provided an update on the evidence and strategic policies for housing for the new Central Lancashire Local Plan and considered the provision of robust highways assessments for planning applications.
Said7 Sep 2022General Purposes Committee
Housing Statement of Common Ground
Councillor Bradley reported that the three Councils of Chorley, Preston and South Ribble were committed to preparation of a joint local plan which would include both strategic and development management policies, for use when determining planning applications. Commissioning housing evidence and preparing an agreed approach to the distribution of housing need was a critical part of the plan-making process.
Named19 Jul 2022Council
Public Questions
A question was received from Andy Hunter-Rossall, who attended the meeting virtually, and asked the question of the Executive Leader, Councillor Alistair Bradley.
Said19 Jul 2022Council
Public Questions
Are the Council aware of any bus services that may be threatened by the withdrawal of government support?” Councillor Bradley responded and noted that Lancashire County Council (LCC) were the transport authority, but he was not aware of any bus services under threat. This was a question for LCC perhaps? However, Chorley Council had invested over £700,000 in bus services within Chorley since 2016.
Said19 Jul 2022Council
Public Questions
Councillor Bradley noted his hopes for a joined-up transport policy for Lancashire moving forwards. Question two “Young people are required to stay in education or training until the age of 18, but the vast majority have to travel outside of Chorley for this provision. The cost of a bus pass to Runshaw College is £475, and to Cardinal Newman College is £409 per year.
Said19 Jul 2022Council
Public Questions
Will the Council consider the feasibility of a free bus pass for young people?” Councillor Bradley noted that college transport was a matter for colleges and central government. Colleges determine how the funding is distributed and suggested that the question be directed to LCC or Westminster? Chorley Council had worked with the Youth Zone and Stagecoach to implement a £1 fare and have worked with the Youth Zone on other potential transport and service delivery solutions.
Said19 Jul 2022Council
Annual Report 2021/22
The Executive Leader, Councillor Alistair Bradley presented the Council’s Annual Report which summarised the council’s achievements during 2021/22.
Moved19 Jul 2022Council
Annual Report 2021/22
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) that the report be noted.
Named19 Jul 2022Council
Shared Services Future Development: Phase 3
The Executive Leader, Councillor Alistair Bradley, presented the report of the Director of Change and Delivery which outlined the proposed approach for the delivery and implementation of phase 3 of shared services.
Moved19 Jul 2022Council
Shared Services Future Development: Phase 3
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) 1. Approval granted to commence the shared services review for the Property and Assets function including staff consultation and engagement in line with the process set out in the report.
Named19 Jul 2022Council
Questions Asked under Council Procedure Rule 8
A question has been received from the Leader of the Opposition, Councillor Alan Cullens, for the Executive Leader, Councillor Alistair Bradley.
Named19 Jul 2022Council
Levelling Up Funding Bid
The Executive Leader, Councillor Alistair Bradley, gave a short presentation which set out the plans for the Levelling Up Funding bid (LUF), and noted that councils were invited to submit a bid no later than 6 July 2022. The timescales for the funding bids were tight and therefore it was important that the schemes included were already partly progressed and/or the land was owned by the council. The schemes also needed to focus on the three key properties of the LUF, town centre regeneration, cultural and heritage and transport improvements.
Said19 Jul 2022Council
Levelling Up Funding Bid
Councillor Bradley responded to a query regarding the timescales for planning applications to be determined and noted that conversations had already taken place with planning officers regarding the proposed schemes and the proposed timescales to submit an application was set out in the report. The debate continued in private session.
Moved19 Jul 2022Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded and it was Resolved (unanimously) That the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraphs 1 and 3 of Part 1 of schedule 12A to the Local Government Act.
Named19 Jul 2022Council
Levelling Up Funding Bid
The Executive Leader, Councillor Alistair Bradley, acknowledged the significant funding implication for the council, but stressed the opportunities to generate income from the proposed schemes. The council had also submitted LUF schemes to Lancashire County Council. Members debated the proposals and noted the option to submit smaller scale projects, the need for further detailed planning for the projects and the pressure of the deadline to submit the bid.
Moved19 Jul 2022Council
Levelling Up Funding Bid
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the remaining recommendations and it was Resolved (unanimously) 2. Acknowledged that the financial commitment from the Council will be off set through revenue returns from the scheme.
Seconded19 Jul 2022Council
Approval of Budget Increase for Wigan Lane Archery Facility
The Executive Member (Planning and Development), Councillor Alistair Morwood and the Executive Leader, Councillor Alistair Bradley seconded and it was Resolved (unanimously) 1. Approval to increase the budget for Wigan Lane.
Named16 Jun 2022Executive Cabinet
Equality Framework
Councillor Bradley, Executive Member (Economic Development and Public Service Reform) presented the report of the Director of Change and Delivery which presents the Equality Framework to Executive Cabinet for approval.
Named16 Jun 2022Executive Cabinet
Levelling up Funding Bid
Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform) presented the report of the Chief Executive which seeks approval on the submission of a levelling up funding bid and the proposed levelling up funding scheme.
Named17 May 2022Council
Executive Cabinet appointments for 2022/23
Councillor Alistair Bradley, Executive Leader informed the Council of his appointments to the Executive Cabinet for 2022/23.
Moved17 May 2022Council
Appointments to committees, panels and working groups for 2022/23
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved ( unanimously) that the following appointments be approved for 2022/23:
Moved17 May 2022Council
Appointments to outside bodies for 2022/23
The Executive Leader, Councillor Alistair Bradley proposed, the Deputy Leader, Councillor Peter Wilson seconded, and it was Resolved (unanimously) that appointments to outside bodies be approved as follows:
Said17 May 2022Council
Astley cottage roof repairs
Councillor Bradley noted that the original scheme had been costed out in detail, but that additional works had been identified. Costs were rising due to external factors and works which had not been anticipated (as was often the case when working on old buildings). One of the costs were professional fees, due to additional surveys, which were costly.
Seconded17 May 2022Council
Astley cottage roof repairs
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded and it, was Resolved (by majority 38:0:3) 1. Approval granted to the creation of a new capital budget of £340,646 to fund the cottage roof replacement.
Moved19 Apr 2022Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the (unanimous) Decision that the report be noted.
Seconded19 Apr 2022Council
Decarbonisation of the Town Hall
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded the (by majority 25:0:10) Decision 1. To approve a capital budget of £1,590,085 funded by £285,290 grant and £1,304,975 of borrowing to finance the works to decarbonise the Town Hall and reduce the footprint of the building by 58%.
Named19 Apr 2022Council
Appointment of Chief Executive
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive which proposed the appointment of a new Chief Executive, shared with South Ribble Borough Council.
Moved19 Apr 2022Council
Appointment of Chief Executive
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the (unanimous) Decision 1. That following a meeting of the Shared Services Joint Committee Appointments Panel on 25 March 2022, Chris Sinnott be appointed as the Council’s new Shared Chief Executive with effect from 1 January 2023.
Named29 Mar 2022Planning Committee
21/01416/FUL - Land South Of Mercer Court And East Of Westhoughton Road, Adlington
Public speakers: Andrew McKenzie (Objector), Councillor Alistair Bradley (Ward Councillor), Councillor Peter Wilson (Ward Councillor), and Eddie Joynt (Applicant) After careful consideration, it was proposed by Councillor Morwood and seconded by Councillor Peter Gabbott that officer recommendations were approved.
Named10 Mar 2022Overview and Scrutiny Performance Panel
Performance Focus - Commercial and Property
The Committee welcomed Executive Leader, Executive Member (Economic Development and Public Service Reform) Councillor Alistair Bradley, Executive Member (Homes and Housing) Councillor Peter Gabbott and Director of Commercial Services Mark Lester.
Named24 Feb 2022Executive Cabinet
Revenue Budget Monitoring Quarter 3 2021/22
On Behalf of Councillor Peter Wilson, Executive Member (Resources), Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented the report of the Director of Finance which set out the revenue and reserves forecast for 2021/22 for the Council, based on the position as at 31 December 2021.
Named24 Feb 2022Executive Cabinet
Capital Budget Monitoring Quarter 3 2021/22
On Behalf of Councillor Peter Wilson, Executive Member (Resources), Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented the report of the Director of Finance which outlines the overall financial position of the Council in respect of the capital programme as at 31 December 2021, highlighting key issues and explaining key variances over the first six months of the year, and provides an overview of various elements of the Council’s Balance Sheet as at 31 December 2021.
Named24 Feb 2022Executive Cabinet
Quarter Three Performance Monitoring Report 2021/22
On Behalf of Councillor Peter Wilson, Executive Member (Resources), Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented the report of the Deputy Chief Executive which sets out the performance against the delivery of the Corporate Strategy and key performance indicators during the third quarter of 2021/22, covering 1 October 2021 to 31 December 2021.
Named24 Feb 2022Executive Cabinet
Approval of Revised Terms for the Lease for Whittle Surgery - Site of 239 Preston Road, Whittle-le-Woods
On Behalf of Councillor Peter Wilson, Executive Member (Resources), Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented the confidential report of the Director of Commercial Services which seeks approval for additional terms in respect of the lease of the site of 239 Preston Road, Whittle-le-Woods to the Whittle GP Surgery Practice.
Named24 Feb 2022Executive Cabinet
Approval of Tender Evaluation Criteria for Security & Concierge Services
On Behalf of Councillor Peter Wilson, Executive Member (Resources), Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented the confidential report of the Director of Commercial Services which provides details of the procurement exercise being undertaken to bring the contracts for the delivery of the concierge and security services across council operated assets into one, including the evaluation criteria and weightings which will be used to award the contract.
Named24 Feb 2022Executive Cabinet
Approval to Procure Replacement Ride on Mowers
On Behalf of Councillor Peter Wilson, Executive Member (Resources), Councillor Alistair Bradley, Executive Member (Economic Development and Public Service Reform), presented the confidential report of the Director of Customer and Digital which seeks approval for the procurement of four ride on mowers for use in Streetscene Services as well as delegating the award of contract to the Executive Member for Resources.
Named22 Feb 2022Council
Public Questions
A question was received from Andy Hunter-Rossall who attended the meeting virtually and asked the question of the Executive Leader, Councillor Alistair Bradley.
Said22 Feb 2022Council
Public Questions
Given the positive impact on our health, our environment, and on reducing traffic; and given that Active Travel England will soon be grading authorities on their performance on active travel, will the Council commit to attempting again to start a Cycling Task Group.” Councillor Bradley responded and noted that members of the Overview and Scrutiny Committee set their work program and there were a number of other competing priority areas requiring focus, including Select Move housing and school places which are also of interest to many residents and Councillors.
Named22 Feb 2022Council
Re-opening of Astley Hall
The Executive Leader, Councillor Alistair Bradley, presented the report of the Deputy Chief Executive with proposals for re-opening Astley Hall following the extensive renovations. This included the introduction of an admission fee to support the long-term sustainability of one of the most historic and landmark attractions in the borough.
Said22 Feb 2022Council
Re-opening of Astley Hall
Councillor Bradley explained that it was not viable for the council to maintain the Hall without the fee, and that feedback had been received that people would pay a small fee to visit the Hall.
Moved22 Feb 2022Council
Re-opening of Astley Hall
The Executive Leader, Councillor Alistair Bradley proposed and the Executive Member for Customer and Streetscene Services, Councillor Adrian Lowe seconded the (by majority) Decision 1. To introduce an admission fee for entry into Astley Hall as set out in this report.
Seconded22 Feb 2022Council
Fair Collection Charter
The Executive Member (Customer and Streetscene Services), Councillor Adrian Lowe, proposed and the Executive Leader, Councillor Alistair Bradley seconded the (unanimous) Decision 1. To adopt the new .
Named22 Feb 2022Council
Future development of shared services
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive which set out the options and proposals for the future development of the councils’ shared services relationship. These proposals were endorsed by a majority of the Shared Services Joint Committee at an informal meeting on 10 February. The additional capacity would ensure that the councils were able to deliver key priorities and services.
Moved22 Feb 2022Council
Future development of shared services
The Executive Leader, Councillor Alistair Bradley proposed and the Executive Member (Planning and Development, Councillor Alistair Morwood seconded the (by majority) Decision 1. That the principles for the shared services relationship with South Ribble Borough Council set out at paragraph 23 be approved.
Named22 Feb 2022Council
Recruitment of Chief Executive
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive which set out proposals for the recruitment of a new Chief Executive. The decision was necessary to ensure continuity of delivery of the role Chief Executive/Head of Paid Service.
Moved22 Feb 2022Council
Recruitment of Chief Executive
The Executive Leader, Councillor Alistair Bradley proposed and the Executive Member (Customer and Streetscene Services), Councillor Adrian Lowe seconded the (unanimous) Decision To approve the proposals for the recruitment for a new Chief Executive
Named22 Feb 2022Council
Revenue Budget 2022/23, Medium Term Financial Strategy and Capital Programme 2022-2025
The Executive Leader, Councillor Alistair Bradley, presented the Executive's Revenue Budget 2022/23, Medium Term Financial Strategy and Capital Programme 2022-2025.
Said22 Feb 2022Council
Revenue Budget 2022/23, Medium Term Financial Strategy and Capital Programme 2022-2025
Councillor Bradley thanked the officers, the Executive Member Resources, Councillor Peter Wilson and Labour Group for their hard work and input into the proposed budget. He thanked all the staff working for the council for their contributions in delivering services during the Covid-19 pandemic.
Named22 Feb 2022Council
Revenue Budget 2022/23, Medium Term Financial Strategy and Capital Programme 2022-2025
Councillor Bradley referred to the achievements of the council in recent years, and the plans within the Corporate Strategy, which would be delivered by the proposed budget, including Involving residents in improving their local area and equality of access for all continue to work with our residents to address climate change and achieve our commitment of being a carbon neutral council by 2030. A strong local economy providing support and grants for businesses and developing our approach to apprenticeships, graduate and training posts in areas of high market demand and supporting people into high quality employment Clean, safe and healthy communities investing in local play and community facilities, supporting the delivery of affordable homes and improving our leisure centres An ambitious council that does more to meet the needs of residents and the local area making improvements across the borough, supporting our young people, health and wellbeing and local areas.
Said22 Feb 2022Council
Conservative Group Amendment to Budget
Following a query relating to section 106 contributions from developers relating to Buckshaw Village Railway Station Councillor Bradley agreed to discuss the issue with Lancashire County Council. The Mayor called a short adjournment to take legal advice regarding the amendment at 8.20pm.
Named22 Feb 2022Council
Conservative Group Amendment to Budget
Substantive motion The substantive motion, as indicated in Agenda Item 9 was proposed by the Executive Leader, Councillor Alistair Bradley, and seconded by the Executive Member (Customer and Streetscene Services), Councillor Adrian Lowe, was then put to the vote.
Moved22 Feb 2022Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Executive Member (Customer and Streetscene Services), Councillor Adrian Lowe seconded the (unanimous) Decision That the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraphs 1 and 3 of Part 1 of schedule 12A to the Local Government Act.
Named22 Feb 2022Council
Bengal Street Project Update - Capital Budget
The Executive Leader, Councillor Alistair Bradley, presented the confidential report of the Director of Commercial.
Moved22 Feb 2022Council
Bengal Street Project Update - Capital Budget
The Executive Leader, Councillor Alistair Bradley proposed and the Executive Member for Planning and Development, Councillor Alistair Morwood seconded the (unanimous) Decision To approve the creation of a £1.1m budget in the capital programme from grant funding secured through the BLRF in the further development of the Bengal Street depot site.
Moved25 Jan 2022Council
Executive Cabinet
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the (unanimous) Decision that the report be noted.
Moved25 Jan 2022Council
Committee appointments
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the (unanimous) Decision to approve the following changes to committees and outside bodies:
Seconded25 Jan 2022Council
Land Purchase to extend Yarrow Valley Country Park
The Deputy Leader, Councillor Peter Wilson proposed and the Executive Leader, Councillor Alistair Bradley seconded the (unanimous) Decision To establish a budget and to purchase the land off Burgh Lane to encompass it into Yarrow Valley Country Park for the purpose of tree planting and habitat protection at a cost of £250,000 funded through borrowing.
Named25 Jan 2022Council
Greater Lancashire Deal
The Executive Leader, Councillor Alistair Bradley, presented the report of the Chief Executive which updated Members on work undertaken towards development of strengthened joint working, a long term strategic plan and a County Deal for the Lancashire area and seek agreement to progress this work.
Named25 Jan 2022Council
Greater Lancashire Deal
Councillor Aidy Riggott noted the significant contribution made by Councillor Bradley and Gary Hall in getting to this point.
Moved25 Jan 2022Council
Greater Lancashire Deal
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the (unanimous) Decision to 1. Support the outline "Our New Deal for a Greater Lancashire" at Appendix 1 as the initial draft basis for further discussion and development of a possible County Deal for the Lancashire area;
Moved25 Jan 2022Council
Exclusion of the Public and Press
The Executive Leader, Councillor Alistair Bradley proposed and the Deputy Leader, Councillor Peter Wilson seconded the (unanimous) Decision that the press and public be excluded from the meeting for the following item of business on the grounds that it involves the disclosure of exempt information as defined by paragraph 3 of Part 1 of schedule 12A to the Local Government Act.
Named25 Jan 2022Council
Wigan Lane Playing Pitch Facility Budget Approval
The Executive Leader, Councillor Alistair Bradley, presented the confidential report of the Director of Planning and Development. The purpose of the report was to obtain Member approval of the budget to deliver a new archery facility and associated infrastructure at Wigan Lane Playing Field in Chorley.
Moved25 Jan 2022Council
Wigan Lane Playing Pitch Facility Budget Approval
The Executive Leader, Councillor Alistair Bradley proposed and the Executive Member for Planning and Development, Councillor Alistair Morwood seconded the (unanimous) Decision 1. To approve the outline budget to deliver the project.
Showing the latest 300 of 951.
Minutes are the council's own written record of a meeting. They summarise what was said rather than recording every word, so each extract is shown exactly as the council published it, with the meeting it comes from.