Named14 Oct 2026Standards Committee
Dispensation for Members Participating in Community Governance Review
In response to a question from Councillor Bearshaw regarding predetermination, the Deputy Monitoring Officer explained that Members would still be required to approach matters with an open mind and consider the information and views presented to them. The dispensation would not remove Members' responsibilities in relation to bias and predetermination.
Named14 Sep 2026Audit Committee
Annual Treasury Outturn Report 2025/2026
In response to the Vice-Chair, Councillor Bearshaw, the Assistant Director for Finance and Deputy Section 151 Officer confirmed that forecasts were regularly reviewed using Bank of England and Office for Budget Responsibility information, together with benchmark rates from MUFG, the Council’s Treasury advisers. Because rates had been volatile, the Council had deliberately kept borrowing and investments relatively short term so that it could respond to rate changes and refinance for longer periods when appropriate.
Asked14 Sep 2026Audit Committee
Anti Fraud and Corruption Action Plan Update
The Vice – Chair, Councillor Bearshaw asked whether anti-fraud training was compulsory. The Assistant Director for Finance and Deputy Section 151 Officer confirmed that the e-learning module was expected to be completed annually but was not currently mandatory, and that take-up data was not available at the meeting.
Asked14 Sep 2026Audit Committee
Anti Fraud and Corruption Action Plan Update
The Vice – Chair, Councillor Bearshaw asked when the fraud risk assessment dated 2024 would next be refreshed. The Assistant Director for Finance and Deputy Section 151 officer commented there was no planned assessment during the current year but agreed that a regular, non-annual cycle should be established. He also agreed to link the assessment to service risk registers, assurance statements, the annual governance statement and other relevant processes.
Named20 Jul 2026Corporate Performance Panel
Cabinet Report - Full Year Performance Management Report
In response to a question from Councillor Bearshaw, the Senior Corporate Governance Officer clarified that three projects were on hold: the devolution programme due to external factors and two within the corporate governance team, which were paused due to resource shortages pending ongoing recruitment efforts.
Named20 Jul 2026Corporate Performance Panel
Corporate Performance Monitoring 2026/2027 Target Setting
In response to Councillor Bearshaw on including a KPI on Children’s Care Homes and provisions for activities/open spaces to be added in the Local Plan. The Assistant Director for Environment and Planning explained this was too specific to be added as a KPI however highlighted the Local Housing Need Assessment that was being undertaken, and it was agreed that the issue could be discussed in this context at the Local Plan Task Group.
Asked20 Jul 2026Corporate Performance Panel
Cabinet Report - Revenue Outturn Report 2025/2026
Councillor Bearshaw questioned the forecasting and unexpected spend compared to last year. The Assistant Director for Finance and Deputy Section 151 Officer explained revenue was reported throughout the year and explained there was more detail to estimate on budget such as impact on weather for car parking and enforcement action.
Said20 Jul 2026Corporate Performance Panel
Cabinet Report - Capital Outturn Report 2025/2026
Councillor Bearshaw thanked Officers for the report and questioned the risk of projects.
Named14 May 2026Council
Election of a councillor to hold office as mayor of the borough of king's lynn and west norfolk and to be chair of the council for the municipal year 2026/2027
Councillor Ring proposed Councillor Bearshaw for the position of Mayor and Chair of the Council for the 2026/2027 Municipal Year.
Named14 May 2026Council
Administer oath to the mayor
Councillor Bearshaw read and signed the Declaration of Acceptance of Office and informed the Council that his wife Marisol would be his Consort.
Said14 May 2026Council
Administer oath to the mayor
Councillor Bearshaw informed the Council that the Mayor’s Chaplain would be Father Adrian Ling, up until he left the area.
Asked15 Apr 2026Corporate Performance Panel
Cabinet Report - Quarter 3 Budget Monitoring
Councillor Bearshaw sought further detail in relation to Appendix A, highlighting Community Safety and Nuisance and Marmot initiative.
Named17 Feb 2026Audit Committee
Limited Assurance Audit Report - Community Safety
In response to a question from Councillor Bearshaw, the Assistant Director for Health, Wellbeing and Public Protection explained that an operational partnership team was already in place, with established links, and had not encountered any difficulties arising from the Borough leading the Community Safety Partnership.
Named17 Feb 2026Audit Committee
External Audit Results Report 2024/2025 - Ernst & Young
In response to a question from Councillor Bearshaw, the External Auditor explained that the Council had slightly missed the deadline for the current accounts and that the priority was to complete the current year’s audit before building assurance over previous periods. The lack of audits in recent years had created a learning curve for the Council.
Asked17 Feb 2026Audit Committee
Internal Audit Progress Report 2025/2026
Councillor Bearshaw queried why several audits had been cancelled. The Head of Internal Audit advised that the Building Control Audit had been cancelled due to the Building Safety Regulator undertaking an audit and assurance would be taken. The Capital Programme and Project Management Audit had been deferred to the following year’s plan, as had the Procurement Audit for the reasons set out in the report.
Named17 Feb 2026Audit Committee
Internal Audit Progress Report 2025/2026
In response to a question from Councillor Bearshaw, the Head of Internal Audit explained that an update on recommendation progress had not been provided because it was initially unclear whether a progress report would be produced, leaving insufficient time to complete follow?up work before the decision was made to proceed with the report.
Named28 Jan 2026Joint Panel Meeting
Cabinet Report - Capital Programme and Resources 2025 - 2030
Councillor Bearshaw referred to Table 7 on page 214 of the report and asked what the miscellaneous grants covered and why they had increased significantly.
Asked17 Nov 2025Audit Committee
Verbal Update form External Auditors EY
Councillor Bearshaw questioned if a different colour was needed for the RAG rating for areas which were not in scope.
Asked17 Nov 2025Audit Committee
Business Continuity Annual Update
Councillor Bearshaw sought clarification if preventive and recovery barriers had been identified and scored.
Said22 Oct 2025Joint Panel Meeting
Scrutiny Governance Arrangements
Councillor Bearshaw commented that when he was Chair of the Regeneration and Development Panel he had found the regular meetings with other Panel Chairs really useful in terms of co-ordinating Work Programmes. He also noted that some meetings had been cancelled due to lack of agenda items and the importance of bringing items to the Panels early so that the Panel could assist with the development of Policy.
Named22 Oct 2025Corporate Performance Panel
Cabinet Report - Council Tax Support Scheme 2026/2027
In response to a question from Councillor Bearshaw it was clarified that uninhabitable properties, for example those undergoing renovation, were not eligible for Council Tax support and could instead make an application for discretionary hardship support.
Said8 Sep 2025Standards Committee
Dispensations to 'Twin-Hatters'
Councillor Bearshaw commented Local Government Reorganisation was being done and wasn’t a choice made and therefore Borough Council and County Council would then not exist, and the dispensation provided a safer position.
Named28 Jul 2025Planning Committee
PC27
Councillor Bearshaw 9/1(a) Clenchwarton Councillor Parish 9/2(a), 9/2(b) Heacham Councillor Beales 9/3(a) Great Massingham
Named16 Jul 2025Standards Committee
Report on 2024-2025 Complaints
Councillor Bearshaw referred to page 18, 4.1 and commented out of 14 Parish Councillor complaints in which 4 were made about the same Councillor. He asked if this was an ongoing concern.
Named16 Jul 2025Standards Committee
Report on 2024-2025 Complaints
In response to a further question from Councillor Bearshaw, the Deputy Monitoring Officer explained complaints against Parish Councillors were sent to the Parish Clerk.
Named16 Jul 2025Standards Committee
Report on Dispensation
Councillor Bearshaw referred to the example used in relation to Planning and the Deputy Monitoring Officer commented the point was noted however the rationale was Council Tax affected the majority of residents within the Borough.
Said3 Jul 2025Audit Committee
Risk Register Update
Councillor Bearshaw thanked Officers for the report and new format which was easy to read. He commented on identifying the severity of the risk and preventive and recovery control along with the effectiveness being documented. He added an additional column for the responsible Assistant Director in relation to the risk.
Said3 Jul 2025Audit Committee
Risk Register Update
Councillor Bearshaw commented this allowed the risks to be reassessed when changing to the new system.
Named3 Jul 2025Audit Committee
Annual Internal Audit Progress Report
Officers provided information relating to funding sources, the report being considered by the Cabinet and Full Council and the Capital Programme Councillor Bearshaw referred to page 106 and sought clarification in the reasoning for the cancelled audits.
Named3 Jul 2025Audit Committee
Annual Internal Audit Progress Report
Councillor Bearshaw referred to page 144 and thanked Officers for including a column in for the priority and asked for a risk to be associated with all recommendations.
Named3 Jul 2025Audit Committee
Annual Internal Audit Progress Report
In response to a further question from Councillor Bearshaw, the Head of Internal Audit confirmed appendix 3 only included the high and medium recommendations.
Named2 Jul 2025Corporate Performance Panel
Cabinet Report- Leisure Facilities Feasibility Study
In response to a question from Councillor Bearshaw it was explained that the work would involve improvements to Lynnsport as a whole, including improvements to the current layout and more detail would be available in the RIBA Stage 3 report.
Said2 Jul 2025Corporate Performance Panel
EXEMPT - Cabinet Report- Microsoft Enterprise Agreement 2025-2028
Councillor Bearshaw commented that it would be good to have telephone numbers for services available, so that if you did not know the officers name, you could still get through to a department via telephone.
Named30 Jun 2025Planning Committee
PC18
Councillor Bearshaw 9/2(a) Clenchwarton Councillor Sandell 9/2(b) Docking – statement to be read out Councillor Kirk 9/2(f) West Walton – statement to be read out
Named4 Jun 2025Regeneration and Development Panel
RD9
The Chair of the Transport Informal Working Group, Councillor Bearshaw, presented the report as included in the Agenda, outlining the topics discussed at the Informal Working Group Meetings. He thanked officers and Members for their input. He noted recommendation two within the report, which was to disband the Informal Working Group, and suggested that the Panel may wish to pause the work of the Group until there were further matters to consider, such as the new Local Plan.
Said4 Jun 2025Regeneration and Development Panel
RD9
In response to a question from Councillor Collingham, Councillor Bearshaw explained that the Informal Working Group had discussed railway stations and potential locations and worked with Norfolk County Council to link these through to the Norfolk Rail Prospectus.
Named21 May 2025Corporate Performance Panel
Cabinet Report - Full Year Performance Management Report
Councillor Bearshaw as previous Chair of the Regeneration and Development Panel explained that the Panel had been pushing for updates and further updates would be presented to the Panel once prepared by Officers. He welcomed the fact that the Panel had received a high level update early on in the process so that they could help shape policy.
Named21 May 2025Corporate Performance Panel
2025-2026 Performance Indicator Target Setting Report
In response to a question from Councillor Bearshaw it was explained that the save to spend targets were built into the budget so should be achievable.
Said21 May 2025Corporate Performance Panel
2025-2026 Performance Indicator Target Setting Report
Councillor Bearshaw suggested that last years targets be included in the report for comparison purposes and the Panel suggested that statutory and non-statutory targets be differentiated within the report.
Named15 May 2025Council
Administer oath to the deputy mayor
Councillor Bearshaw read and signed the Declaration of Acceptance of Office and informed the Council that his wife would be his Deputy Mayoress.
Said7 May 2025Standards Committee
Exclusion of Press and Public
Councillor Bearshaw agreed with Councillor Parish’s submissions and proposed that the press and public be excluded.
Said7 May 2025Standards Committee
Exclusion of Press and Public
Councillor Bearshaw advised that public discussion of personal information of Councillor Parish was not in the interest of the public.
Named27 Mar 2025Council
Vacancies on kings lynn conservancy board and internal drainage boards
Councillor de Whalley, seconded by Councillor Moriarty proposed Councillor Bearshaw and Jill Bennett.
Named25 Mar 2025Standards Committee
Summary of 23-24 Code of Conduct Complaints
Councillor Bearshaw referred to table 3 of the report and asked if an additional column could be included for complaints upheld.
Asked25 Mar 2025Standards Committee
Updated Code of Member Conduct and Guidance on Complaint Handling
Councillor Bearshaw asked for the declarations of interest flow chart to be amended to reflect the inclusion of partner.
Named25 Mar 2025Standards Committee
Updated Code of Member Conduct and Guidance on Complaint Handling
Councillor Bearshaw referred to allowances and suggested on the item all members have dispensation to speak as it was needed.
Asked25 Mar 2025Standards Committee
Updated Code of Member Conduct and Guidance on Complaint Handling
Councillor Bearshaw sought clarification on the independent person and if there were separate terms of reference.
Said25 Mar 2025Standards Committee
Updated Code of Member Conduct and Guidance on Complaint Handling
Councillor Bearshaw commented complaints by the nature are emotive and as a committee their role was to remove the emotive ... view the full minutes text for item 15.
Asked17 Mar 2025Audit Committee
Audit Committee Code of Corporate Governance
Councillor Bearshaw sought clarification on when the Code of Corporate Governance was to be reviewed.
Asked17 Mar 2025Audit Committee
Corporate Risk Management Update
Councillor Bearshaw sought clarification on how effective the preventative and recovery barriers were. He questioned further if the new model assessed the barriers and the effectiveness.
Seconded17 Mar 2025Audit Committee
Corporate Risk Management Update
Councillor Bearshaw seconded both recommendations The Audit Committee made the following Recommendations:
Asked17 Mar 2025Audit Committee
Internal Audit Plan 2025/2026
Councillor Bearshaw asked if the recommendations which were still outstanding were considered when categorising the risk of audits into high, medium and low.
Asked17 Mar 2025Audit Committee
Audit Feedback Survey Results
Councillor Bearshaw asked if there was a method if someone had concern about what the Audit Committee was doing or not fulfilling the role.
Asked17 Mar 2025Audit Committee
Training Needs Analysis Results
Councillor Bearshaw asked if there were concerns with the findings or a particular trend.
Said17 Mar 2025Audit Committee
Recommendation Database Follow-up Report
Councillor Bearshaw thanked the Senior Internal Auditor for the revised dates on outstanding and overdue recommendations.
Said17 Mar 2025Audit Committee
Committee Work Programme 2025/2026
Councillor Bearshaw requested the Independent Persons be dealt with as a matter of urgency.
Named20 Jan 2025Audit Committee
Audit Committee Feedback Survey Results
Councillor Bearshaw apologised to Officers and Members of Audit Committee that he was yet to complete the training needs survey and added this was a busy period for all Members and the document was not user friendly.
Named28 Nov 2024Council
Appointment of vice-chair for the meeting
Councillor Beales, seconded by Councillor Ring nominated Councillor S Bearshaw as Vice-Chair for the meeting.
Named18 Nov 2024Audit Committee
Business Continuity Annual Update
Councillor Bearshaw referred to the recommendations and commented it was difficult to review the business continuity in the detail. He referred to part 3 and 4 of the report and asked if a bow tie analysis had been carried out as this part of the report did not reflect this being done.
Named18 Nov 2024Audit Committee
Business Continuity Annual Update
The Assistant Director for Resources and Section 151 Officer advised Councillor Bearshaw, she would liaise with the relevant Officer and respond to his question. In addition, she provided assurance in response to Councillor de Winton’s question, there was various methods in which the data was backed up and stored and confirmed this included being stored off site. She added she would provide a robust response from the IT Manager.
Asked18 Nov 2024Audit Committee
Half Year Internal Audit Progress Report
Councillor Bearshaw sought clarification on the backlog of findings and what was the trend of theses. He additionally asked if a risk-based strategy would be taken on the audits which were being considered for deferral and cancellation.
Named18 Nov 2024Audit Committee
Half Year Internal Audit Progress Report
The Head of Internal Audit responded to Councillor Bearshaw question and confirmed the audits which would be deferred or cancelled in quarter 4 would be considered on a risk basis. She indicated that the audit on elections as an example and advised this could be deferred as there had been elections carried out with no issues.
Said18 Nov 2024Audit Committee
Recommendation Follow-Up Report
Councillor Bearshaw commented the recommendations were overdue but understood the outstanding recommendations were big projects. He sought clarification on forecasting the deadline date, so the recommendations were no longer overdue and a more realistic measure.
Named18 Nov 2024Audit Committee
Recommendation Follow-Up Report
In response to Councillor Bearshaw comment the Assistant Director of Resources and Section 151 Officer agreed to discuss this with the Senior Leadership Team.
Said18 Nov 2024Audit Committee
Half Year Fraud and Error Progress Report 2024-2025
Councillor Bearshaw thanked Officers for their work and exceeding the KPI. He referred to figures 3,4 and 5 and questioned why the amount which was being recovered was not as much as we previously had.
Named18 Nov 2024Audit Committee
Statement of Accounts and Annual Governance Statements for 2020/21, 2021/22 and 2022/23
Councillor Bearshaw endorsed the recommendation and thanked Officers for their work.
Named31 Oct 2024Council
Cabinet member's reports
Councillor Bearshaw invited Councillor de Whalley to the meeting of the Transport Informal Working Group which was looking at the Ferry.
Named16 Sep 2024CIL Spending Panel
Members present pursuant to Standing Order 34
Councillor S Bearshaw and T Parish attended under standing order 34 on zoom.
Said16 Sep 2024CIL Spending Panel
CIL Spending Panel Report - Applications and officer recommendations
50 Clenchwarton – Hall Road parking (£31,000 requested) Under standing order 34 Councillor Bearshaw addressed the Panel in support of the application. He undertook to chase the parish’s annual report on CIL spend which was overdue due to not having a permanent clerk in place for some time. He also confirmed that the parish’s CIL money would be going into the project.
Said16 Sep 2024CIL Spending Panel
CIL Spending Panel Report - Applications and officer recommendations
52 Tilney All Saints Village Hall – refurbishment (£8,800 requested) Under standing order 34 Councillor Bearshaw addressed the Panel in support of the application.
Said23 Jul 2024Regeneration and Development Panel
RD20
The Chair, Councillor Bearshaw commented that transport investment was key.
Said1 Jul 2024Planning Committee
PC12
Councillor Bearshaw advised that he would be speaking as Ward Member in relation to item 9/2(a) – Clenchwarton and would not take part in the debate or decision and left the meeting during consideration of the item.
Said24 Jun 2024Audit Committee
Risk Register Update
Councillor Bearshaw highlighted due to the financial position of the country he did not expect the risk to have changed to the financial risks. He added that due to the resignation of the Chief Executive and changes to Senior Management he expected this risk to increase however it had not.
Said24 Jun 2024Audit Committee
Risk Register Update
Councillor Bearshaw confirmed it is expected that if the mitigation barrier decreased the risk score would increase.
Said24 Jun 2024Audit Committee
Risk Register Update
Councillor Bearshaw highlighted the vacancies in the Planning department and advised the Committee he expected the risk to be higher.
Named24 Jun 2024Audit Committee
Risk Register Update
Councillor Bearshaw referred the Committee to the Strategic Risk 3 and commented there was still a consultation on the shortfall of Gypsy/Traveller Community, and this was not detailed in the report.
Asked24 Jun 2024Audit Committee
Annual Internal Audit Progress Report
Councillor Bearshaw sought clarification on the Audit Plan was completed.
Asked24 Jun 2024Audit Committee
Annual Internal Audit Progress Report
Councillor Bearshaw sought further clarification that all the recommendations from the reports were accepted and now SMART actions.
Asked24 Jun 2024Audit Committee
Annual Internal Audit Follow Up Progress Report
Councillor Bearshaw sought clarification on how the outstanding recommendations were being prioritised by high priority rather than time.
Asked24 Jun 2024Audit Committee
Annual Internal Audit Opinion
Councillor Bearshaw asked if the term opinion could be changed and further suggested a KPI be closing the outstanding and overdue recommendations. The Head of Internal Audit clarified this would be a Senior Management Performance Indicator and not an Internal Audit KPI and confirmed all recommendations made have been accepted. The Senior Internal Auditor confirmed the word opinion is written in the Standards; however, as the Standards could be changing to include the word conclusion instead of opinion, this may be possible.
Asked24 Jun 2024Audit Committee
Audit Committee Self Assessment Review Report
Councillor Bearshaw sought clarification on the priority of the recommendations included in the action plan and stated these would fall with the same Officers as the other recommendations that had been discussed.
Named22 Apr 2024Audit Committee
Update on Internal Audit Plan
The Senior Internal Auditor responded to questions from Councillor Bearshaw and advised r ecommendations from previous years which were outstanding were being looked at and a progress report for this would be ready in June 2024. He stated if the Audit Committee would like further reasons as to why recommendations were outstanding then individual officers as can be asked to attend Audit Committee to explain why.
Said22 Apr 2024Audit Committee
Update on Internal Audit Plan
Councillor Bearshaw commented that with the severity of some of the recommendations, had SMART actions been considered.
Named22 Apr 2024Audit Committee
Update on Internal Audit Plan
In response to Councillor Bearshaw, the Chair asked for a draft progress report of the actions in May before it was presented to the Committee in June.
Said22 Apr 2024Audit Committee
Update on Internal Audit Plan
Cllr Bearshaw commented that the butterfly matrix presents risk information a lot easier and suggested the Committee wait until this is brought back to them before undertaking training on risk as requested by the Chair. ... view the full minutes text for item A168
Said22 Apr 2024Audit Committee
Strategic and Annual Internal Audit Plans 2024/25 to 2026/27
Councillor Bearshaw commented that the companies of the Borough Council could be audited ... view the full minutes text for item A169
Asked9 Apr 2024Environment and Community Panel
EC93
Councillor Bearshaw asked made reference to unauthorised sites and questioned why they were now being permitted. The Assistant Director answered that material circumstances must be considered and planning circumstances into account before enforcement. The Senior Planning Officer added that once the local plan was updated this would make it easier to take action on unauthorised sites.
Asked21 Mar 2024Council
Cabinet members reports - 21 march 2024
Councillor Bearshaw asked Councillor Anota what the situation was with works to King’s Court.
Named11 Mar 2024Audit Committee
Treasury Management Quarter 3 Report 2023/2024
In responses to questions from Councillor Bearshaw on surplus being invested, the Assistant Director – Resources explained that the Council worked with brokers to look at options for investment.
Named11 Mar 2024Audit Committee
Treasury Management Quarter 3 Report 2023/2024
Councillor Bearshaw referred to page 23, Appendix 1, second bullet point – A sharp fall in wage growth, with the headline 3myy rate declining from 8.0% in September to 7.2% in October, although the ONS “experimental” rate of unemployment had remained low at 4.2%. The Assistant Director – Resources explained that the statistical information was supplied by the Office for National Statistics and added that the UK response to wage increases had impacted on inflation which was why it had taken longer than anticipated to come down. It was noted that even in the fluctuation where it was 3.9% back to 4% had been as a result of the wage growth but had now started to stabilise and was compared year on year.
Named11 Mar 2024Audit Committee
Treasury Management Quarter 3 Report 2023/2024
Councillor Bearshaw drew attention to Appendix 2 – Interest rate forecasts and commented that it was reassuring to see that bank rates had been accessible to the Council since 1 November 2012 and was therefore reassurance that the Council had got ... view the full minutes text for item A156
Named20 Feb 2024Regeneration and Development Panel
RD94
The Chair, Councillor Bearshaw, agreed that rail was pitiful in the area and three stations in the Borough was poor, especially as they had very little parking and the amount of homes being built would be increasing. He also referred to RAF Marham and that it was important to consider this important asset which contributed to the local economy.
Said16 Jan 2024Audit Committee
Corporate Risk Register Update (August 2023)
Councillor Bearshaw thanked the Corporate Performance Manager for the work undertaken on the Bowtie methodology and drew attention to page 303, the risk register being monitoring by Management Team and asked if smart actions had been looked at or did Management Team make the decisions to strengthen the process?
Named16 Jan 2024Audit Committee
Corporate Risk Register Update (August 2023)
Following questions from Councillor Bearshaw on reserves, the Assistant Director, Resources explained that reserves were separate from the revenue budget. ... view the full minutes text for item A144
Named10 Jan 2024Regeneration and Development Panel
RD71
The Chair, Councillor Bearshaw, was concerned that the outside space would be filled with seating and planting which would reduce the space available for events. He hoped that adequate space would be available for events to make the area attractive.
Named27 Nov 2023Audit Committee
Internal Audit Half Year Progress Report
In response to questions from Councillor Bearshaw as to why the Organisational Development – Training audit had been deferred, the Senior Internal Auditor explained that the audit would not be undertaken during the current financial year. The audit had been deferred to 2024/2025 so that assurance could be gained ... view the full minutes text for item A128
Named27 Nov 2023Audit Committee
2023/2024 Fraud and Error Half Year Progress Report
Councillor Bearshaw drew attention to Figure 1 – fraud and error comparison year to date against previous years and commented that it would be useful to see the previous four years data illustrating increases. In response, the Senior Internal Auditor explained that generally there was a rise in the number of cases due to the increase in population within the Borough but not to the level reported and added it would be necessary to look at the data to determine why it had happened. The Senior Internal Auditor highlighted the importance of undertaking the exercise and added that the data set out at Figure 1 helped to identify fraudulent/errors in activities and advised that efficiencies had been found in the process.
Named23 Nov 2023Council
Members question time
Councillor Kemp asked Councillor Bearshaw as Chair of Regeneration and Development how he saw the suggestion for a new rail station could go forward.
Named23 Nov 2023Council
Members question time
Councillor Bearshaw considered that the transport hub should be put to the south of the town including a train station and bus depot with battery chargers.
Said23 Nov 2023Council
Members question time
Councillor Bearshaw explained that the majority of the meeting was exempt but was happy to give a briefing on it.
Named20 Nov 2023Cabinet
Members present under standing order 34
Councillor Bearshaw attended in person.
Named16 Nov 2023King's Lynn Area Committee
Members Present Pursuant to Standing Order 34
Councillor Bearshaw was present pursuant to Standing Order 34.
Asked16 Nov 2023King's Lynn Area Committee
Update of the provision of Accessible Play Equipment at The Walks, King's Lynn
Councillor Bearshaw asked if the application was successful was there a time limit to spend the funding.
Named18 Sep 2023Audit Committee
Budget Monitoring Report June 2023
Councillor Morley, Portfolio Holder for Finance responded to questions from Councillor Bearshaw on the costs both within the Borough and other areas of the country.
Asked18 Sep 2023Audit Committee
Budget Monitoring Report June 2023
Councillor Bearshaw asked what the Borough Council did to liaise with the IDB Consortium to bring more money back in.
Named18 Sep 2023Audit Committee
Committee Work Programme
Councillor Bearshaw referred the meeting held on 7 August – Corporate Risk Register when a discussion took place on the bowtie analysis and added that he had held a discussion with G Greaves and asked if it would be helpful for Members to receive a briefing prior to the November meeting. The Chair asked if the Democratic Services Officer could liaise with the relevant officer to arrange a briefing on Teams (late afternoon) for the Audit Committee.
Said7 Aug 2023Audit Committee
Corporate Risk Register Update (May 2023)
Councillor Bearshaw commented that the format of the risk register was difficult to read and referred to pages 39, 40 – 41 which sets out the current position for each risk, there were quite a lot risks in place for a long time, a lot of mitigation in place and wondered if the format may include the following - unmitigated, current and target score which would make it easier to see the up to date position.
Asked7 Aug 2023Audit Committee
Corporate Risk Register Update (May 2023)
Councillor Bearshaw asked if a bowtie analysis would give a picture of the current position and be easier to understand.
Named7 Aug 2023Audit Committee
Year End Internal Audit Opinion
In response to a question from Councillor Bearshaw, the Internal Audit Manager confirmed that the three year programme was currently on track and provided an overview on how the annual work programme was put together and that reports would be presented during the year. The Committee was advised that the annual work programme could be amended if required and that the main areas were covered on a three yearly basis.
Named7 Aug 2023Audit Committee
Internal Audit Follow Up Recommendations Report
In response to questions from Councillor Bearshaw on resolving recommendations, the Internal Audit Manager drew the Committee’s attention to Appendix 1 – Status of Agreed Internal Audit Recommendation which could relate to software, developments in service areas, resource, etc. It was explained that the manager’s comments provided an idea of what the delays were about. The recommendations would start a discussion for improvement and provide an enhanced control framework.
Named7 Aug 2023Audit Committee
Internal Audit Follow Up Recommendations Report
Councillor Bearshaw concurred with the comments made by Councillor de Winton.
Asked7 Aug 2023Audit Committee
Annual Fraud Progress Update 2022/2023
Councillor Bearshaw asked if there was a reason for the increase in fraud over the last 3 years. In response, the Senior Internal Auditor explained that compared to the 2021/2022 the results for 2022/2023 had seen a significant increase in volume detection which was largely due to the backlog of data matches which accrued during 2020/2021 ... view the full minutes text for item A102
Asked25 Jul 2023Regeneration and Development Panel
RD21
The Chair, Councillor Bearshaw asked how many organisations could drop out before the Partnership became unviable and the Assistant Director commented, that although he did not think that any Authorities would ... view the full minutes text for item RD21:
Minutes are the council's own written record of a meeting. They summarise what was said rather than recording every word, so each extract is shown exactly as the council published it, with the meeting it comes from.