That emergency closure be noted and the continued closure of Grafton multi-storey car park be authorised for the reasons set out in this report and for public safety reasons. 2. That the actions being taken by officers to secure the site, urgently investigate the issues, and provide alternative arrangements for those that require access be noted. 3. That the committee receive a report in July 2025 outlining the plans and recommendations for progressing the regeneration of the Grafton site. Call In: The call-in deadline for decisions will be 5.00pm on 13 June 2025
Word for word from the decision Adur & Worthing published for this meeting.Source: democracy.adur-worthing.gov.uk
nical Services Adur & Worthing Council Worthing Town Hall Chapel Road Worthing West Sussex BN11 1HA
GRAFTON STREET MSCP, WORTHING Brief Structural Note on Car Park Condition
1.0INTRODUCTION
We refer to an email from at Adur and Worthing Councils dated Tuesday 6th of May 2025, further a local failure of part of one of the car park deck support beams (over the first floor reference J115), our subsequent brief site visit and short email note of the following day Wednesday 7th of May 2025 (refer to email from ) and our subsequent Web meetings.
You have asked us to provide a short note capturing our feedback as outlined and discussed in the subsequent meetings. We therefore briefly describe the site and local failure that occurred, then further commentary itemised by the various areas of the site.
2.0BRIEF SITE DESCRIPTION
We trust the reader is familiar with the multi-storey carpark so shall not describe it in any great detail.
Grafton multi-storey car park, situated on the seafront (Marine Parade) in Worthing and accessed via Augusta Place and consists of various buildings/areas: • The main car park building has four/five above levels of car parking, • adjacent external hospitality space: Level 1, • below which is the Hollywood Bowl, ten pin bowling commercial unit, • The main car park also accesses three additional levels of car parking over the River Island retail shop unit (73-79 Montague Street): the northeast annex, • and via two high level bridges accesses two levels of carparking above further retail shop units (85-91 Montague Street): northwest annex. • Ground level service road/undercroft: delivery access to the adjacent Marks & Spencer store. • Within the main car park access to high level roof parking over an adjacent residential apartment building called Knightsbridge House.
HOP Consulting Limited HOP House, 41 Church Road Hove, BN3 2BE Registered 4402211 England T: +44 (0)1273 223900 E: [email removed] W: www.hop.uk.com Date: 15 May 2025
Your Ref:
Our Ref: AH/RG/16441-03
Page: 2 of 5
3.0RECENT LOCAL CONCRETE FAILURE
As noted above, we visited site on Wednesday the 7th of May to briefly review the car park deck support beam, where a large section of the lower inner flange of an I shaped precast, prestressed High Alumina Cement (HAC) concrete beam (ref: J115), above the first floor on the south elevation of the main car park had broken away partially falling onto the deck below. We refer to our short email note by of the same date and subsequent emails between and where the likely failure mechanism and immediate risks were outlined.
We also refer to the numerous previous condition/defect surveys and reports further visual inspection and highlight that this particular beam had been categorised as amber condition B beam of our Green, Red, Amber, Blue (GRAB) defect category system, hence marked as ‘minor damage i.e. cracking, spalled concrete, required monitoring’.
The unexpected failure seen (refer to the photo above) resulted in a large portion of concrete cracking away and partially falling to the deck below, breaking/snapping 3 internal pre-stressed steel strands. Although we were unable to measure this, as this had been removed by the time of our visit, it is estimated that this was over 4m in length and between 50-100mm wide and deep; hence a reasonably considerable section of the concrete, likely weighing in the region of 30 – 60kg.
We recommended that the car parking bays directly over this beam should be closed and heras fenced to avoid cars parking over the now weakened deck support structure. We also highlighted that this failure was typical of those that could continue to occur due to the ongoing corrosion of the steel strands within the deck support beams and it was very difficult to predict when further similar failures could happen.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.