CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Adur District Council / Worthing Borough Council
Joint Strategic Committee, Thursday 11 September 2025 at 6.30pm

Update on Grafton Mutli-Storey Car Park Following Structural Repair Option Study

Agreed Committee 2 papers

Joint Strategic Committee agreed this item on Thursday 11 September 2025. Below is the council's own wording, with the papers it was decided on.

ItemJSC/42/25-26

Resolved

That it be agreed that the car park should remain closed for public use whilst the work to transfer the site for redevelopment is pursued. 2. That progress on the marketing of the site for redevelopment be noted. 3. That as a gesture of goodwill, residents at Knightsbridge House be supported by creating seven temporary parking bays in the access bays to the Grafton car park, for the exclusive use of residents, prioritisation to be based on accessibility needs. Call In: The call-in deadline for decisions will be 5.00pm on 23 September 2025
Word for word from the decision Adur & Worthing published for this meeting. Source: democracy.adur-worthing.gov.uk

Follow this further

Built from Adur & Worthing's papers

What the report saysPro

Report to Joint Strategic Committee

Appendices

APPENDIX A Replacement/Repair Deck Option Drawings

Client: Adur & Worthing Councils Worthing Town Hall, Chapel Road, Worthing, West Sussex, BN11 1HA

Prepared by Checked by Approved by Status / Update Revision Date

SB AH AH First Issue P01 27.06.2025 AH CS AH Conclusion Table Update P02 29.07.2025 AH CS AH Next Steps updated P03 13.08.2025

Ref 16441-HOP-03-XX-RP-S-0004 2 Date: August 2025 Grafton Multi-Storey Car Park, Worthing Structural Repair of Car Park Deck Option Study

1.0INTRODUCTION 1.1 Background Grafton Street car park was constructed in the 1960’s and is at the end of service life. The structure comprises a concrete encased steel frame supporting precast concrete I beams, which in turn support an insitu concrete deck which has been cast on sacrificial precast concrete formwork.

Previous inspections have identified numerous areas where the precast concrete elements, particularly the I beams have deteriorated, with corroded steel reinforcement causing the concrete to crack and spall. More recently a large section of a concrete edge beam became dislodged prompting the closure of the car park on safety grounds.

Since this incident HOP have been invited to prepare potential repair and replacement options for the car park deck which can be used for costing purposes and inform the Council’s future planning decisions for the site. 1.2 Location Grafton Multistorey Car Park is located on the South Coast in the seaside town of Worthing, West Sussex. Its address is: Grafton Multistorey Car Park, Marine Parade, Worthing, BN11 3PZ.

Photograph 1.2a: Local Plan of Grafton Multi-Storey Car Park

Photograph 1.2b: Location within Worthing

Ref 16441-HOP-03-XX-RP-S-0004 3 Date: August 2025 Grafton Multi-Storey Car Park, Worthing Structural Repair of Car Park Deck Option Study

1.3Brief Description of the Structure We assume the reader of the report is familiar with the building so shall not describe in any detail. However, briefly the main car park structure appears constructed from a waterproofed surface over presumed concrete topping, on nominally profiled precast concrete (PC) planks, over precast concrete High Alumina Cement (HAC) I beams, all supported by a concrete encased steel frame. The access ramps are formed from insitu reinforced concrete (RC) slabs and end/edge beams. There is a perimeter downstand beam, which appears to be insitu RC, but could contain encased steelwork. The external cladding of the main car park appears to be profiled PC panels, which presumably are supported/restrained from the perimeter downstand edge beams. There is some annex car parking behind the main car park structure (on the North), built over lower- level retail units and accessible via bridges from the upper levels of the main car park. These annexes have metal edge barrier protection, rather than the PC cladding panels.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
2025 08 13 16441-HOP-03-XX-RP-S-0004 P03 /42/25-26Report 3 MB DownloadRead as text
PDF
Update on Grafton Mutli-Storey Car Park Following Structural Repair Option StudyAgenda 305 KB Download

At this meeting

Whole meeting

Who was there

13 of 13 attended
SC
Councillor Sophie CoxChair, present
RG
Councillor Rita GarnerVice-Chair, present
ÖB
Councillor Ödül BozkurtWorthing Member, present
DF
Councillor Dom FordWorthing Member, present
JT
Councillor John TurleyWorthing Member, present
VW
Councillor Vicki WellsWorthing Member, present
RW
Councillor Rosey WhorlowWorthing Member, present
JG
Councillor Jeremy GardnerAdur Member, present
LC
Councillor Lee CowenAdur Member, present
BA
Councillor Becky AllinsonAdur Member, present
SJ
Councillor Saffa JanAdur Member, present
AH
Councillor Andrew HarveyAdur Member, present

All 13 on the meeting page

More from Adur & Worthing Joint Strategic Committee

All decisions
MeetingDecisionOutcome
8 Sep 2026 MinutesResolved : that the minutes from the Joint Strategic Committee meeting held on 14 July 2026 be approved as the correc... Approved Open
8 Sep 2026 1st Quarter Revenue Monitoring Report 2026/27That it be noted that the report and projected outturn position for the Joint Committee, Adur District Council and Wo... Noted Open
8 Sep 2026 Joint 1st Quarter Capital Investment Programme & Projects Monitoring 2026/27That requested approvals as detailed within the project specific paragraphs in section 7.1 be agreed in relation to A... Approved Open
8 Sep 2026 Refreshing the economic strategy for Adur and Worthing (and Arun), 2026-31That the Arun, Adur and Worthing Economic Draft Strategy 2026 - 2031 be approved and the five economic themes and dis... Approved Open
8 Sep 2026 Fair, Green & Local Plan update: Introducing the Pride in Place missionThat the revision of the Thriving Together mission to Pride in Place be approved 2. That the proposed actions and re-... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies