Helensburgh & Lomond Area Committee decided this item on Tuesday 1 October 2002. Below is the council's own wording, with the papers it was decided on.
Decision The Helensburgh and Lomond Area Committee is committed to revitalise the Pier in line with the report presented, including dredging the approach for fast ferries, tripper boats and cruise liner tenders. This would allow Helensburgh to capitalise on its close proximity to the National Park, would improve tourism in the Area and would allow for the possibility of a new commuter route to Glasgow. These are priority themes in the Area Strategy. The appropriate officers were instructed to produce a detailed report on the costing and timescale for the whole project. The officers were also asked to explore gaining match funding from European Objective 2 (Transitional Funding) and Scottish Enterprise Dunbartonshire and any other potential sources to allow the whole project to be accomplished. (Reference: Report by Principal Engineer dated 18 September 2002).
Word for word from the decision Argyll and Bute published for this meeting.Source: www.argyll-bute.gov.uk
The purpose of this report is to update Members on the current position regarding the condition of Helensburgh Pier and approaches and give indicative costs for refurbishment and dredging to allow the pier to be used by a wider range of vessels.
Recommendation
The Committee is asked to note the contents of the report.
3 PIER STRUCTURE
The derelict section of the pier was damaged by fire a number of years ago. Although the decking and deck bearers were badly damaged, the main piles and sub-structure were generally unaffected by the fire.
Since the sub-structure in this section is still structurally sound and contributes to the overall strength of the pier, it is not recommended that it be demolished.
Refurbishment would involve full scale replacement of deck bearers and deck boards together with rebuilding the stairway used for access by smaller vessels. There may also be a need for a certain amount of repair work to the sub-structure.
The estimated cost of refurbishment is £150,000. Part of the works could include for strengthening sections of the superstructure to allow a replacement building to be constructed on this section of the pier. These additional works are likely to add approximately £20,000 to the estimated cost.
4 DREDGING OF APPROACH CHANNEL
A hydrographic survey of the approach channel was carried out in 1999 by Clydeport with a view to vessels calling at the pier during the Tall Ships race. The results of the survey showed that the approach channel could cater for vessels with a draft of 1.5m at most states of the tide. However, the Kenilworth, with a draft of 1.5m, currently experiences difficulties berthing at the pier at times of exceptionally low tides.
In order to accommodate the larger vessels and achieve a draft of 3.0m at all tide states, the quoted cost for full dredging of the channel was £160,000. This price was based on a dredger already working in the Clyde area at the time and therefore the establishment costs were much reduced. It is estimated that if the dredging company were engaged purely to carry out work at the pier, the cost would be £200,000. It is recommended that, because of the high cost of establishment, the works be deferred until there is a dredger working in the Clyde area. The approach was last dredged in the 1980s with minor scraping of the channel carried out in 1995 to even out minor irregularities on the sea bed. If funding was allocated to the works, it is recommended that, because of the high cost, the channel be dredged to the levels proposed for the Tall Ships. This would mean that dredging would not be needed again for at least 10 years.
Although scraping the channel using a tug and blade is much cheaper and can be effective for flattening high spots, it is not considered an effective way of reducing the level of the approach, since the scraped material has to be deposited in the near vicinity.
When full dredging is carried out, the material is removed from the area and deposited in designated areas in the Clyde estuary, subject to the approval of the Marine Laboratory.
5 EXPANSION OF USE OF PIER BY OTHER VESSELS
The main objective of refurbishing the pier structure and approaches would be to encourage wider tourist use of the pier, attract use by different vessels and increase the number of visitors to the town.
(1) Kenilworth & Waverley
Following dredging, these vessels could use the pier safely at all states of the tide.
(2) Tenders from Cruise Liners
These tenders are generally less than 20 metres long and have a draft of between 1 and 1.5 metres which could easily be accommodated at all tidal states.
(3) High Speed Ferry Link
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Helensburgh & Lomond Area Committee at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
Area performance report - fq1 2026/27Decision The Helensburgh and Lomond Area Committee noted the performance and supporting commentary as presented. (Ref...
Supporting communities fund 2026/27Decision The Helensburgh and Lomond Area Committee agreed that the 18 applications, marked as Award’ and ‘Partial Awa...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.