Resolved
Agreed that no objections be raised to the proposal. Arising from this, and with reference to the Minute of the meeting of the Area Committee held on 3 April 2002, the Senior Planning Officer was instructed to submit a report to the meeting on 14 May in regard to progress on the production of an ad hoc development policy for Loch Etive. (Ref: Report dated 10 March 2003 by the Head of Development and Building Control, submitted). 02/02139/DET Orange PCS Ltd – Replacement of existing flagpole with telecommunications flagpole – Harbour Heights, Western Road, Tobermory, Isle of Mull It was agreed that consideration of this application be continued to the meeting on 14 May. (Ref: Report dated 18 February 2003 by the Head of Development and Building Control, submitted). 02/02180/DET Melfort Pier and Harbour – Erection of store and laundry – Melfort Pier and Harbour, Loch Melfort, Kilmelford. Approved, subject to (a) conditions 1, 2, and 4-6, as set out in the report dated 19 March 2003 by the Head of Development and Building Control; (b) the amendment of condition 3 to read ‘No equipment, machinery or materials whatsoever shall be brought onto the site for the purposes of the development hereby approved until a protective fence has been installed on site, for the purpose of protecting the trees protected by the existing Tree Preservation Order, in accordance with a scheme previously approved by the Planning Authority. Those details, in the form of a plan(s), of the proposed position, type and means of construction of a protective fence, shall have been first submitted to and approved in writing by the Planning Authority. The protective fencing shall remain in place on site until such time as all equipment, machinery and surplus materials have been removed in their entirety from site. For the duration of the approved works on this site nothing shall be allowed to be stored, disposed of, or placed, nor any fires lit, ground levels altered, or any excavation made (including the addition or removal of any topsoil or sub soil), or vehicles driven across that land, within the area hereby protected, without the written consent of the Planning Authority’; and (c) the inclusion of a note to the applicant to read ‘The applicant is hereby advised that the Planning Authority consider that the Melfort Pier and Harbour site has reached a level of development whereby it is unlikely that further new development will be able to be sanctioned.’ (Ref: Report dated 19 March 2003 by the Head of Development and Building Control, submitted). 03/00028/OUT George Summers McKnight – Site for the erection of a dwelling house – No.1 Holding, Beechwood, Barcaldine, By Oban. Refused for the reasons set out in the report dated 11 March 2003 by the Head of Development and Building Control. (Ref: Report dated 11 March 2003 by the Head of Development and Building Control, submitted). 03/00094/DET Robert and Hilary Latimer – Erection of a dwelling house – Harbour Cottage, Toberonochy Quarry, Toberonochy, Isle of Luing. Refused for the reasons set out in the report dated 20 March 2003 by the Head of Development and Building Control. (Ref: Report dated 20 March 2003 by the Head of Development and Building Control, submitted).