Resolved
Decision Agreed to endorse the Council’s formal response to the consultation, which was to offer no objections to the development. (Reference: Report by Head of Development & Building Control dated 17 September 2003)
Helensburgh & Lomond Area Committee agreed this item on Tuesday 7 October 2003. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision Agreed to endorse the Council’s formal response to the consultation, which was to offer no objections to the development. (Reference: Report by Head of Development & Building Control dated 17 September 2003)
The Council have been formally consulted by the Scottish Executive as a neighbouring authority on the above application submitted by Airtricity. This report sets out the proposed response to the development and seeks Members’ endorsement.
Members are asked to consider the report and endorse the Council’s formal response to the consultation, which is to offer no objections to the development.
3.0Detail
In normal circumstances applications for planning permission are made directly to the appropriate local authority. However, under Section 36 of the Electricity Act 1989, a generating station (including wind farms) with a capacity exceeding 50 mega watts (MW) can only be constructed, extended or operated with consent granted by the First Minister/Scottish Executive.
Under the 1989 Act and the associated Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2000, the Council has been consulted on a proposed wind farm at Devol Moor, Greenock. The consultation consists of an Environmental Statement (ES), which sets out the elements of the scheme together with an assessment of the various impacts of the proposal.
Wind farms can have a variety of landscape, visual and other physical impacts. In the case of Argyll and Bute the key factor is considered to be the visual impact.
The development consists of 23 turbines arranged in a roughly circular pattern each with a capacity of 2.5 MW. The site is on the eastern slopes of Corlick Hill and Burnhead Moor in the Renfrewshire Heights, approximately 2.3km south of the centre of Greenock. The site extends to 270 hectares and will be seen from directly opposite Helensbugh pier car park. The nearest turbine when viewed from Helensburgh will be 8.7km away.
The turbines consist of a 60-metre tower with nacelle and hub and three rotar blades 40 metres long. The maximum height of each turbine to the blade tip will be 100 metres.
Other works include transformers for each turbine, access tracks, sub-station, wind monitoring masts, borrow pits for the extraction of stone and a temporary construction compound.
As indicated above the key factor in terms of Argyll and Bute will be the visual impact. Within the ES the site is assessed from three key viewpoints within this area namely the Henry Bell monument on Helensburgh seafront, the Gareloch and Kilcreggan. In this case the viewpoints will be respectively 8.7km, 19.3km and 8.4km away from the site.
Renfrewshire Heights are a rolling upland hill mass around which the Firth of Clyde runs. As viewed from Helensburgh seafront the Heights appear as low undulating hills with a strong linear form. The view from Kilcreggan is similar albeit at a less direct angle. From the Gareloch the view is more distant, at an oblique angle and viewed, in part, over the mass of the Faslane Base. Consequently, any visual impact will be much less significant.
The proposed wind farm will be visible from Helensburgh seafront and the Gareloch as 23 hubs and 23 tips. The turbines will be visible in a regularly spaced group seen against the skyline. From Kilcreggan 21 hubs will be visible and 23 blades tips.
I:\MS OFFICE/WORD/DEVCON2003/WR-DEVOL MOOR In the ES the visual impact significance is classified under four headings: major, moderate, minor and negligible. As defined, major means that the development results in substantial changes of view whilst negligible refers to hardly perceptible or no changes to view.
The layout of the wind farm and its skyline position on what is a linear landform will clearly change the view from both Helensburgh and Kilcreggan. In the ES this is assessed as a moderate impact i.e. “the development results in clearly visible changes to the view.”
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Formal Consultation by the Scottish Executive on a Section 36 Appliction for a Proposed Windfarm at Devol Moor, GreenockReport | 54 KB | DownloadRead as text |
PDF |
WindfarmpicReport | 1.5 MB | Download |
Follow Helensburgh & Lomond Area Committee at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 8 Sep 2026 | Police scotland updateDecision The Helensburgh and Lomond Area Committee noted the information provided. (Reference: Report by Police Scotl... | Noted | Open |
| 8 Sep 2026 | Clyde transformation programme & clyde land acquisition overviewDecision The Helensburgh and Lomond Area Committee noted the information provided. (Reference: Verbal update from Cly... | Noted | Open |
| 8 Sep 2026 | Charts (argyll and the isles)Decision The Helensburgh and Lomond Area Committee noted the information provided. (Reference: Presentation by Chair,... | Noted | Open |
| 8 Sep 2026 | Area performance report - fq1 2026/27Decision The Helensburgh and Lomond Area Committee noted the performance and supporting commentary as presented. (Ref... | Noted | Open |
| 8 Sep 2026 | Supporting communities fund 2026/27Decision The Helensburgh and Lomond Area Committee agreed that the 18 applications, marked as Award’ and ‘Partial Awa... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.