It was agreed that consideration of this application be continued to the next meeting to allow the Roads Service Department to investigate further the issue of the sight lines. (Ref: Report dated 12 th April 2005 by the Head of Planning, submitted)
Word for word from the decision Argyll and Bute published for this meeting.Source: www.argyll-bute.gov.uk
DEVELOPMENT SERVICES Local Member - Councillor Alistair MacDougall PLANNING APPLICATION REPORT Date of Validity - 29.09.2004 OBAN, LORN AND THE ISLES Committee Date - 4th May 2005
12th April 2005
Reference Number: 04/01916/DET Applicants Name: Simon Proud Application Type: Detailed. Application Description: Erection of Dwellinghouse and garage. Location: Land South East of Kilmore Dervaig Isle of Mull
(A ) THE APPLICATION
Development Requiring Express Planning Permission.
• Erection of dwellinghouse • Formation of vehicular access
(B ) RECOMMENDATION
The application is recommended for refusal
(C ) DETERMINING ISSUES AND MATERIAL CONSIDERATIONS
The site lies at the eastern extremity of an area of residential development on the eastern periphery of Dervaig and adjacent to the B8073 Dervaig to Tobermory public road.
Existing Development Plan Policy:-
There are no policy objections to this proposal. It is consistent with the Adopted Mull, Coll and Tiree Local Plan (POL HO 7), and is included within the settlement area for Dervaig in the Consultative Draft and also the Finalised Local Plan.
Servicing and Infrastructure:-
There are no constraints upon the site with regard to water or sewerage as there are services in reasonable proximity to the site.
The vehicular access proposals are however unacceptable. The Area Roads Manager has indicated that the proposed development requires sight lines of 70m X 2.4m in both directions at the vehicular access point. The sight lines available are 46m X 2.4m (northeast) and 52m X 2.4 (southwest). The achievable visibility splays are clearly well below the standard required for the kind of development that is proposed.
Improvements to the sight lines are not a reasonable possibility in this instance. The topography of the road and its alignment at this location both preclude the possibility of improvements. There is a large rock outcrop to the southwest (Tobermory side) with poor horizontal alignment and to the northeast the horizontal and vertical alignment of the road both preclude the provision of adequate sightlines.
(D ) CONCLUSION
That it is not possible to provide a safe means of vehicular access to the proposed development.
F:\MODERNGOV\DATA\PUBLISHED\INTRANET\C00000245\M00001927\AI00022282\1916WRES1204050.DOC 1 Angus J Gilmour Head of Planning
Contact: Ian McIntyre. 01631 567951
F:\MODERNGOV\DATA\PUBLISHED\INTRANET\C00000245\M00001927\AI00022282\1916WRES1204050.DOC 2 REASONS FOR REFUSAL RELATIVE TO APPLICATION 04/01916/DET
Reason: The proposed vehicular access would not provide a safe means of access to the site in that the required sight lines of 70metres X 2.4metres in each direction formed from the centre line of the proposed access are unachievable. The horizontal and vertical alignment of the road at this location and the presence of a large rock outcrop combine to prevent the provision of adequate sight lines in either direction from the proposed access point.
F:\MODERNGOV\DATA\PUBLISHED\INTRANET\C00000245\M00001927\AI00022282\1916WRES1204050.DOC 3 APPENDIX RELATIVE TO CLICK HERE TO ENTER APPLICATION NO.
A. POLICY OVERVIEW
In terms of Section 25 of the Act the following Development Plan Policies are applicable:
Mull, Coll and Tiree Local Plan
HO 7 The settlement patterns of Dervaig and Lochdon require that infill development in these settlements be restricted to sites identified by the Council.
(B) OTHER MATERIAL CONSIDERATIONS
(a) Site History
No site history
(ii) Consultations
Response Date Comment Area Roads Engineer 08.12.2004 Refusal – inadequate sight lines Scottish Water 18.10.2004 No objections. Public Protection Unit 15.10.2004 No objections.
(iii) Publicity and Representations
Advert Type : Article 9 Vacant Land. Closing Date: 21.10.2004
Follow Oban Lorn & The Isles Area Committee at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
Roads and infrastructure updateDecision The Oban, Lorn and the Isles Area Committee noted the contents of the report. (Reference: Report by Executiv...
Oban PVA Flood Risk Management UpdateDecision The Oban, Lorn and the Isles Area Committee:- 1) considered the contents of this report; and 2) noted the co...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.