Planning Application 05/02439/DET, Scottish Water, Bullwood Quarry, Dunoon

Agreed Committee 1 paper

Bute and Cowal Area Committee agreed this item on Tuesday 4 July 2006. Below is the council's own wording, with the papers it was decided on.

Item8d

Resolved

Decision The Committee agreed that a PAN 41 Hearing with no recommendations, be held prior to the determination of this application. Before a date for this Hearing is set, the applicant Scottish Water be required by a direction under Article 13 of the Town and Country Planning (General Development Procedure) (Scotland) Order 1992 to produce. A photomontage on a 3 dimensional basis showing the development within Bullwood Quarry with views being from the main road, from the sea and from the two adjoining properties, this also to illustrate the impact of the high chimney stack and also showing what the lighting of the development would look like in periods of darkness. That also copies of the plans which are the subject of this application be available at the hearing, with copies made available for all Members to view well in advance of this Hearing That the following papers be produced by Scottish Water as a pack for Members for consideration in advance of the hearing. That the contents of those papers recognise the requirements suggested as being conditions to be attached to the application if granted, namely:- Report on investigation and assessment of any land contamination. Report with details on any proposed remediation plan. Production of an environmental action plan that will address issues of foul drainage, contamination and dust mitigation measures with details of monitoring methods. Production of a dust management plan as per the conditions set down in the planning report. Production of a noise management plan as per the conditions set down in the planning report. Production of the proposed lighting scheme. Production of details on all building and structure finishes including arrangements for covering all facilities to reduce smell and airborne bacteria. Production of a plan with photo montage details and management plan on all boundary finishes as per conditions 15, 16, 17, 18, 19, 20 and 22 in the planning report. Production of a geology report of the site together with detail of the methods proposed for excavation of rock and construction with proposed vibration controls including the means of monitoring and recording the effect of vibration on adjoining premises together with the position and type of monitoring equipment to be used. The geology report is also to assess the type of rock and whether this rock can be excavated without blasting with an assessment on the likely impact on adjoining properties of an alternative to blasting. See condition 28, 29 and 30 in the planning report. The production of an odour management plan as set down in the planning report and as requested in writing by the Councils Environmental Health Officer and Public Protection Service.
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Bute and Cowal Area Committee

DEVELOPMENT SERVICES Local Member - Councillor- J.R. Walsh PLANNING APPLICATION REPORT Date of Validity - 6th December 2005 Bute and Cowal Area Committee Date - 4th July 2006

26th June 2006

Reference Number: 05/02439/DET Applicants Name: Scottish Water Solutions Application Type: Detailed Application Description: Stabilisation of rockface; Erection of Waste Water Treatment Works, ancillary development and alterations to existing access: Location: Bullwood Quarry, Bullwood Road, Dunoon

(A ) THE APPLICATION

Development Requiring Express Planning Permission.

• stabilisation of rockface; • earthworks and levelling within the quarry floor to create a base at 8.50 metres above ground level; • erection of Waste Water Treatment Works comprising erection of main treatment building (green–coloured profiled metal cladding roof and external walls), liquor pumping station, odour control plinth with a 23.0 metre high odour control stack, final effluent booster set, covered Biological Aerated Flooded Filters (BAFF) plant incorporating backwash pumps, air blowers, twin storage tanks and pumps (6.5 metres high) for thick and thin sludge, Calcium Nitrate Storage Tank and transformer ; • alterations to access from the A815 Bullwood Road with new access gates leading to a hardstanding tarmac access area with turning areas and access to main plant and buildings; • a 2.4 metre high security fence across the front of the site set back from the footway; • earthworks around the main treatment building, the BAFF plant and front of the site; • a 2.0 metre high protective bund against the BAFF plant for falling rock prevention.

Other Specified Operations

Laying of outfall pipe to below Mean Low Water Spring.

(B ) RECOMMENDATION It is recommended that, subject to a discretionary hearing, planning permission be Granted subject to the standard condition and reason and the following conditions and reasons together with ‘notes to the applicant’ set out overleaf.

(C ) DETERMINING ISSUES AND MATERIAL CONSIDERATIONS

The proposal relates to the development of a new Waste Water Treatment Works serving the catchment areas of Dunoon and Sandbank. It involves the erection of a new building for which there is a locational need and the infilling and landscaping of an obsolete quarry. The applicant has stated that there is a legislative requirement to upgrade wastewater collection and treatment facilities for Dunoon and Sandbank and that this site has been chosen using a range of criteria. While the proposed buildings and plant would have a limited visual impact, this could be mitigated by the use of dark colours and effective tree and shrub screen planting. The issue of odour and noise control will be addressed through the imposition of conditions recommended by the Public Protection Service.

F:\MODERNGOV\DATA\PUBLISHED\INTRANET\C00000242\M00002595\AI00030025\02439WRSCOTTISHWATERWWTWBULLWOODQUARRYDUNOON0.DOC 1 It is considered that the proposal would not have a significantly detrimental visual impact largely due to the design and colour of the buildings and plant, position within the quarry and partial screening. Subject to certain safeguarding conditions, it would not have an adverse effect upon the amenity of the area in terms of noise and disturbance.

Angus J Gilmour Head of Planning Services

Case Officer: B. Close 01369-708604 Area Team Leader D. Eaglesham 01369-708608

"In reaching my assessment on this application, I have had regard to the documents identified in brackets above which are available for public inspection in terms of the Local Government (Access to Information) Act 1985".

F:\MODERNGOV\DATA\PUBLISHED\INTRANET\C00000242\M00002595\AI00030025\02439WRSCOTTISHWATERWWTWBULLWOODQUARRYDUNOON0.DOC 2 CONDITIONS AND REASONS RELATIVE TO APPLICATION 05/02439/DET

Conditions

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Planning Application 05/02439/DET, Scottish Water, Bullwood Quarry, DunoonReport 242 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

10 of 10 attended
BC
Councillor Brian ChennellChair, present
DC
Councillor Douglas CurrieMember, present
GM
Councillor Gordon McKinvenMember, present
AL
Alan LothianOfficer, present
RM
Councillor Robert MacintyreMember, present
BM
Councillor Bruce MarshallVice-Chair, present
JM
Councillor James McQueenMember, present
LS
Councillor Len ScoullarMember, present
IS
Councillor Isobel StrongMember, present
DW
Councillor Dick WalshMember, present

On this subject at Argyll and Bute

Search all
  1. Planning Application 05/02439/DET, Scottish Water, Bullwood Quarry, DunoonThis decision
  2. Planning and infrastructure act 2025 - objection to energy consent applicationsNoted
  3. Tsl contractors ltd: detailed planning application for the erection of residential development comprising 97 residential units and a commercial unit (class 1) with all associated external works and landscaping: land north west of isle of mull hotel, craignure, isle of mull (ref: 22/01418/pp)Agreed
  4. Mr paul david barker: application for discharge of section 75 obligation relative to planning permission 97/01526/det: melda house, kilfinan, by tighnabruaich (ref: 22/00921/pp)Agreed
  5. Bute island foods ltd: erection of food production facility and associated works (revised proposal relative to planning application reference 20/00333/pp to incorporate removal of new access onto barone road, use of existing access onto meaAgreed
  6. Link group ltd: application under section 75a(2): discharge of planning obligation relative to planning permission reference: 11/02248/pp: land north of dunstaffnage mains farm, dunbeg (ref: 18/00422/pp)Agreed

More from Argyll and Bute Bute and Cowal Area Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Charts (argyll and the isles)Decision The Bute and Cowal Area Committee considered and noted the information provided in the presentation. (Refere... Noted Open
1 Sep 2026 Area committee quarterly performance reports fq1 2026/27Decision The Bute and Cowal Area Committee noted the performance and supporting commentary as presented. (Reference: ... Noted Open
1 Sep 2026 Supporting Communities Fund 2026/27Decision The Bute and Cowal Area Committee agreed that the 20 applications, marked as ‘Award’ or ‘Partial Award’ with... Agreed Open
1 Sep 2026 Roads and infrastructure services updateDecision The Bute and Cowal Area Committee noted the contents of the report. (Reference: Report by Executive Director... Noted Open
1 Sep 2026 Cruach mhor and clachan flats windfarm trustsDecision The Bute and Cowal Area Committee noted these updates, which are the most recent of the annual updates requi... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies