Resolved
Decision The Committee agreed that a PAN 41 Hearing with no recommendations, be held prior to the determination of this application. Before a date for this Hearing is set, the applicant Scottish Water be required by a direction under Article 13 of the Town and Country Planning (General Development Procedure) (Scotland) Order 1992 to produce. A photomontage on a 3 dimensional basis showing the development within Bullwood Quarry with views being from the main road, from the sea and from the two adjoining properties, this also to illustrate the impact of the high chimney stack and also showing what the lighting of the development would look like in periods of darkness. That also copies of the plans which are the subject of this application be available at the hearing, with copies made available for all Members to view well in advance of this Hearing That the following papers be produced by Scottish Water as a pack for Members for consideration in advance of the hearing. That the contents of those papers recognise the requirements suggested as being conditions to be attached to the application if granted, namely:- Report on investigation and assessment of any land contamination. Report with details on any proposed remediation plan. Production of an environmental action plan that will address issues of foul drainage, contamination and dust mitigation measures with details of monitoring methods. Production of a dust management plan as per the conditions set down in the planning report. Production of a noise management plan as per the conditions set down in the planning report. Production of the proposed lighting scheme. Production of details on all building and structure finishes including arrangements for covering all facilities to reduce smell and airborne bacteria. Production of a plan with photo montage details and management plan on all boundary finishes as per conditions 15, 16, 17, 18, 19, 20 and 22 in the planning report. Production of a geology report of the site together with detail of the methods proposed for excavation of rock and construction with proposed vibration controls including the means of monitoring and recording the effect of vibration on adjoining premises together with the position and type of monitoring equipment to be used. The geology report is also to assess the type of rock and whether this rock can be excavated without blasting with an assessment on the likely impact on adjoining properties of an alternative to blasting. See condition 28, 29 and 30 in the planning report. The production of an odour management plan as set down in the planning report and as requested in writing by the Councils Environmental Health Officer and Public Protection Service.