Resolved
Decision That the Review not be upheld on the basis that:- 1. The proposed development would result in increasing the number of vehicles entering and leaving the traffic stream on the A83 (T) at a point where visibility is restricted, thus creating interference with the safety and free flow of the traffic on the trunk road. 2. The proposed development would result in an intensification of waiting and right turning manoeuvres from the A83 (T) trunk road at a location where forward visibility for approaching westbound traffic on the trunk road is substandard thus creating interference with the safety and free flow of the traffic on the trunk road. 3. The development conflicts with Policy LP TRAN 4 of the adopted Argyll and Bute Local Plan 2009 in so much as the lengthy sub standard private access which already serves 5 dwellings would need to be brought up to adoptable standard to serve the development proposed; being suitably surfaced and provided with appropriate passing places, and over which the applicant has no control, given that land required for such improvement lies beyond the application site and outside the ownership of the applicant. 4. The proposal conflicts with Policy LP BUS 1 of the adopted Argyll and Bute Local Plan as the office element of the proposal would erode the residential character of the area and adversely affect local residents and the amenity of the area though an increase in traffic levels and the introduction of commercial activity, which would be a source of nuisance and disturbance to residents contrary to the interest of the residential amenity of the area. 5. Having regard to the combined scale of the built development associated with the provision of the residential and office accommodation proposed along with the associated parking area, their location and the consequential loss of some mature trees which contribute to the setting of the settlement, together with elements of the design and materials of the buildings which are uncharacteristic of its surroundings, such as projecting glazed/timber extension to the dwelling and the metal profiled roof of the office building, it is considered that the proposal in its siting and design fails to accord with LP ENV 19 and Appendix A of the adopted Argyll and Bute Local Plan 2009.