Resolved

Decision The Committee noted the report by the Bute and Cowal Streetscene Manager with concern. (Reference: Report by the Bute and Cowal Streetscene Manager dated 18 th March 2010 – submitted)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Bute and Cowal Area Committee

Background

In light of 3 fatalities within graveyards in England from 1991 inc: a 9 year old girl and 6 year old boy, Council’s were forced to take action to ensure that headstones were inspected and made safe, A programme of inspecting and lowering of dangerous headstones commenced in Argyll & Bute cemeteries in 1997. These actions were seen as a priority by the Council as it was noted that on the 3 occasions of the fatalities within cemeteries it was the local authority who was prosecuted by the HSE (Health & Safety Executive) as the Burial Authority and not the lair owner who is responsible for the upkeep of their headstone.

Letters were subsequently sent out to lair owners who could be identified (a large number of lair owners could not be traced) advising that the lowering of headstones was carried out in light of HSE reports on the fatalities in England.

The decision to refrain from lowering headstones was made by the Director of Roads & Amenity Services after pressure from both members of the public and Council members in 2007.

Funding for headstone re-erection was provided in 2008/09 to allow in-house operatives to carry out repairs with 2 additional staff deployed to assist in the programme in B&C. This funding has been used up and in B&C we are carrying out repairs (re-erecting) during winter months with in-house staff when possible.

Headstone permissions by A&BC since the year 2000 have insisted on securing headstones to foundations by means of metal dowels (see attached detail), inspections have shown that some more recent headstones have not been erected in accordance by NAMM (National Association of Monumental Masons) regulations, these have been reported to the lair owner and letters sent out to the offending Companies to make good.

A large number of Headstones in the Bute and Cowal area are still deemed to be dangerous and a recent round of inspections highlights these numbers as below.

Where a headstone is found to be loose on initial inspection, a topple testing device that allows pressure up to 35kg to be exerted will be used, normally headstones that are loose will not require this amount of pressure to be used before movement is noticeable. (See attached photos)

2. UPDATE

2.1COWAL AREA to Fri 19th Mar 2010 • Dunoon Cemetery: (2749) re-erected to date, to be repaired (551) laid down

* Cowal Cemetery: (250) re-erected to date, all repairs completed.

* Inverchaolain Cemetery: (100) re-erected to date, all repairs completed.

• KIlmun Cemetery: (240) re-erected to date, (100) still to be repaired, laid down, top tier only, slope created safety issues with gantry equipment. Mechanical equipment would be required to complete this section.

• Lochgoilhead Cemetery: No repairs to date (65) still to be repaired, standing.

• Cairndow Kilmorich Cemetery: No repairs to date (38) still to be repaired, standing.

• Strachur Cemetery: No repairs to date (116) still to be repaired standing.

• Strathlachlan Cemetery: No repairs to date (14) still to be repaired 3 have fallen down.

• Glendaruel Kilmodan Cemetery: No repairs to date (74) still to be repaired, standing.

• Colintraive Cemetery: No repairs to date (9) still to be repaired, standing.

• Millhouse Cemetery: No repairs to date (232) still to be repaired, standing.

• Kilbride Cemetery: No repairs to date, numbers requiring repairs to be confirmed.

2.2BUTE AREA to Fri 19th Mar 2010

• Kingarth cemetery: (27) re-erected to date, (94) still to be repaired, standing. (21) To be repaired laid down.

• Barone Cemetery: No repairs to date (151) still to be repaired, standing.

• North Bute Croc an Raer Cemetery: (145) re-erected to date, still to be repaired (209) standing.

• Rothesay Townhead Cemetery: (252) re-erected to date, (386) still to be repaired standing, (150) still to be repaired, laid down.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Report on progress of Bute & Cowal HeadstonesReport 76 KB DownloadRead as text
PDF
headstone fix_20100322113442Report 51 KB Download
PDF
headstone pic_20100325094413Report 6.1 MB Download

At this meeting

Whole meeting

Who was there

7 of 13 attended
JD
John DuncanOfficer, expected
RM
Councillor Robert MacintyreMember, present
DM
Dinah MackayOfficer, expected
BM
Councillor Bruce MarshallChair, present
AM
Councillor Alister McAlisterMember, present
SM
Stuart McLean - Scottish Fire and RescuePublic, expected
AM
Councillor Alex McNaughtonMember, present
JM
Councillor James McQueenMember, apologies
NM
Nigel MitchellPublic, expected
LS
Councillor Len ScoullarVice-Chair, present
RS
Councillor Ron SimonMember, present
IS
Councillor Isobel StrongMember, present

All 13 on the meeting page

On this subject at Argyll and Bute

Search all
  1. Report on progress of Bute & Cowal HeadstonesThis decision
  2. Argyll and bute education service - progress and impact report 2025-2026 and strategic plan 2026-2029Noted
  3. Argyll and bute education service progress and impact 2024-2025 and strategic plan 2024-2026Noted
  4. Argyll and bute hscp equalities mainstreaming progress report 2021-2025 and equalities outcomes 2025-2029Noted
  5. Argyll and bute housing emergency - progress reportNoted
  6. Progress on Argyll and Bute Climate HubNoted

More from Argyll and Bute Bute and Cowal Area Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Charts (argyll and the isles)Decision The Bute and Cowal Area Committee considered and noted the information provided in the presentation. (Refere... Noted Open
1 Sep 2026 Area committee quarterly performance reports fq1 2026/27Decision The Bute and Cowal Area Committee noted the performance and supporting commentary as presented. (Reference: ... Noted Open
1 Sep 2026 Supporting Communities Fund 2026/27Decision The Bute and Cowal Area Committee agreed that the 20 applications, marked as ‘Award’ or ‘Partial Award’ with... Agreed Open
1 Sep 2026 Roads and infrastructure services updateDecision The Bute and Cowal Area Committee noted the contents of the report. (Reference: Report by Executive Director... Noted Open
1 Sep 2026 Cruach mhor and clachan flats windfarm trustsDecision The Bute and Cowal Area Committee noted these updates, which are the most recent of the annual updates requi... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies