Resolved
Decision Subject to notification to the Scottish Ministers and amendment to the proposal description to the effect that this application is for demolition of a former village hall now occupied as a dwelling, agreed to grant Planning Permission subject to the following conditions and reasons:- 1. That the development to which this permission relates must be begun within three years from the date of this permission. Reason: In accordance with Section 58 of the Town and Country Planning (Scotland) Act 1997. 2. The development shall be implemented in accordance with the details specified on the application form dated 14 th September 2010 and the approved drawing reference numbers: 1705.03, 1705.01 RevB received 31 st January 2011, 1705.02 RevA , unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 3. No development shall commence, including any site works, until details are submitted for the prior written approval of the Planning Authority of a surface water drainage scheme (including any works to the existing watercourse through the site) that shall incorporate the basic principles of Sustainable Urban Drainage Systems identified in ‘Planning Advice Note 61’ and which shall provide details of surface water run-off, measures to slow down run off; methods of treatments and its release into the system, unless prior written consent for variation is obtained in writing from the Planning Authority. The scheme, as may be approved shall be implemented commensurate with this development at a timescale as may be agreed in writing with the Planning Authority. Reason : In order to provide for sustainable development of the site, and to protect existing and proposed development from the effects of potential increased surface water run-off. 4. No works shall commence until full details of the provision of alternative accommodation for the bat population within the site (including the design and location of the bat buildings, boxes and roosts) and a management regime for the maintenance of this accommodation have been submitted to and approved in writing by the Planning Authority in consultation with Scottish Natural Heritage. These details shall generally be in accordance with the Protected Species Survey submitted by [name removed] dated 12 th December 2010. Reason: In the interests of nature conservation and t o ensure that there are sufficient alternative bat roosts within the development. 5. The visibility splays of 75.0 x 2.5 metres in both directions onto the A815 from both the existing access track and widened existing access shall be maintained in perpetuity free from all obstructions (i.e. walls, fences, hedges) over one metre in height. Reason: In the interests of vehicular and public safety and in order to achieve required sightlines. 6. Prior to any works commencing on the demolition of the hall or construction of the outbuilding, the vehicular access( es ) to the site shall be constructed as per standard detail drawing SD 08/005 and shall be constructed in consultation with the Roads Department of Development and Infrastructure Services. The gradient of the access shall not exceed 5% for the first 5m and 8% thereafter and the first 5m shall have a sealed surface to prevent debris running onto the public road/footway. Reason: In the interests of vehicular and public safety and in order to provide a suitable access. 7. Prior to the occupancy of the dwellinghouse (or temporary habitation of the outbuilding), a parking area for two vehicles, together with a turning area, shall be provided within the curtilage of the site and shall thereafter be retained in perpetuity for such a dedicated purpose, unless the prior consent for variation is obtained in writing from the planning authority. Reason: To ensure that adequate off-street car parking provision is provided. 8. The dwellinghouse shall not be occupied until the first 5m of the access onto the A815 from the lane serving Halftown Cottages has been constructed with a sealed surface in accordance with details to be submitted to and approved by the planning authority. Reason: In the interests of vehicular and public safety and in order to provide a suitable access. 9. No development work shall commence on site until full details regarding the proposed foul water drainage system including effluent discharge calculations have been submitted to and agreed in writing with the Planning Authority. Reason: To safeguard the waters of Loch Fyne , which are now a shellfish designation. 10. No building, engineering or tree-felling works shall commence until shall commence until a detailed scheme of all boundary treatments has been submitted to and approved in ... view the full minutes text for item 10.