Planning, Protective Services and Licensing Committee, Wednesday 21 September 2011 at 10.00am

ARGYLL AND BUTE COUNCIL: UPGRADING AND EXTENSION OF EXISTING NETWORK OF FOOTPATHS TO PROVIDE SHARED USE WALKING AND CYCLING PATHS: LAND NORTH OF SOROBA HOUSE HOTEL, OBAN (REF: 11/01400/PP)

Agreed Planning 2 papers

Planning, Protective Services and Licensing Committee agreed this item on Wednesday 21 September 2011. Below is the council's own wording, with the papers it was decided on.

Item13

Resolved

Decision Agreed to grant planning permission subject to the following conditions and reasons:- 1. Prior to the commencement of work on site, the access at the junction of the public road leading to the site shall be formed in accordance with Argyll & Bute Council Roads Department drawing number SD 08/005a with the access details as shown on the submitted drawing from the new back edge of the carriageway and shall have visibility splays of 2.4m x 42m in both directions formed from the centre line of the proposed access from Glengallan Road. Prior to work starting on site, these visibility splays shall be cleared of all obstructions over 1.05m in height above the level of the adjoining carriageway and thereafter shall be maintained clear of all obstructions over 1.05m in height in perpetuity. Reason: In the interests of road safety. 2. No development shall commence on site until full details of the proposed means of surface water drainage has been submitted and approved by the Planning Authority in writing. Such details shall include a drainage layout plan which shall include full details of the surface water discharge from the site and shall include any mitigation measures required to address surface water run-off, prevent ponding and prevent increased surface water run-off onto adjacent properties. The development shall thereafter be completed in strict accordance with this plan prior to the initial use of the path by members of the public. Reason: To ensure that there is a satisfactory drainage system in place for the development in the interests of health and amenity. 3. Except for the 40 windblown trees identified in the plans as requiring removal, no trees within the site shall be lopped, topped, felled or otherwise damaged without the prior written consent of the Planning Authority. Reason: To ensure that the visual, nature conservation interests and potential noise impacts associated with tree clearance alongside the hospital helipad, are fully considered prior to tree felling taking place and allow an opportunity for mitigation measures to be devised if additional tree felling is proposed. 4. The development shall be implemented in accordance with the details specified on the application form dated 29/7/11 and the approved drawing reference numbers: Plan 1 of 6 (Location Plan at scale of 1:5000) Plan 2 of 6 (Site Plan at scale of 1:1250) Plan 3 of 6 (Plans of Access Path to Glengallen Drive at scale of 1:100) Plan 4 of 6 (Plan of Access Paths to Balvicar Road at scale of 1:100) Plan 5 of 6 (Plan of Path at Hospital Gate, Plan of Junction at Soroba Hotel Road, Section C-C and Section D-D at scale of 1:100, 1:25) Plan 6 of 6 (Section E-E, Dropped Kerb Profile, Bollard Detail at scale of 1:25) unless the prior written approval of the planning authority is obtained for other materials/finishes/for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997 (as amended). Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. (Reference: Report by Head of Planning and Regulatory Services dated 2 September 2011, submitted)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Planning, Protective Services and Licensing Committee
This report is being read into text

Papers are read newest first, so recent reports come through within hours. Until then, open it at source.

Open the PDF

Papers for this item

Kept in our archive, download once signed in
PDF
1101400 location planPlan 467 KB Copy on its way
PDF
ARGYLL AND BUTE COUNCIL: UPGRADING AND EXTENSION OF EXISTING NETWORK OF FOOTPATHS TO PROVIDE SHARED USE WALKING AND CYCLING PATHS: LAND NORTH OF SOROBA HOUSE HOTEL, OBAN (REF: 11/01400/PP)Report 103 KB Copy on its way

At this meeting

Whole meeting
3MINUTESOn the agenda 4ARDKINGLAS ESTATE: ERECTION OF MIXED DEVELOPMENT COMPRISING 16 DWELLING HOUSES, 7 COMMERCIAL UNITS, CHILDCARE CENTRE, INSTALLATION OF SEWAGE TREATMENT SYSTEMS AND ACCESS IMPROVEMENTS: LAND ADJACENT TO ARDKINGLAS SAWMILL, CLACHAN, CAIRNDOW (REF: 09/00385/OUT)Agreed 5ADAMS (FLANSHAM) LTD: CHANGE OF USE OF AGRICULTURAL SHEDS TO A FIREWOOD PROCESSING UNIT: LAND NORTH WEST OF CAMIS ESKAN FARM HOUSE, HELENSBURGH (REF: 11/00213/PP)Decided 6CWP PROPERTY DEVELOPMENT AND INVESTMENT: ERECTION OF CLASS 1 FOODSTORE WITH ASSOCIATED DEVELOPMENT TO INCLUDE CAR PARKING, ACCESS ROAD, ROAD BRIDGE, PETROL FILLING STATION AND ENGINEERING WORKS: 361 ARGYLL STREET, DUNOON (REF: 10/00222/PPP)Agreed 7NATIONAL GRID PROPERTY: SITE FOR THE ERECTION OF RETAIL STORE (CLASS 1) WITH ASSOCIATED DEVELOPMENT INCLUDING ACCESS, CAR PARKIING AND LANDSCAPING: LAND AT FORMER GASWORKS, ARGYLL STREET/HAMILTON STREET, DUNOON (REF: 11/00689/PPP)Agreed 8MR DUNCAN CAMPBELL: SUB-DIVISION OF GARDEN GROUND, ERECTION OF DWELLINGHOUSE AND DETACHED GARAGE AND FORMATION OF NEW VEHICULAR ACCESS: 7 LAGGARY PARK, RHU, HELENSBURGH (REF: 11/00784/PP)Agreed 9MR A TEAR: ERECTION OF A 50 METRE WIND MONITORING METEOROLOGICAL MAST FOR A TEMPORARY PERIOD OF 14 MONTHS: ASCOG FARM, BALMORY ROAD, ASCOG, ISLE OF BUTE (REF: 11/00873/PP)Agreed 10OSBORNE INTERIORS LTD: ERECTION OF 3 DWELLINGHOUSES: LAND BETWEEN 19 TO 37 CUMBERLAND AVENUE, HELENSBURGH (REF: 11/00887/PP)Agreed 11MRS SARA MACLEAN: CONSTRUCTION OF CULVERT AND HANDRAILS: LAND NORTH WEST OF TIGHNABRUAICH PRIMARY SCHOOL, SCHOOL ROAD, TIGHNABRUAICH (REF: 11/01084/PP)Agreed 12SCOTTISH WATER: VARIATION OF CONDITION 3 OF PLANNING PERMISSION 10/01977/PP - AMENDMENTS TO EXTERNAL FINISHES OF KIOSK: LAND OPPOSITE 8 MARINE PLACE, ROTHESAY, ISLE OF BUTE (REF: 11/01310/PP)Agreed
13ARGYLL AND BUTE COUNCIL: UPGRADING AND EXTENSION OF EXISTING NETWORK OF FOOTPATHS TO PROVIDE SHARED USE WALKING AND CYCLING PATHS: LAND NORTH OF SOROBA HOUSE HOTEL, OBAN (REF: 11/01400/PP)This decision
14UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING DECISIONNoted 22TheOn the agenda 15ENFORCEMENT CASE: 00168ENFOTH2Private

On this subject at Argyll and Bute

Search all
  1. ARGYLL AND BUTE COUNCIL: UPGRADING AND EXTENSION OF EXISTING NETWORK OF FOOTPATHS TO PROVIDE SHARED USE WALKING AND CYCLING PATHS: LAND NORTH OF SOROBA HOUSE HOTEL, OBAN (REF: 11/01400/PP)This decision
  2. Argyll and bute outcomes and improvement plan - priorities updateNoted
  3. Argyll and Bute Climate Action NetworkNoted
  4. Argyll and bute improvement plan - priorities updateNoted
  5. Argyll and bute improvement plan - priorities updateNoted
  6. Argyll and bute harbour board workplanNoted

More from Argyll and Bute Planning, Protective Services and Licensing Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Beaufort wind limited: erection of 7 turbines (up to 149.9m to tip) and ancillary development and decommissioning of existing beinn ghlas wind farm: existing beinn ghlas wind farm, taynuilt (ref: 25/01240/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. PP - A... Agreed Open
15 Sep 2026 Mr tony coogan: alterations to guesthouse to facilitate lawful use of existing roof space as ancillary guest house owner's accommodation: greencourt, benvoullin road, oban (26/00434/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Mrs faulkes: proposed alterations and erection of extension: 30 the green, craobh haven (ref: 26/01009/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Scottish power renewables/machair wind limited: scottish government's marine directorate section 36 consultation on proposed machair offshore wind farm: site 15 km north west of isle of islay and 12.4 km west of isle of colonsay (ref: 26/01100/s36)Decision The Committee agreed that the Scottish Government’s Marine Directorate should be notified that Argyll and Bu... Agreed Open
15 Sep 2026 Development management performance update - fq1 2026/27Decision The Committee reviewed and agreed the content of the report. (Reference: Report by Executive Director with r... Agreed Open