GENESIS ENERGY LTD: ERECTION OF WIND TURBINE (60M TO HUB, 84M TO BLADE TIP), WITH ASSOCIATED SUBSTATION, CRANE PAD AND TEMPORARY HARDSTANDING AND THE UPGRADING OF 550M OF EXISTING FORESTRY TRACK: LAND NORTH EAST OF REDESDALE HOUSE, SKIPNESS HOUSE, TARBERT (REF: 11/00937/PP)

Agreed Planning 3 papers

Planning, Protective Services and Licensing Committee agreed this item on Wednesday 23 January 2013. Below is the council's own wording, with the papers it was decided on.

Item6

Resolved

Decision Agreed to refuse planning permission for the following reasons:- 1. The proposed turbine is located near a group of summits on an outlying series of low hills which form the upper end of the Kintyre peninsula and which are slightly set apart from the main plateau, within the ‘Upland Forest Moor Mosaic’ Landscape Character Type (ref ‘Argyll & Bute Landscape Wind Energy Capacity Study (LWECS) – Final main report and appendix March 2012’ - SNH/Argyll & Bute Council), and the proposal will influence a number of adjacent more sensitive coastal Landscape Character Types including: ‘Rocky Mosaic’ and ‘Coastal Parallel Ridges’. At 84 metres in height, the turbine would be at an elevation of c230m AOD to give a total height to blade tip of 314 AOD. Development on this scale would introduce large scale development on the skyline which would be likely to alter the perception of landform scale and impinge on the setting of the summits and which would also intrude into coastal panoramas to both the west and east, including offshore locations. The proposal constitutes an outlier from the established pattern of existing wind turbine development within the Kintyre peninsula, where it would not share the locational advantages of consented locations which do not exert such a degree of influence over the appreciation of the coast and those landscapes which are characterised by the contrast between the land and the sea. Scattered development elsewhere along the length of the peninsula is likely to have a wider impact on landscape character and scenic quality than consolidating the existing focus for development by intruding, as in this case, upon the landscape setting of West Loch Tarbert for example. The remainder of the spine is therefore sensitive in landscape terms to further development given that the ends of the peninsula are visually important as focal points in views up and down the coast and along the Sounds which increases their sensitivity. The proposal would therefore adversely affect the character, key views and qualities of this local landscape contrary to the advice given by the ‘Argyll and Bute Wind Energy Capacity Study’, which seeks to steer new turbine development involving Larger Typologies (80 – 130m) away from the more complex irregular small hills found on the outer edge of the Kintyre Peninsula, so as to avoid intrusion on the setting and views from the adjacent settled and small scale ‘Rocky Mosaic’. The presence of an isolated turbine on this scale would therefore give rise to disproportionate cumulative landscape impacts contrary to Local Plan Policy LP REN 1. The foregoing environmental considerations are of such magnitude that they cannot be reasonably offset by the projected direct or indirect benefits which a development of this scale would make to the achievement of climate change related commitments. Having due regard to the above, it is considered that this proposal would have a significant adverse impact on Landscape Character and contribute to the cumulative impact of wind turbine development in Kintyre. It is therefore inconsistent with the provisions of the Scottish Planning Policy and Scottish Government’s Specific Advice Sheet on Onshore Wind Farms; Policies STRAT SI 1: Sustainable Development; STRAT DC 5: Development in Sensitive Countryside, Policy STRAT DC 8: Landscape & Development Control; Policy STRAT RE 1: Wind Farm/Wind Turbine Development of the ‘Argyll & Bute Structure Plan’ (approved 2009) and Policies LP ENV 10: Development Impact on Areas of Panoramic Quality; LP REN 1: Commercial Wind Farm and Wind Turbine Development of the ‘Argyll & Bute Local Plan’ (adopted 2009); and the ‘Argyll & Bute Landscape Wind Energy Capacity Study’ (LWECS) – Final main report and appendix March 2012. 2. The proposal would have relatively high visibility, compared to other wind farm development on the peninsula, which benefits from the effects of the elevated topography of the spine of Kintyre which successfully restricts views of approved turbines from habitation, transport routes and more sensitive and scenic coastal locations. It would also break the skyline of Kintyre, spreading the extent of development on the skyline to the northern end of the peninsula which currently benefits from an absence of large scale turbine development. This proposal will result in an unacceptable level of visual impact due to its vertical scale; blade rotation and the fact that from certain sensitive receptors it will be skylined; out of scale with the landscape; and, will introduce an element which is uncharacteristic with the attributes of the landscape to be developed. This will result in a noticeable change to the visual character, composition and quality of views as experienced by the people associated with the sensitive receptors including: properties in close proximity; settlements; such as Whitehouse, the B8001 and National Cycle Route 73, ... view the full minutes text for item 6.
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Planning, Protective Services and Licensing Committee

Argyll and Bute Council Development and Infrastructure

Delegated or Committee Planning Application Report and Report of handling as required by Schedule 2 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2008 relative to applications for Planning Permission or Planning Permission in Principle ____________________________________________________________________________

Reference No: 11/00937/PP

Planning Hierarchy: Local

Applicant: [name removed], Genesis Energy Ltd

Proposal: Erection of wind turbine (60m to hub, 84m to blade tip), with associated substation, crane pad and temporary hardstanding and the upgrading of 550m of existing forestry track.

Site Address: Land North East Of Redesdale House, Skipness, Tarbert __________________________________________________________________________

DECISION ROUTE

Local Government Scotland Act 1973 ____________________________________________________________________________

(A) THE APPLICATION

(i) Development Requiring Express Planning Permission

• Erection of wind turbine, hub height 60m and rotor diameter of 48m (84m to blade tip); • Formation of crane hardstanding area; • Upgrading of 550m of existing forestry track; • Erection of electrical substation building; • Erection of temporary construction compound.

(ii) Other specified operations

•Borrow pit working to provide the aggregate required during construction (to be subject of separate planning application); • Connection to existing 33kV overhead line. _________________________________________________________________________

(B) RECOMMENDATION: This proposal is recommended for refusal for the reasons stated in this report. As a significant amount of representation overwhelmingly in support of Officers recommendation has been received it is considered that there is no added value to holding a Hearing. However, in the event Members are minded to approve the application Members should give consideration to holding a Discretionary Hearing. ____________________________________________________________________________ (C) HISTORY:

There is no relevant planning history ____________________________________________________________________________

(D) CONSULTATIONS:

Area Roads Manager (29th June 2011) – No objection subject to conditions relating to the dimensions of the connection with the public road; construction of the connection with the public road; provision of a turning facility large enough to accommodate an articulated lorry within the site; and no offloading of materials directly from the public road to be permitted.

Area Roads Manager (15th July 2011) – a revised response was issued by the Area Roads Manager recommending deferment, following submission of further information from the applicant, which highlighted the requirement for a Transport Plan. The conditions detailed in the previous response of 29th June 2011 continue to be recommended, with the addition of a condition requiring that no work commences on site until a Transport Plan (including materials, plant, equipment and labour) has been submitted for the approval of Roads & Amenity Services.

Scottish Natural Heritage (SNH) (30th August 2011) - do not object but have serious landscape, visual and cumulative concerns regarding the introduction of a turbine of the scale proposed in this location. SNH cannot comment on the impacts of the proposal on specially protected bird species until further information, has been submitted by the applicant.

SNH (1st November 2011) – advises the applicant in writing that having looked at the results of the ornithology survey work again and seeing the lack of activity in the area from target bird species SNH are of the view that there is unlikely to be a significant impact on bird species around the site. SNH are therefore satisfied that the 6 months of completed bird survey work is sufficient and that no further information will be required.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
11 00937 PP ROH AHKReport 280 KB DownloadRead as text
PDF
1100937PPReport 207 KB Download
PDF
GENESIS ENERGY LTD: ERECTION OF WIND TURBINE (60M TO HUB, 84M TO BLADE TIP), WITH ASSOCIATED SUBSTATION, CRANE PAD AND TEMPORARY HARDSTANDING AND THE UPGRADING OF 550M OF EXISTING FORESTRY TRACK: LAND NORTH EAST OF REDESDALE HOUSE, SKIPNESS HOUSE, TARBERT (REF: 11/00937/PP)Report 65 KB Download

At this meeting

Whole meeting
3MINUTESOn the agenda 4CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI FARE SCALE REVIEWAgreed 5REGULATORY SERVICES BALANCED SCORECARD 2012 - 2014Noted
6GENESIS ENERGY LTD: ERECTION OF WIND TURBINE (60M TO HUB, 84M TO BLADE TIP), WITH ASSOCIATED SUBSTATION, CRANE PAD AND TEMPORARY HARDSTANDING AND THE UPGRADING OF 550M OF EXISTING FORESTRY TRACK: LAND NORTH EAST OF REDESDALE HOUSE, SKIPNESS HOUSE, TARBERT (REF: 11/00937/PP)This decision
7ISLAY ESTATES COMPANY: SITE FOR PROPOSED BUSINESS UNITS AND 20 AFFORDABLE RESIDENTIAL PROPERTIES: LAND WEST OF BONDED STORES, STANALANE, BOWMORE, ISLAY (REF: 12/02239/PPP)Agreed 8PROPOSED PROGRAMME OF PLANNING TRAINING FOR MEMBERSAgreed

Who was there

13 of 14 attended
GB
Councillor Gordon BlairMember, apologies
RC
Councillor Rory ColvilleMember, present
RC
Councillor Robin CurrieMember, present
MD
Councillor Mary-Jean DevonMember, present
GF
Councillor George FreemanMember, present
FH
Councillor Fred HallMember, present
DK
Councillor David KinniburghMember, present
AM
Councillor Alistair MacDougallMember, present
RG
Councillor Robert Graham MacIntyreMember, present
DM
Councillor Donald MacMillan BEMMember, present
AM
Councillor Alex McNaughtonMember, present
JM
Councillor James McQueenMember, present

All 14 on the meeting page

More from Argyll and Bute Planning, Protective Services and Licensing Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Beaufort wind limited: erection of 7 turbines (up to 149.9m to tip) and ancillary development and decommissioning of existing beinn ghlas wind farm: existing beinn ghlas wind farm, taynuilt (ref: 25/01240/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. PP - A... Agreed Open
15 Sep 2026 Mr tony coogan: alterations to guesthouse to facilitate lawful use of existing roof space as ancillary guest house owner's accommodation: greencourt, benvoullin road, oban (26/00434/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Mrs faulkes: proposed alterations and erection of extension: 30 the green, craobh haven (ref: 26/01009/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Scottish power renewables/machair wind limited: scottish government's marine directorate section 36 consultation on proposed machair offshore wind farm: site 15 km north west of isle of islay and 12.4 km west of isle of colonsay (ref: 26/01100/s36)Decision The Committee agreed that the Scottish Government’s Marine Directorate should be notified that Argyll and Bu... Agreed Open
15 Sep 2026 Development management performance update - fq1 2026/27Decision The Committee reviewed and agreed the content of the report. (Reference: Report by Executive Director with r... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies