Resolved
Decision Agreed to hold a pre-determination hearing at the earliest opportunity. (Reference: Report by Head of Planning and Regulatory Services dated 4 April 2014, submitted)
Planning, Protective Services and Licensing Committee agreed this item on Wednesday 23 April 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision Agreed to hold a pre-determination hearing at the earliest opportunity. (Reference: Report by Head of Planning and Regulatory Services dated 4 April 2014, submitted)
Argyll and Bute Council Development & Infrastructure
Delegated or Committee Planning Application Report and Report of handling as required by Schedule 2 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2008 relative to applications for Planning Permission or Planning Permission in Principle ____________________________________________________________________________
Reference No: 13/02835/PP
Planning Hierarchy: Major
Applicant: RWE Innogy UK Limited
Proposal: Erection of 15 wind turbines of up to 111m in height to blade tip, including permanent foundations, associated hardstanding and electrical transformer buildings; construction of approximately 12.5km of new track and widening and upgrading of access tracks and road junction; erection of electrical substation and control building and temporary construction compound; erection of one permanent and two temporary anemometry masts up to 80m in height; and associated ancillary development.
Site Address: Ardchonnel Windfarm, approx 6.5km north-west of Inveraray and 1.5km east of Loch Awe. ____________________________________________________________________________
DECISION ROUTE
Local Government Scotland Act 1973 ____________________________________________________________________________
(A) THE APPLICATION
Development Requiring Express Planning Permission
• Erection of 15 wind turbines, (111m to blade tip) with external transformers at the base of each turbine (4m x 6m x 3m high); • Erection of substation compound (100m x 100m) control building (20m x 10m x 5.5m high), septic tank and 2.4m high security fencing; • Improvement of existing access to the A83(T) serving An Suidhe windfarm; • Localised widening of existing access track serving An Suidhe windfarm; • Formation of on-site access tracks (12.5km, 5m wide with passing places); • Installation of 15 watercourse crossings (two single span bridges and 13 culverts); • Installation of on-site underground cabling; • Formation of 15 crane hard-standing areas (55m x 20m); • Formation of temporary works compound and laydown area (75m x 75m); • Erection of permanent meteorological mast (80m); • Erection of 2 temporary calibration masts;
Other specified operations
• 132kv grid connection via new overhead line (subject to requirement for separate Section 37 Electricity Act consent); • Forestry felling along access route (0.23ha); • Formation of borrow pit workings (subject to requirement for separate mineral planning consents). ____________________________________________________________________________
(B) RECOMMENDATION: The application is recommended for refusal for the reasons stated in this report subject to a discretionary pre-determination hearing being held in response to the third party representations received, both for and against the proposal. ____________________________________________________________________________
(C) HISTORY: None relevant to the location of the proposed windfarm other than for anemometry. The access to the proposed development is to be by means of sharing and extending the existing access serving the operational An Suidhe windfarm.
01/01318/DET- Windfarm comprising 24 (80m high) turbines, new and improved access tracks, 2 anemometer masts, switchgear building and compound, An Suidhe Windfarm Dalmally – application granted 01.12.01.
08/01047/VARCON - Variation of conditions 1 and 22 of planning approval reference 01/01318/DET to extend energisation date to 31.03.11, increase turbine hub height to 56 metres and deletion of turbine no. 4, An Suidhe Windfarm Dalmally – application approved 31.07.08. ____________________________________________________________________________
(D) CONSULTATIONS:
Scottish Natural Heritage (17th March 2014) in summary has responded as follows:
- This proposal will have significant adverse visual impacts when viewed from settlements and the minor road on the west of Loch Awe and parts of the minor road around Loch Avich;
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
13 2835 plan, 10/04/2014 Pre-Agenda Briefing of the Planning, Protective Services and Licensing CommitteeAgenda | 1.8 MB | Download |
PDF |
RWE INNOGY UK LIMITED: ERECTION OF 15 WIND TURBINES OF UP TO 111M IN HEIGHT TO BLADE TIP, INCLUDING PERMANENT FOUNDATIONS, ASSOCIATED HARDSTANDING AND ELECTRICAL TRANSFORMER BUILDINGS; CONSTRUCTION OF APPROXIMATELY 12.5KM OF NEW TRACK AND WIDENING AND UPGRADING OF ACCESS TRACKS AND ROAD JUNCTION; ERReport | 433 KB | DownloadRead as text |
Follow Planning, Protective Services and Licensing Committee at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.