Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons:- 1. The development shall be implemented in accordance with the details specified on the application form dated 24 th September 2015 and the approved drawing reference numbers: · DRG. NO. - 2014_0054-00 (Location Plan) · DRG. NO. - 2014/054-00-02 (General Site Layout and Site Cross Section) · DRG. NO. - 2014/054-00-03 (Illustrative Cross Sections) · DRG. NO. - 2014_0054/01 (Site Plan) · DRG. NO. - 2014_0054/02 (Section through Stacking Area) · DRG. NO. - 2014_0054/03 (Pier Elevations) · DRG. NO - 2014_0054-04 (Passing Places) · Supplementary Location Plan unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. This permission shall cease on or before 10 years from the date on which this planning permission was granted; other than in the event of a further permission for retention of the temporary structure having been granted upon application to the Planning Authority. Within three months of the cessation of the permission the permitted structure(s) shall be removed, and the timber stacking area shall be restored in accordance with a reinstatement scheme to be submitted to and approved in advance in writing by the Planning Authority. In the event that the floating pier ceases to be in operational use for a continuous period in excess of six months the permitted structure(s) shall be removed, and the timber stacking area shall be restored in accordance with the terms of this condition, unless agreed otherwise in writing by the Planning Authority. For the avoidance of doubt, in that event the permission will have been deemed to have lapsed. Reason: To define the permission and in order to protect the amenity of the locale. 3. The development shall be implemented in accordance with the mitigation measures identified in Environmental Impact Assessment, Technical Annexes, Appendices and Mitigation detailed therein, prepared for JST (Floating Piers) Limited by Iona Hyde MSc, AA Tech. Cert., Aboricultural and Environmental Consultant, dated September 2015; unless otherwise agreed in advance in writing by the Planning Authority in consultation with Scottish Natural Heritage, Scottish Environment Protection Agency, the Council’s Marine and Coastal Development Manager; Local Biodiversity Officer or Access Manager (as relevant). Reason: In the interest of nature conservation and to safeguard the interests of other marine users. 4. No development shall commence until a tree survey identifying trees capable of retention within the small area of ancient woodland affected by the site, a tree protection plan to safeguard these trees during construction and a woodland restoration plan has been submitted to and approved in writing by the Planning Authority in consultation with SNH and the Local Biodiversity Officer. The survey shall include: the location, species, height, canopy spread and condition of each tree; details of all trees to be removed and the location and canopy spread of trees to be retained as part of the development; and a programme of measures for the protection of trees during construction works which shall include fencing at least one metre beyond the canopy spread of each tree in accordance with BS 5837:2005 “Trees in Relation to Construction”. Tree protection measures shall be implemented for the full duration of construction works in accordance with the duly approved scheme. No trees shall be lopped, topped or felled other than in accordance with the details of the approved scheme unless otherwise approved in writing by the Planning Authority. Reason: In order to retain important trees and secure an acceptable woodland restoration plan in the interests of nature conservation. 5. No development shall commence in relation to the permission hereby approved until such time as planning permission has been approved and the necessary improvement works completed at the junction of the A83 Trunk Road with the forest access road serving the site, in accordance with the requirements of Transport Scotland. Reason: To ensure that the standard of access layout complies with the current standards and that the safety of the traffic on the trunk road is not diminished. 6. No development shall commence in relation to the permission hereby approved until such time as a Footpath Diversion Order under Section 208 Town and Country Planning (Scotland) Act 1997 has been obtained to allow the existing Core Path C121 which bisects the site to be diverted. An accurate plan of the approved diversion, detailing surfacing, gradients and signage shall also be submitted ... view the full minutes text for item 6.